xmlns:atom="http://www.w3.org/2005/Atom"
Introductory Text
1.The new highway which the Welsh Ministers propose to construct...
2.The centre line of the new trunk road is indicated...
3.The lengths of the trunk road described in Schedule 2...
4.The Welsh Ministers are authorised to construct the new bridge...
5.In this Order: all measurements of distance are measured along...
6.This Order comes into force on 17 December 2008 The...
Signature
SCHEDULES
SCHEDULE 1
ROUTE OF THE NEW TRUNK ROAD
From a point on the trunk road 58 metres south...
SCHEDULE 2
LENGTHS OF THE A40 TRUNK ROAD CEASING TO BE TRUNK ROAD
Those lengths of the A40 trunk road ceasing to be...
SCHEDULE 3
SPECIFICATIONS OF BRIDGE OVER NAVIGABLE WATERCOURSE
A new bridge over the navigable waterway known as the...