Print Options
PrintThe Whole
Instrument
PrintThe
Schedules
only
Status:
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
SCHEDULE 1ROUTE OF MOTORWAY
A route starting on the Trunk Road (A) at a point 1.68 kilometres south of its junction with the M62 Motorway (marked ‘A’ on the map numbered 1 in the deposited plan) then going in a generally northerly direction for a distance of 15.59 kilometres (to a point marked ‘B’ on the map numbered 2 in the deposited plan).
SCHEDULE 2ROUTES OF THE CONNECTING ROADS
The routes of the connecting roads are routes in the Borough of Wakefield in the County of West Yorkshire and in the District of Selby in the County of North Yorkshire as follows:—
Junction with the M62 Motorway at Holmfield
1. Two routes to connect the southbound carriageway of the Motorway with the eastbound carriageway of the M62 Motorway at Holmfield (the connecting roads along these routes being given the reference numbers 1 and 2 on the map numbered 1 in the deposited plan), two routes to connect the northbound carriageway of the Motorway with the westbound carriageway of the M62 Motorway at Holmfield (the connecting roads along these routes being given the reference numbers 3 and 4 on the map numbered 1 in the deposited plan), a route to connect the southbound carriageway of the Motorway with the westbound carriageway of the M62 Motorway at Holmfield (the connecting road along this route being given the reference number 5 on the map numbered 1 in the deposited plan) and a route to connect the eastbound carriageway of the M62 Motorway with the northbound carriageway of the Motorway at Holmfield (the connecting road along this route being given the reference number 6 on the map numbered 1 in the deposited plan).
Junction with the Trunk Road (A63) at Selby Fork
2. Two routes to connect the northbound carriageway of the Motorway with a roundabout to be constructed as part of the A63 at Selby Fork Junction (the connecting roads along these routes being given the reference numbers 7 and 8 on the map numbered 1 in the deposited plan) and two routes to connect the southbound carriageway of the Motorway with a roundabout to be constructed as part of the A63 at Selby Fork Junction (the connecting roads along these routes being given the reference numbers 9 and 10 on the map numbered 1 in the deposited plan).
Yn ôl i’r brig