1. The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of Swansea Bay adjoining the coast between Porthcawl in the County Borough of Bridgend and Port Talbot in the County Borough of Neath Port Talbot and on land within the County Borough of Neath Port Talbot—
Work No. 1 — A wind energy electrical generating station consisting of—
up to 30 wind turbines generators fixed to the seabed by one or more piles or gravity foundations and extending to a height of up to 130.5 metres above the level of high water, fitted with rotating blades and situated at the following locations—
Wind turbine number | Reference point Easting | Reference point Northing |
---|---|---|
1 | 269103 | 177986 |
2 | 269219 | 177481 |
3 | 269361 | 176982 |
4 | 269828 | 178465 |
5 | 269928 | 177953 |
6 | 270057 | 177448 |
7 | 270214 | 176951 |
8 | 270569 | 178920 |
9 | 270651 | 178407 |
10 | 270763 | 177901 |
11 | 270907 | 177402 |
12 | 271081 | 176912 |
13 | 271368 | 178982 |
14 | 271440 | 178540 |
15 | 271537 | 178103 |
16 | 271660 | 177672 |
17 | 271808 | 177250 |
18 | 271980 | 176836 |
19 | 272167 | 179040 |
20 | 272251 | 178566 |
21 | 272367 | 178099 |
22 | 272516 | 177641 |
23 | 272696 | 177195 |
24 | 272907 | 176762 |
25 | 272657 | 178920 |
26 | 273059 | 178614 |
27 | 273184 | 178160 |
28 | 273344 | 177716 |
29 | 273537 | 177286 |
30 | 273763 | 176872 |
a network of cables connecting the wind turbines to each other.
Work No. 2 — A connection between Work No. 1 and Work No. 2A consisting of up to four marine feeder cables along routes commencing by connections with one or more of the wind turbines, then proceeding in a north-easterly direction for 7.22 kilometres until they reach the shore and terminating by a connection with Work No. 2A.
Work No. 2A — An extension of the cables comprised in Work No. 2 buried underground, commencing in a junction box at reference point 277406E, 184576N, extending for 121 metres in an easterly direction and terminating in Work No. 3.
Work No. 3 — An electrical substation situated at 277527E, 184608N.
Work No. 4 — An onshore cable connection with the electrical grid consisting of two electric lines, commencing at Work No. 3 and carried overhead in a north-easterly direction to reference points 278758E, 185469N and 278784E, 185392N, then proceeding underground across the railway sidings and Swansea to London railway and terminating by a connection with the existing electricity pylon.
Work No. 5 — A new road providing a construction and maintenance access between Work No. 3 and the road known as the harbour road.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area. The revised version is currently only available in English.
Original (As Enacted or Made) - English: The original English language version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Original (As Enacted or Made) - Welsh:The original Welsh language version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: