Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Work No. 1

1.  Within the area shown on sheets 1, 2 and 3 of the works plans as Work No. 1, a multi-user marine terminal for the import and export of bulk liquids including—

(a)Work No. 1a, within the area shown as such, being—

(i)an open piled approach jetty leading to a jetty head with a single berth with loading and unloading platforms and associated dolphins, fenders and walkways; and

(ii)supporting jetty topside infrastructure including marine loading arms, pipes, valves, pipe racks and other process equipment, roadways, footways, maintenance and access platforms, lighting infrastructure, utilities (including electrical systems, firewater systems, communication systems, security systems and potable water supply), ship access equipment, electrical rooms, control rooms, shelters, toxic refuge rooms and other berth furniture;

(b)a dredged pocket to create a berthing pocket;

(c)piling works and other construction works (including cathodic protection, scour prevention and remediation works); and

(d)related landside infrastructure including a jetty access ramp, flood defence access ramp, other access infrastructure, local flood defence works, pipelines, pipes, lighting infrastructure, utilities (including electrical systems, communication systems, security systems and potable water supply), drainage, culverts, traffic control systems, gates and fencing.