Search Legislation

The Explosives Regulations 2014

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

Changes over time for: Cross Heading: SUB-PART B: CONFORMITY ASSESSMENT

 Help about opening options

Changes to legislation:

There are currently no known outstanding effects for the The Explosives Regulations 2014, Cross Heading: SUB-PART B: CONFORMITY ASSESSMENT. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F1SUB-PART B: CONFORMITY ASSESSMENTU.K.

Textual Amendments

F1Pt. 13 (regs. 39-77) substituted for Pt. 13 (regs. 39-42) (and therefore original regs. 43, 44 renumbered as new regs. 78, 79, new reg. 80 substituted for original reg. 45 and original regs. 46-49 renumbered as new regs. 81-84) (20.4.2016) by The Explosives Regulations 2014 (Amendment) Regulations 2016 (S.I. 2016/315), regs. 1, 7, 8, 9 (with regs. 2(1), 15)

Presumption of conformityU.K.

65.(1) A civil explosive which is in conformity with a [F2designated] standard, or part of such a standard, F3... is to be presumed to be in conformity with the essential safety requirements covered by that standard, or that part of that standard.

(2) The presumption in paragraph (1) is rebuttable.

[F4Conformity assessment proceduresU.K.

66.(1) Assessment of conformity of a civil explosive is carried out by an approved body in accordance with the procedures set out in Schedule 17.

(2) For the assessment of conformity of a civil explosive, the manufacturer must follow one of the following procedures set out in Schedule 17—

(a)in Part 1 of Schedule 17, Type examination carried out by an approved body (Module B), and, at the choice of the manufacturer, one of the following procedures—

(i)in Part 2 of Schedule 17, conformity to type based on internal production control plus supervised product checks at random intervals (Module C2);

(ii)in Part 3 of Schedule 17, conformity to type based on quality assurance of the production process (Module D);

(iii)in Part 4 of Schedule 17, conformity to type based on product quality assurance (Module E);

(iv)in Part 5 of Schedule 17, conformity to type based on product verification (Module F);

(b)in Part 6 of Schedule 17, conformity based on unit verification (Module G).]

[F5Declaration] of conformityU.K.

67.  The F6... declaration of conformity for a civil explosive must—

(a)state that the fulfilment of the essential safety requirements has been demonstrated in respect of the civil explosive;

(b)contain the elements specified in [F7Schedule 17,] for the relevant conformity assessment procedure followed in respect of the civil explosive; and

(c)have the model structure set out in [F8Schedule 18.]

[F9UK] markingU.K.

68.(1) [F10The UK marking must be affixed visibly, legibly and indelibly—

(a)to the civil explosive; or

(b)where paragraph (1A) applies, to—

(i)a label affixed to the civil explosive; or

(ii)the accompanying documents.]

[F11(1A) For a period of [F12seven years] beginning with IP completion day, the UK marking may be affixed to—

(a)a label affixed to the civil explosive; or

(b)the accompanying documents.]

(2) Where [F13paragraph (1A) does not apply and] it is not possible or warranted, on account of the nature of the civil explosive, to affix the [F14UK] marking in accordance with paragraph (1), the [F14UK] marking must be affixed to—

(a)the packaging; and

(b)the accompanying documents.

(3) The [F15UK] marking must be followed by the identification number of the [F16approved] body which carried out the relevant conformity assessment procedure for the civil explosive, where that body is involved in the production control phase.

(4) The identification number of the [F17approved] body must be affixed—

(a)by the [F17approved] body itself; or

(b)under the instructions of the [F17approved] body, by the manufacturer or the manufacturer’s authorised representative.

(5) In the case of a civil explosive—

(a)manufactured for the manufacturer’s own use;

(b)transported and delivered unpackaged or in a mobile explosives manufacturing unit for its direct unloading into the blast-hole; or

(c)manufactured at the blasting site which is loaded immediately after being produced,

the [F18UK] marking must be affixed to the accompanying documents.]

Textual Amendments

F10Reg. 68(1) substituted (31.12.2020) by S.I. 2019/696, Sch. 16 para. 27(b) (as substituted by The Product Safety and Metrology etc. (Amendment etc.) (UK(NI) Indication) (EU Exit) Regulations 2020 (S.I. 2020/1460), reg. 1(4), Sch. 3 para. 10(5)(a))

F11Reg. 68(1A) inserted by S.I. 2019/696, Sch. 16 para. 27(ba) (as inserted by The Product Safety and Metrology etc. (Amendment etc.) (UK(NI) Indication) (EU Exit) Regulations 2020 (S.I. 2020/1460), reg. 1(4), Sch. 3 para. 10(5)(b))

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources