Search Legislation

The Merchant Shipping (Passenger Ship Construction: Ships of Classes I, II and II(A)) Regulations 1998

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening Options

More Resources

Changes over time for: Section 10

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Passenger Ship Construction: Ships of Classes I, II and II(A)) Regulations 1998, Section 10. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Collision, machinery space and afterpeak bulkheads and shaft tunnelsU.K.

10.—(1) Every ship shall be provided with a collision bulkhead which shall be watertight up to the bulkhead deck and shall be fitted at a distance from the ship’s forward perpendicular of not less than 5 per cent of the length of the ship and not more than 3.0 metres plus 5 per cent of such length.

(2) Where, in a ship constructed on or after 1st September 1984, any part below the waterline extends forward of the forward perpendicular, the distances specified in paragraph (1) shall be measured from a point either—

(a)at the mid-point of the maximum length forward of the forward perpendicular of such an extension;

(b)at a horizontal distance forward of the forward perpendicular equal to 1.5 per cent of the length of the ship; or

(c)at a horizontal distance 3.0 metres forward of the forward perpendicular;

whichever gives the smallest measurement.

(3) Where a long forward superstructure is fitted, the forepeak or collision bulkhead on all passenger ships shall be extended weathertight to the next full deck above the bulkhead deck. The extension may only open forwards and shall be so arranged as to preclude the possibility of the bow door causing damage to it in the case of damage to, or detachment of, a bow door.

(4) The extension required in paragraph 3 need not be fitted directly above the bulkhead below, provided that no part of the extension is located outside of the limits specified in paragraph (1) or paragraph (2) as applicable. However, in ships constructed before 1st July 1997:

(a)where a sloping loading ramp forms part of the extension, the part of the extension which is more than 2.3 metres above the bulkhead deck may extend no more than 1 metre forward of the forward limit specified in paragraph (1) or paragraph (2) as applicable; and

(b)where the existing ramp does not comply with the requirements for acceptance as an extension to the collision bulkhead and the position of the ramp prevents the location of such extension within the limits specified in paragraph (1) or paragraph (2), as applicable, the extension may be situated within a limited distance aft of the aft limit specified in paragraph (1) or paragraph (2) as applicable. The limited distance aft should be no more than is necessary to ensure non-interference with the ramp. The extension to the collision bulkhead shall comply with the requirements of paragraph (3) and shall be so arranged as to preclude the possibility of the ramp causing damage to it in the case of damage to, or detachment of, the ramp.

(5) Ramps not meeting the requirements of paragraph (4) shall be disregarded as an extension of the collision bulkhead.

(6) Every ship shall be provided with a watertight afterpeak bulkhead and with watertight bulkheads dividing the space appropriated to the main and auxiliary propelling machinery, and boilers, if any, from other spaces. Such bulkheads shall be watertight up to the bulkhead deck provided that the afterpeak bulkhead may be stepped below the bulkhead deck if the safety of the ship as regards subdivision is not thereby impaired.

(7) The stern gland of every ship shall be situated in a watertight shaft tunnel or other watertight space separate from the stern tube compartment and of such a volume that if the tunnel or space is flooded the bulkhead deck will not be submerged. The stern tube shall be enclosed in a watertight compartment of moderate volume.

Commencement Information

I1Reg. 10 in force at 12.11.1998, see reg. 1(1)

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.