SCHEDULE 1MINIMUM REQUIREMENTS FOR STRATEGIC NOISE MAPPING
Interpretation1
F11
In this Schedule—
“editable” (“y gellir eu golygu”) means in a format that allows (without the need for manipulation) the electronic production of—
- a
numerical data in tables, and
- b
graphical plots,
to display the information described in paragraphs 1.5, 1.6, 1.7, 2.5, 2.6 and 2.7 of Annex VI of the Directive;
- a
“grid” (“grid”) means a grid of vector points which are—
- a
at 10 metre by 10 metre intervals,
- b
spatially referenced to the British National Grid reference system used by the Ordnance Survey as a pair of integers to show Eastings then Northings in metres from the origin, and
- c
aligned with the 10 metre vertices of the British National Grid reference system used by the Ordnance Survey so that references finish with the number zero.
- a
F22
For the purposes of sub-paragraph (1), the reference to paragraphs 1.5, 1.6 and 2.6 of Annex VI of the Directive is to be read with the following modifications—
a
in paragraph 1.5, as if the reference in that paragraph to “major roads”, “major railways” and “major airports” as defined in Article 3 of the Directive was to “major road” (“prif ffordd”), “major railway” (“prif reilffordd”) and “major airport” (“prif faes awyr”) as defined in regulation 2(2) of these Regulations; and
b
in paragraphs 1.6 and 2.6, as if the words from “These data” to the end were omitted.
General requirements for strategic noise maps2
1
Strategic noise maps and their revisions must—
a
satisfy the minimum requirements laid down in Annex IV of the Directive; and
b
be clear and comprehensible.
2
In applying paragraph (1)(a) any reference in Annex IV of the Directive to—
a
Article 8 of the Directive is to be taken to be a reference to regulations 15, 17 and 19 of these Regulations;
b
Article 9 of the Directive is to be taken to be a reference to regulation 29 of these Regulations.
F33
For the purposes of sub-paragraph (1)(a), a reference to Annex IV of the Directive is to be read as if the following were omitted—
a
in paragraph 4, the first indent;
b
in paragraph 5, the words from “concerning” to “Commission”; and
c
paragraph 9.
Requirements for strategic noise maps for agglomerations3
1
This paragraph applies only to—
a
a strategic noise map made under regulation 7(1)(a), 7(2)(a), 12(1) or 12(2); or
b
a revision of such a strategic noise map.
2
Strategic noise maps must—
a
include the information (in electronic format) described in paragraphs 1.1 to 1.4 inclusive of Annex VI of the Directive; and
b
include editable numerical data in electronic form containing the values of Lden, Lnight and the supplementary noise indicators on a grid.
Requirements for strategic noise maps for major roads, major railways and major airports4
1
This paragraph applies only to—
a
any strategic noise map made under—
i
regulation 7(1)(b) to (d),
ii
regulation 7(2)(b) to (d),
iii
regulation 11(2); or
b
any revision of such a map.
2
Strategic noise maps must—
a
include the information (in electronic format) described in paragraphs 2.1 to 2.4 inclusive of Annex VI of the Directive; and
b
include editable numerical data in electronic form containing the values of Lden, Lnight and the supplementary noise indicators on a grid.