Category of development | Fee payable |
---|
I. Operations |
---|
1The erection of dwellinghouses (other than development within category 6 below).
| aWhere the application is for outline planning permission, £220 for each 0.1 hectare of the site area, subject to a maximum of £5,500; bin other cases, £220 for each dwellinghouse to be created by the development, subject to a maximum of £11,000.
|
2The erection of buildings (other than buildings in categories 1,3,4,5 or 7).
| aWhere the application is for outline planning permission, £220 for each 0.1 hectare of the site area, subject to a maximum of £5,500; biwhere no floor space is to be created by the development, £110; iiwhere the area of gross floor space to be created b the development does not exceed 40 square metres £110; iiiwhere the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £220; and ivwhere the area of gross floor space to be created by the development exceeds 75 square metres, £220 for each 75 square metres, subject to a maximum of £11,000.
|
3The erection, on land used for the purposes of agriculture, of buildings to be used for agricultural purposes (other than buildings coming within category 4).
| aWhere the application is for outline planning permission, £220 for each 0.1 hectare of the site area, subject to a maximum of £5,500; biwhere the area of gross floor space to be created by the development does not exceed 465 square metres, £40; iiwhere the area of gross floor space to be created by the development exceeds 465 square metres but does not exceed 540 square metres, £220; and iiiwhere the area of gross floor space to be created by the development exceeds 540 square metres, £220 for the first 540 square metres and £220 for each 75 square metres in excess of that figure, subject to a maximum of £11,000.
|
4The erection of glasshouses on land used for the purposes of agriculture.
| aWhere the gross floor space to be created by the development does not exceed 465 square metres, £40;(b) where the gross floor space to be created by the development exceeds 465 square metres, £1,235.
|
5The erection, alteration or replacement of plant or machinery.
| £220 for each 0.1 hectare of the site area, subject to a maximum of £11,000. |
6The enlargement, improvement or other alteration of existing dwellinghouses.
| aWhere the application relates to one dwellinghouse, £110; bwhere the application relates to 2 or more dwellinghouses, £220.
|
7aThe carrying out of operations (including the erection of a building) within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such, or the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or bthe construction of carparks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.
| £110. |
8The carrying out of any operations connected with exploratory drilling for oil or natural gas.
| £220 for each 0.1 hectare of the site area, subject to a maximum of £16,500. |
9The carrying out of any operations not coming within any of the above categories.
| £110 for each 0.1 hectare of the site area, subject to a maximum of— - a
in the case of operations for the winning and working of minerals, £16,500; - b
in other cases, £1,100.
|
II. Uses of Land |
---|
10The change of use of a building to use as one or more separate dwellinghouses.
| aWhere the change of use is from a previous use as a single dwellinghouse to use as two or more single dwellinghouses, £220 for each additional dwellinghouse to be created by the development, subject to a maximum of £11,000; bin other cases, £220 for each dwellinghouse to be created by the development, subject to a maximum of £11,000.
|
11aThe use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land; or bfor use of land for the storage of minerals in the open.
| £110 for each 0.1 hectare of the site area, subject to a maximum of £16,500. |
12The making of a material change in the use of a building or land (other than a material change of use coming within any of the above categories).
| £220. |