Article 40
SCHEDULE 13DOCUMENTS AND PLANS TO BE CERTIFIED
PART 1DOCUMENTS AND PLANS
(1)
Document name
| (2)
Document reference
| (3)
Revision number
| (4)
Date
|
---|
Access plan | EN010133/APP/C2.6 | C | January 2024 |
Book of reference | EN010133/APP/C4.3 | G | February 2024 |
Concept design parameters and principles | EN010133/APP/C7.15 | C | January 2024 |
Crown land plan | EN010133/APP/C2.12 | A | 6 April 2023 |
Environmental statement | EN010133/APP/C6.1-C6.5 | 1 | 11 January 2023 |
Important hedgerows plan | EN010133/APP/C2.11 | B | January 2024 |
Land plan | EN010133/APP/C2.2 | D | January 2024 |
Outline battery storage safety management plan | EN010133/APP/C7.9 | B | December 2023 |
Outline construction environmental management plan | EN010133/APP/C7.1 | D | February 2024 |
Outline construction traffic management plan | EN010132/APP/C6.3.14.2 | F | February 2024 |
Outline decommissioning statement | EN010133/APP/C7.2 | A | December 2023 |
Outline drainage strategy | EN010133/APP/C6.3.10.1 | 1 | 11 January 2023 |
Outline ecological protection and mitigation strategy | EN010133/APP/C7.19 | 1 | 11 January 2023 |
Outline landscape and ecological management plan | EN010133/APP/C7.3 | E | January 2024 |
Outline operational environmental management plan | EN010133/APP/C7.16 | D | February 2024 |
Outline public rights of way management plan | EN010133/APP/C6.3.14.3 | E | February 2024 |
Outline skills, supply chain and employment plan | EN010133/APP/C7.10 | A | January 2024 |
Outline soil management plan | EN010133/APP/C7.18 | B | December 2023 |
Public rights of way plan | EN010133/APP/C2.5 | E | February 2024 |
Streets plan | EN010133/APP/C2.13_A | E | February 2024 |
Works plan | EN010133/APP/C2.4 | C | January 2024 |
Written Scheme of Investigation | EN010133/APP/C8.2.14 | 1 | February 2024 |
PART 2SUBSTITUTE AND SUPPLEMENTARY DOCUMENTS
(1)
Originating Document
| (2)
Replacement or supplementary part
| (3)
Document reference
| (4)
Date
| (5)
Examination library reference
|
---|
Environmental statement | Chapter 4: Scheme Description | EX1/C6.2.4_A | October 2023 | [REP-012] |
Environmental Statement | Chapter 7: Climate Change | EX1/C6.2.7_A | October 2023 | [REP-014] |
Environmental Statement | Chapter 8: Landscape and Visual Impact | EX2/C6.2.8_A | November 2023 | [REP-012] |
Environmental Statement | Chapter 19: Soils and Agriculture | EX1/C6.2.19_A | October 2023 | [REP-010] |
Environmental Statement | Chapter 23: Summary of Significant Effects | EX2/C6.2.23_A | November 2023 | [REP2-010] |
Environmental Statement | Without Prejudice Archaeological WSI | EX5/8.2.14 | February 2024 | [REP5-035] |
Environmental Statement | Appendix 14.1: Transport Assessment | EX5s/C6.3.14.1_C | February 2024 | [REP5-014] |
Environmental Statement | Volume 4: Non-Technical Summary | EX4/C6.5_C | January 2024 | [REP4-033] |
Environmental Statement | Technical Note on Horizontal Directional Drilling and Cabling under the River Trent | EX5/C8.2.13 | February 2024 | [REP5-034] |
Environmental Statement | ES Addendum 9.1: Ecology and Biodiversity | EX4/C8.4.9.1 | December 2023 | [REP4-067] |
Environmental Statement | ES Addendum: Chapter 10:, Hydrology, Flood Risk and Drainage | EX1/C8.4.10.1 | October 2023 | [REP-076] |
Environmental Statement | ES Addendum: Chapter 10: Hydrology, Flood Risk and Drainage
Appendix C8.4.10.2: FRA Sequential and Exception Test
| EX3/C8.4.10.2 | December 2023 | [REP3-048] |
Environmental Statement | ES Addendum: Chapter 13: Archaeological Trial Trenching Evaluation Fieldwork Report for the Shared Cable Corridor | EX3/C8.4.13.1 | December 2023 | [REP3-049] |
Environmental Statement | ES Addendum: Chapter 13: Additional Archaeological Trial Trenching Interim Report | EX5/C8.4.13.2 | February 2024 | [REP5-048] |
Environmental Statement | ES Addendum: Appendix 16.1: Solar Photovoltaic Glint and Glare Study | EX1/C8.4.16.1 | October 2023 | [REP-077] |
Environmental Statement | ES Addendum: 21.1: Human Health and Wellbeing Effects | EX4/C8.4.21.1 | January 2024 | [REP4-068] |
Environmental Statement | ES Addendum: 21.2: Blyton Park Driving Centre | EX4/C8.4.21.2 | January 2024 | [REP4-069] |
Environmental Statement | ES Addendum: Updated Air Quality Impact Assessment of a Solar Panel Fire Incident | EX1/C8.4.17.1 | August 2023 | [REP-078] |
Environmental Statement | ES Addendum: Air Quality Impact Assessment of Battery Energy Storage Systems (BESS) Fire | EX2/C8.4.17.2_A | November 2023 | [REP2-071] |
Environmental Statement | ES Addendum: Cumulative Effects | EX5/C8.4.23.1 | February 2024 | [REP5-051] |
Environmental Statement | Technical Note on Cumulative Effects of Additional Schemes | EX4/C8.2.11 | January 2024 | [REP4-059] |
Environmental Statement | Joint Report on Interrelationships between Nationally Significant Infrastructure Projects | EX4/C8.1.8_D | February 2024 | [REP5-025] |