Search Legislation

The Recreational Craft Regulations 2017

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Section 44

 Help about opening options

Status:

There are multiple versions of this provision on screen. These apply to different geographical extents. Help about Status

Close

Status

The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.

Sometimes the text of a provision is changed, but the change(s) only apply to a particular geographical area. In some limited cases where this happens, the editorial team create a version for each different geographical area. Multiple versions are only created in this way where the change in question is a substitution so that there are different versions of the text for the different extents. Insertions and repeals of text do not give rise to such multiple versions.

Changes to legislation:

There are currently no known outstanding effects for the The Recreational Craft Regulations 2017, Section 44. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Design and constructionE+W+S

This section has no associated Explanatory Memorandum

44.—(1) With regard to the design and construction of recreational craft, the following conformity assessment procedures set out in [F1Schedule 15] apply—

(a)for design categories A and B referred to in paragraph 1 of Part A of Schedule 1—

(i)for recreational craft of hull length from 2.5 metres to less than 12 metres, any of the following modules—

(aa)Module A1 (internal production control plus supervised product testing);

(bb)Module B [F2(type examination)] together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);

(cc)Module G (conformity based on unit verification);

(dd)Module H (conformity based on full quality assurance);

(ii)for recreational craft of hull length from 12 metres to less than 24 metres, any of the following modules—

(aa)Module B [F2(type examination)] together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(bb)Module G (conformity based on unit verification);

(cc)Module H (conformity based on full quality assurance);

(b)for design category C referred to in paragraph 1 of Part A of Schedule 1—

(i)for recreational craft of hull length from 2.5 metres to less than 12 metres where the [F3designated] standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are complied with, any of the following modules—

(aa)Module A (internal production control);

(bb)Module A1 (internal production control plus supervised product testing);

(cc)Module B ([F4type examination] together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(dd)Module G (conformity based on unit verification);

(ee)Module H (conformity based on full quality assurance);

(ii)for recreational craft of hull length from 2.5 metres to less than 12 metres where the [F3designated] standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are not complied with, any of the following modules—

(aa)Module A1 (internal production control plus supervised testing);

(bb)Module B ([F4type examination]) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;

(cc)Module G (conformity based on unit verification);

(dd)Module H (conformity based on full quality assurance);

(iii)for recreational craft of hull length from 12 metres to 24 metres, any of the following modules—

(aa)Module B ([F4type examination]) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;

(bb)Module G (conformity based on unit verification);

(cc)Module H (conformity based on full quality assurance);

(c)for design category D referred to in paragraph 1 of Part A of Schedule 1 for recreational craft of hull length of 2.5 metres to 24 metres, any of the following modules—

(i)Module A (internal production control);

(ii)Module A1 (internal production control plus supervised testing);

(iii)Module B ([F5type examination] together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);

(iv)Module G (conformity based on unit verification);

(v)Module H (conformity based on full quality assurance).

(2) With regard to the design and construction of personal watercraft, any of the following procedures set out in [F6Schedule 15] apply—

(a)Module A (internal production control);

(b)Module A1 (internal production control plus supervised testing);

(c)Module B ([F7type examination] together with Module C conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(d)Module G (conformity based on unit verification);

(e)Module H (conformity based on full quality assurance).

(3) With regard to the design and construction of components any of the following procedures set out in [F8Schedule 15] apply—

(a)Module B [F9(type examination)] together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(b)Module G (conformity based on unit verification);

(c)Module H (conformity based on full quality assurance).

Extent Information

E1This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Commencement Information

I1Reg. 44 in force at 3.8.2017, see reg. 1

Design and constructionN.I.

44.—(1) With regard to the design and construction of recreational craft, the following conformity assessment procedures set out in Annex II to Decision 768/2008/EC apply—

(a)for design categories A and B referred to in paragraph 1 of Part A of Schedule 1—

(i)for recreational craft of hull length from 2.5 metres to less than 12 metres, any of the following modules—

(aa)Module A1 (internal production control plus supervised product testing);

(bb)Module B (EU-type examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);

(cc)Module G (conformity based on unit verification);

(dd)Module H (conformity based on full quality assurance);

(ii)for recreational craft of hull length from 12 metres to less than 24 metres, any of the following modules—

(aa)Module B (EU-type examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(bb)Module G (conformity based on unit verification);

(cc)Module H (conformity based on full quality assurance);

(b)for design category C referred to in paragraph 1 of Part A of Schedule 1—

(i)for recreational craft of hull length from 2.5 metres to less than 12 metres where the harmonised standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are complied with, any of the following modules—

(aa)Module A (internal production control);

(bb)Module A1 (internal production control plus supervised product testing);

(cc)Module B (EU type-examination together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(dd)Module G (conformity based on unit verification);

(ee)Module H (conformity based on full quality assurance);

(ii)for recreational craft of hull length from 2.5 metres to less than 12 metres where the harmonised standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are not complied with, any of the following modules—

(aa)Module A1 (internal production control plus supervised testing);

(bb)Module B (EU type-examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;

(cc)Module G (conformity based on unit verification);

(dd)Module H (conformity based on full quality assurance);

(iii)for recreational craft of hull length from 12 metres to 24 metres, any of the following modules—

(aa)Module B (EU type-examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;

(bb)Module G (conformity based on unit verification);

(cc)Module H (conformity based on full quality assurance);

(c)for design category D referred to in paragraph 1 of Part A of Schedule 1 for recreational craft of hull length of 2.5 metres to 24 metres, any of the following modules—

(i)Module A (internal production control);

(ii)Module A1 (internal production control plus supervised testing);

(iii)Module B (EU- type examination together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);

(iv)Module G (conformity based on unit verification);

(v)Module H (conformity based on full quality assurance).

(2) With regard to the design and construction of personal watercraft, any of the following procedures set out in Annex II to Decision 768/2008/EC apply—

(a)Module A (internal production control);

(b)Module A1 (internal production control plus supervised testing);

(c)Module B (EU type-examination together with Module C conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(d)Module G (conformity based on unit verification);

(e)Module H (conformity based on full quality assurance).

(3) With regard to the design and construction of components any of the following procedures set out in Annex II to Decision 768/2008/EC apply—

(a)Module B (EU type-examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);

(b)Module G (conformity based on unit verification);

(c)Module H (conformity based on full quality assurance).

Extent Information

E2This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Commencement Information

I2Reg. 44 in force at 3.8.2017, see reg. 1

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources