Regulation (EU) No 1303/2013 of the European Parliament and of the CouncilShow full title

Regulation (EU) No 1303/2013 of the European Parliament and of the Councilof 17 December 2013laying down common provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund, the European Agricultural Fund for Rural Development and the European Maritime and Fisheries Fund and laying down general provisions on the European Regional Development Fund, the European Social Fund, the Cohesion Fund and the European Maritime and Fisheries Fund and repealing Council Regulation (EC) No 1083/2006

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Status:

There are multiple versions of this provision on screen. These apply to different geographical extents. Help about Status

Close

Status

The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.

Sometimes the text of a provision is changed, but the change(s) only apply to a particular geographical area. In some limited cases where this happens, the editorial team create a version for each different geographical area. Multiple versions are only created in this way where the change in question is a substitution so that there are different versions of the text for the different extents. Insertions and repeals of text do not give rise to such multiple versions.

Changes to legislation:

Regulation (EU) No 1303/2013 of the European Parliament and of the Council, Article 65 is up to date with all changes known to be in force on or before 06 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Article 65:

  • Regulation amendment to earlier affecting provision 2020 asp17, ss. , 5 by 2024 asp 11 s. 23 25
  • Regulation amendment to earlier affecting provision 2020 asp17, ss. 2, 5 by 2024 asp 11 s. 22 25
  • Regulation amendment to earlier affecting provision 2020 asp17, ss. 4, 5 by 2024 asp 11 s. 24 25
  • Regulation disapplied by S.I. 2019/625 reg. 3 Sch. 1 (This amendment not applied to legislation.gov.uk. Regulations revoked (13.10.2020) by S.I. 2020/1114, regs. 1(2), 2)
  • Recital 10 Sentence 2 replacement by EUR 2018/1046 Regulation
  • Art. 65 words substituted by S.I. 2019/785 reg. 11(6)(a) (This amendment not applied to legislation.gov.uk. Reg. 11(6)(a) omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(9)(e)(i))
  • Art. 65(7) omitted by S.I. 2019/785 reg. 11(6)(c) (This amendment not applied to legislation.gov.uk. Reg. 11(6)(c) amended immediately before IP completion day by S.I. 2020/1542, reg. 13(9)(e)(iii))
  • Art. 65(8)(h) words substituted by S.I. 2019/785 reg. 11(6)(d)(ii)(bb) (This amendment not applied to legislation.gov.uk. Reg. 11(6)(d)(ii)(bb) omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(9)(e)(v)(bb))
  • Art. 65(9) words substituted by S.I. 2019/785 reg. 11(6)(e)(iii) (This amendment not applied to legislation.gov.uk. Reg. 11(6)(e)(iii) omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(9)(e)(vi))

Changes and effects yet to be applied to the whole legislation item and associated provisions

  • Annex 1 para. 2 heading words omitted in earlier amending provision S.I. 2019/785, reg. 18(3) by S.I. 2020/1542 reg. 13(11)(b)
  • Annex 1 para. 2 heading words substituted by S.I. 2019/785 reg. 18(3)
  • Art. 1(6) substituted by S.I. 2019/785 reg. 4(1)(d)(iii) (This amendment not applied to legislation.gov.uk. Reg. 4(1)(d)(iii) omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(2)(a)(iii))
  • Art. 2(39) words substituted by S.I. 2019/785 reg. 4(2)(s) (This amendment not applied to legislation.gov.uk. Reg. 4(2)(s) omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(2)(b)(viii))
  • Art. 126(a) words substituted by S.I. 2019/785 reg. 15(3)(a) (This amendment not applied to legislation.gov.uk. Reg. 15 omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(10))
  • Art. 126(g) words omitted by S.I. 2019/785 reg. 15(3)(b) (This amendment not applied to legislation.gov.uk. Reg. 15 omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(10))
  • Art. 126(h) omitted by S.I. 2019/785 reg. 15(3)(c) (This amendment not applied to legislation.gov.uk. Reg. 15 omitted immediately before IP completion day by virtue of S.I. 2020/1542, reg. 13(10))

Article 65E+N.I.Eligibility

1.The eligibility of expenditure shall be determined on the basis of national rules, except where specific rules are laid down in, or on the basis of, this Regulation or the Fund-specific rules.

2.Expenditure shall be eligible for a contribution from [F2support for rural development] if it has been incurred by a beneficiary and paid between the date of submission of the programme to the Commission or from 1 January 2014, whichever is earlier, and 31 December 2023. In addition, expenditure shall only be eligible for [F3support for rural development] if the relevant aid is actually paid by the paying agency between 1 January 2014 and 31 December 2023.

F43.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.In the case of costs reimbursed pursuant to points (b) and (c) of the first subparagraph of Article 67(1), the actions constituting the basis for reimbursement shall be carried out between 1 January 2014 and 31 December 2023.

F55.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6.Operations shall not be selected for support by [F6support for rural development] where they have been physically completed or fully implemented before the application for funding under the programme is submitted by the beneficiary to the managing authority, irrespective of whether all related payments have been made by the beneficiary.

F77.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8.This paragraph shall apply to operations which generate net revenue during their implementation and to which paragraphs 1 to 6 of Article 61 do not apply.

The eligible expenditure of the operation [F8receiving support for rural development] shall be reduced by the net revenue not taken into account at the time of approval of the operation directly generated only during its implementation, not later than at the final payment claim submitted by the beneficiary. Where not all the costs are eligible for co-financing, the net revenue shall be allocated pro rata to the eligible and non-eligible parts of the cost.

This paragraph shall not apply to:

(a)technical assistance;

(b)financial instruments;

(c)repayable assistance subject to an obligation for full repayment;

(d)prizes;

F9(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(f)operations for which public support takes the form of lump sums or standard scale unit costs provided that the net revenue has been taken into account ex ante;

(g)operations implemented under a joint action plan provided that the net revenue has been taken into account ex ante;

[F10(h)operations for which amounts or rates of support are defined in Annex II to [F11Regulation (EU) No 1305/2013] or in the EMFF Regulation with the exception of those operations for which reference is made to this paragraph in the EMFF Regulation; or]

[F10(i)operations for which the total eligible cost does not exceed EUR 100 000.]

For the purposes of this Article and Article 61, any payment received by the beneficiary arising from contractual penalties as a result of a breach of contract between the beneficiary and a third party or third parties or that has occurred as a result of the withdrawal of an offer by a third party chosen under public procurement rules (the 'deposit') shall not be considered as revenue and shall not be deducted from the eligible expenditure of the operation.

9.Expenditure that becomes eligible as a result of an amendment to a programme shall only be eligible from the date of submission to the [F12relevant authority] of the request for amendment F13....

The Fund-specific rules for the EMFF may derogate from the first subparagraph.

10.By way of derogation from paragraph 9, specific provisions on the starting date of eligibility may be established in [F14Regulation (EU) No 1305/2013].

[F15By way of derogation from paragraph 9, expenditure for operations for fostering crisis response capacities in the context of the COVID-19 outbreak shall be eligible as of 1 February 2020.]

[F1611.An operation may receive support for rural development or from one or more programmes and from CMO support or direct payment support or support under other retained direct EU legislation, provided that the expenditure declared is not declared more than once.]

Extent Information

E1This version of this provision applies to England and Northern Ireland only; separate versions have been created for Scotland and Wales

Textual Amendments

Article 65SEligibility

1.The eligibility of expenditure shall be determined on the basis of national rules, except where specific rules are laid down in, or on the basis of, this Regulation or the Fund-specific rules.

[F172.Expenditure is eligible for support for rural development if it has been incurred by a beneficiary and paid between 1 January 2021 and 31 December 2024.]

F183.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.In the case of costs reimbursed pursuant to points (b) and (c) of the first subparagraph of Article 67(1), the actions constituting the basis for reimbursement shall be carried out between 1 January [F192021] and 31 December [F202024].

F215.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6.Operations shall not be selected for support by [F22support for rural development] where they have been physically completed or fully implemented before the application for funding under the programme is submitted by the beneficiary to the managing authority, irrespective of whether all related payments have been made by the beneficiary.

F237.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8.This paragraph shall apply to operations which generate net revenue during their implementation and to which paragraphs 1 to 6 of Article 61 do not apply.

The eligible expenditure of the operation [F24receiving support for rural development] shall be reduced by the net revenue not taken into account at the time of approval of the operation directly generated only during its implementation, not later than at the final payment claim submitted by the beneficiary. Where not all the costs are eligible for co-financing, the net revenue shall be allocated pro rata to the eligible and non-eligible parts of the cost.

This paragraph shall not apply to:

(a)technical assistance;

(b)financial instruments;

(c)repayable assistance subject to an obligation for full repayment;

(d)prizes;

F25(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(f)operations for which public support takes the form of lump sums or standard scale unit costs provided that the net revenue has been taken into account ex ante;

(g)operations implemented under a joint action plan provided that the net revenue has been taken into account ex ante;

[F26(h)operations for which amounts or rates of support are defined in Annex II to [F27Regulation (EU) No 1305/2013] or in the EMFF Regulation with the exception of those operations for which reference is made to this paragraph in the EMFF Regulation; or]

[F26(i)operations for which the total eligible cost does not exceed [F28GBP 83,333].]

For the purposes of this Article and Article 61, any payment received by the beneficiary arising from contractual penalties as a result of a breach of contract between the beneficiary and a third party or third parties or that has occurred as a result of the withdrawal of an offer by a third party chosen under public procurement rules (the 'deposit') shall not be considered as revenue and shall not be deducted from the eligible expenditure of the operation.

9.Expenditure that becomes eligible as a result of an amendment to a programme shall only be eligible from the date of [F29adoption of that amendment by the Scottish Ministers.]

The Fund-specific rules for the EMFF may derogate from the first subparagraph.

10.By way of derogation from paragraph 9, specific provisions on the starting date of eligibility may be established in [F30Regulation (EU) No 1305/2013].

[F31By way of derogation from paragraph 9, expenditure for operations for fostering crisis response capacities in the context of the COVID-19 outbreak shall be eligible as of 1 February 2020.]

[F3211.An operation may receive support for rural development or from one or more programmes and from CMO support or direct payment support or support under other retained direct EU legislation, provided that the expenditure declared is not declared more than once.]

Extent Information

E2This version of this provision extends to Scotland only; a separate version has been created for England and Wales and Northern Ireland

Textual Amendments

Article 65WEligibility

1.The eligibility of expenditure shall be determined on the basis of national rules, except where specific rules are laid down in, or on the basis of, this Regulation or the [F33rural development] rules.

F342.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F353.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F364.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F375.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6.Operations shall not be selected for support by [F38support for rural development] where they have been physically completed or fully implemented before the application for funding under the programme is submitted by the beneficiary to the managing authority, irrespective of whether all related payments have been made by the beneficiary.

F397.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8.This paragraph shall apply to operations which generate net revenue during their implementation and to which paragraphs 1 to 6 of Article 61 do not apply.

The eligible expenditure of the operation [F40receiving support for rural development] shall be reduced by the net revenue not taken into account at the time of approval of the operation directly generated only during its implementation, not later than at the final payment claim submitted by the beneficiary. Where not all the costs are eligible for co-financing, the net revenue shall be allocated pro rata to the eligible and non-eligible parts of the cost.

This paragraph shall not apply to:

F41(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)financial instruments;

(c)repayable assistance subject to an obligation for full repayment;

(d)prizes;

F42(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(f)operations for which public support takes the form of lump sums or standard scale unit costs provided that the net revenue has been taken into account F43...;

(g)operations implemented under a joint action plan provided that the net revenue has been taken into account F44...;

F45(h). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F46(i)operations for which the total eligible cost does not exceed EUR 100 000.]

For the purposes of this Article and Article 61, any payment received by the beneficiary arising from contractual penalties as a result of a breach of contract between the beneficiary and a third party or third parties or that has occurred as a result of the withdrawal of an offer by a third party chosen under public procurement rules (the 'deposit') shall not be considered as revenue and shall not be deducted from the eligible expenditure of the operation.

9.Expenditure that becomes eligible as a result of an amendment to a programme shall only be eligible from the date of submission to the [F47relevant authority] of the request for amendment F48....

F49...

10.By way of derogation from paragraph 9, specific provisions on the starting date of eligibility may be established in [F50Regulation (EU) No 1305/2013].

F51...

[F5211.An operation may receive support for rural development or from one or more programmes and from CMO support F53... or support under other retained direct EU legislation, provided that the expenditure declared is not declared more than once.]

Extent Information

E3This version of this provision applies to Wales only; separate versions have been created for England, Scotland and Northern Ireland

Textual Amendments

F33Words in Art. 65(1) substituted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(a)

F34Art. 65(2) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(b)

F36Art. 65(4) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(c)

F41Art. 65(8)(a) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(d)(i)

F43Words in Art. 65(8)(f) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(d)(ii)

F44Words in Art. 65(8)(g) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(d)(iii)

F45Art. 65(8)(h) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(d)(iv)

F49Words in Art. 65(9) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(e)

F51Words in Art. 65(10) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(f)

F53Words in Art. 65(11) omitted (W.) in so far as it relates to domestic support for rural development (26.3.2021) by virtue of The Agricultural Support (Miscellaneous Amendments) (Wales) (EU Exit) Regulations 2021 (S.I. 2021/400), regs. 1(2), 6(24)(g)

Back to top

Options/Help

Print Options

You have chosen to open the Whole Regulation

The Whole Regulation you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources