- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
1.The Birmingham City Council (Grand Union Canal Bridge) Scheme 1992...
2.The said Scheme as confirmed (hereinafter referred to as “the...
4.This Instrument may be cited as the Birmingham City Council...
THE BIRMINGHAM CITY COUNCIL (GRAND UNION CANAL BRIDGE) SCHEME 1992
POINTS OF COMMENCEMENT AND TERMINATION
A single span of 23.00 metres (show distance between abutments)....
29.5 metres (total width measured square); consisting of 14.75 metres...
Pre–stressed concrete beam and composite deck, reinforced concrete abutments to...
Grand Union Canal (a minimum clear navigable waterway of 13.5...
Location Plan and General arrangement of bridge and specification plan...
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: