Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
1. If the particle size of the animal by-products to be rendered is more than 150 millimetres, the animal by-products must be reduced in size using equipment specified in the licence, set so that the particle size after reduction is no greater than 150 millimetres or such smaller size as the licence shall specify. The effectiveness of the equipment must be checked daily and its condition recorded. If checks disclose the existence of particles larger than is permitted in the licence, the process must be stopped and repairs made before the process is resumed.
2. After reduction the animal by-products must be heated to a core temperature greater than 100°C for at least 125 minutes, a core temperature greater than 110°C for at least 120 minutes and a core temperature greater than 120°C for at least 50 minutes.
3. The rendering must be carried out in a batch system.E+W
4. The animal by-products may be cooked such that the time-temperature requirements are achieved at the same time.E+W
1. If the particle size of the animal by-products to be rendered is more than 30 millimetres, the animal by-products must be reduced in size using equipment specified in the licence, set so that the particle size after reduction is no greater than 30 millimetres or such smaller size as the licence shall specify. The effectiveness of the equipment must be checked daily and its condition recorded. If checks disclose the existence of particles larger than is permitted in the licence, the process must be stopped and repairs made before the process is resumed.
2. After reduction, the animal by-products must be heated to a core temperature greater than 100°C for at least 95 minutes, a core temperature greater than 110°C for at least 55 minutes and a core temperature greater than 120°C for at least 13 minutes.
3. The rendering may be carried out in batch or continuous systems.E+W
4. The animal by-products may be cooked such that the time-temperature requirements are achieved at the same time.E+W
1. If the particle size of the animal by-products to be rendered is more than 30 millimetres, the animal by-products must be reduced in size using equipment specified in the licence, set so that the particle size after reduction is no greater than 30 millimetres or such smaller size as the licence shall specify. The effectiveness of the equipment must be checked daily and its condition recorded. If checks disclose the existence of particles larger than is permitted in the licence, the process must be stopped and repairs made before the process is resumed.
2. After reduction the animal by-products must be placed in a vessel with added fat and heated to a core temperature greater than 100°C for at least 16 minutes, a core temperature greater than 110°C for at least 13 minutes, a core temperature greater than 120°C for at least 8 minutes and a core temperature greater than 130°C for at least 3 minutes.
3. The rendering may be carried out in batch or continuous systems.E+W
4. The animal by-products may be cooked such that the time-temperature requirements are achieved at the same time.E+W
1. If the particle size of the animal by-products to be rendered is more than 50 millimetres, the animal by-products must be reduced in size using equipment specified in the licence, set so that the particle size after reduction is no greater than 50 millimetres or such smaller size as the licence shall specify. The effectiveness of the equipment must be checked daily and its condition recorded. If checks disclose the existence of particles larger than is permitted in the licence, the process must be stopped and repairs made before the process is resumed.
2. After reduction the animal by-products must be heated to a core temperature of more than 133°C for at least 20 minutes without interruption at a pressure of at least 3 bar.
3. The rendering may be carried out in batch or continuous systems.E+W
1. If the particle size of the animal by-products to be rendered is more than 20 millimetres, the animal by-products must be reduced in size using equipment specified in the licence, set so that the particle size after reduction is no greater than 20 millimetres or such smaller size as the licence shall specify. The effectiveness of the equipment must be checked daily and its condition recorded. If checks disclose the existence of particles larger than is permitted in the licence, the process must be stopped and repairs made before the process is resumed.
2. After reduction the animal by-products must be heated until they coagulate and then pressed so that fat and water are removed from the proteinaceous material. The proteinaceous material shall then be heated to a core temperature greater than 80°C for at least 120 minutes and a core temperature greater than 100°C for at least 60 minutes.
3. The rendering may be carried out in batch or continuous systems.E+W
4. The animal by-products may be cooked such that the time-temperature requirements are achieved at the same time.E+W
1. The premises must be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.
2. The raw material must be reduced in size by crushing so that the particle size does not exceed 30 mm. Final reduction equipment must be checked daily and its condition recorded. Any broken equipment must be repaired without delay to ensure that the final particle size is achieved.
3. The material must be passed into a steam heated vessel where a consistent level of hot liquid tallow is maintained by recycling tallow as appropriate. Passage of the raw material through the vessel must be controlled by means of displacement and mechanical restrictions to ensure that the cooked dried material is discharged with all of its residual moisture removed as water vapour. The maximum feed rate for raw material, the maximum tallow recycle rate, and the minimum discharge temperature will be set for the vessel in the licence for the premises granted under these Regulations. The material must be cooked at a temperature in excess of 100°C for at least 16 minutes, a temperature in excess of 110°C for at least 13 minutes, a temperature in excess of 120°C for at least 8 minutes and a temperature in excess of 130°C for at least 3 minutes. Material may be cooked so that two or more time/temperature requirements are carried out at the same time. The times and temperatures achieved during the cooking process must be recorded on a permanent recording system.
4. On discharge from the vessel, any surplus tallow not required to maintain the vessel’s operating level must be removed, and the material separated into its tallow and protein components. Protein and tallow must be stored separately.
5. All records must be kept for one year.
1. The premises must be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.
2. The raw material must be reduced in size by crushing so that the particle size does not exceed 20 mm. Final reduction equipment must be checked daily and its condition recorded. Any broken equipment must be repaired without delay to ensure that the final particle size is achieved.
3. The crushed material must then be passed to a pre-heater. Passage of the raw material through the pre-heater must be controlled by means of displacement and mechanical restrictions to ensure that the cooked material is discharged at a temperature of at least 80°C and in a form in which water and tallow can be removed from the protein residue.
4. The material discharged from the pre-heater must be passed through a screw press so adjusted that all water and tallow are removed from the protein residue.
5. The protein residue must be passed into a steam heated vessel. Passage of the protein residue through the vessel must be controlled by means of displacement and mechanical restrictions to ensure that the cooked dried protein is discharged with all of its residual moisture removed as water vapour. A maximum feed rate for protein residue and a minimum discharge temperature will be set for the vessel in the licence for the premises granted under these Regulations. The material must be maintained at a temperature in excess of 80°C for at least 120 minutes and a temperature in excess of 100°C for at least 60 minutes. Material may be cooked so that both time/temperature requirements are carried out at the same time. The times and temperatures achieved during the cooking process must be recorded on a permanent recording system.
6. Protein and tallow must be stored separately.
7. All records must be kept for one year.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: