Search Legislation

The Transportable Pressure Vessels Regulations 2001

Status:

This is the original version (as it was originally made).

  1. Introductory Text

  2. PART I PRELIMINARY

    1. 1.Citation and Commencement

    2. 2.Interpretation

    3. 3.Application

  3. PART II GENERAL REQUIREMENTS

    1. 4.Requirements relating to the placing on the market and use at work of transportable pressure vessels

    2. 5.Transportable pressure vessels placed on the market or used at work exclusively in Great Britain

    3. 6.Reassessment of conformity

    4. 7.Periodic inspection and repeated use

    5. 8.Notified bodies

    6. 9.Approved bodies

    7. 10.Appointment of notified bodies and approved bodies by the Executive

    8. 11.Conformity marking

  4. PART III MISCELLANEOUS

    1. 12.Fees

    2. 13.Defence

    3. 14.Amendments and saving

  5. Signature

    1. SCHEDULE 1

      DISAPPLICATIONS TO THESE REGULATIONS

      1. 1.These Regulations shall not apply to— (a) gas cylinders used...

      2. 2.These Regulations shall not apply to any transportable pressure vessel...

      3. 3.These Regulations shall not apply to transportable pressure vessels—

    2. SCHEDULE 2

      STANDARDS

      1. 1.In respect of materials— (a) EN ISO 11114-1:1997, entitled “Transportable...

      2. 2.In respect of cylinders— (a) Annex I, Parts 1 to...

      3. 3.In respect of closures— (a) EN 849:1996 (except Annex A),...

      4. 4.In respect of markings— (a) EN 1089-1:1996, entitled “Transportable gas...

    3. SCHEDULE 3

      CONFORMITY ASSESSMENT PROCEDURES

      (This Schedule substantially reproduces the provisions of Part 1 of Annex IV to the Transportable Pressure Equipment Directive)

      1. 1.Module A—internal production control

      2. 2.The manufacturer must draw up the technical documentation described in...

      3. 3.The technical documentation must enable an assessment to be made...

      4. 4.The manufacturer, or his authorised representative established within the Community,...

      5. 5.The manufacturer must take all measures necessary to ensure that...

      6. Module A1—internal manufacturing checks with monitoring of the final assessment

      7. 1.Module B—EC type-examination

      8. 2.The application for EC-type-examination must be lodged by the manufacturer...

      9. 3.The technical documentation must enable an assessment to be made...

      10. 4.The notified body must:

      11. 4.1.examine the technical documentation, verify that the type has been...

      12. 4.2.perform or have performed the appropriate examinations and necessary tests...

      13. 4.3.perform or have performed the appropriate examinations and necessary tests...

      14. 4.4.agree with the applicant the location where the examinations and...

      15. 5.Where the type satisfies the relevant provisions of these Regulations,...

      16. 6.The applicant must inform the notified body that holds the...

      17. 7.Each notified body must communicate to the member States the...

      18. 8.The other notified bodies may receive copies of the EC...

      19. 9.The manufacturer, or his authorised representative established within the Community,...

      20. 1.Module B1—EC design examination

      21. 2.The manufacturer, or his authorised representative established within the Community,...

      22. 3.The technical documentation must enable an assessment to be made...

      23. 4.The notified body must:

      24. 4.1.examine the technical documentation and identify the components which have...

      25. 4.2.perform the necessary examinations to establish whether the solutions adopted...

      26. 4.3.perform the necessary examinations to establish whether the relevant provisions...

      27. 5.Where the design meets the relevant provisions of these Regulations...

      28. 6.The applicant must inform the notified body that holds the...

      29. 7.Each notified body must communicate to the member States the...

      30. 8.The other notified bodies may on request obtain the relevant...

      31. 9.The manufacturer, or his authorised representative established within the Community,...

      32. 1.Module C1—conformity to type

      33. 2.The manufacturer must take all measures necessary to ensure that...

      34. 3.The manufacturer, or his authorised representative established within the Community,...

      35. 4.Final assessment must be subject to monitoring in the form...

      36. 1.Module D—production quality assurance

      37. 2.The manufacturer must operate an approved quality system for production,...

      38. 3.Quality system

      39. 3.1.The manufacturer must lodge an application for assessment of his...

      40. 3.2.The quality system must ensure compliance of the transportable pressure...

      41. 3.3.The notified body must assess the quality system to determine...

      42. 3.4.The manufacturer must undertake to fulfil the obligations arising out...

      43. 4.Surveillance under the responsibility of the notified body

      44. 4.1.The purpose of surveillance is to ensure that the manufacturer...

      45. 4.2.The manufacturer must allow the notified body access for inspection...

      46. 4.3.The notified body must carry out periodic audits to make...

      47. 4.4.In addition, the notified body may pay unexpected visits to...

      48. 5.The manufacturer must, for a period of 10 years after...

      49. 6.Each notified body must communicate to the member States the...

      50. 1.Module D1—production quality assurance

      51. 2.The manufacturer must draw up the technical documentation described below....

      52. 3.The manufacturer must operate an approved quality system for production,...

      53. 4.Quality system

      54. 4.1.The manufacturer must lodge an application for assessment of his...

      55. 4.2.The quality system must ensure compliance of the transportable pressure...

      56. 4.3.The notified body must assess the quality system to determine...

      57. 4.4.The manufacturer must undertake to fulfil the obligations arising out...

      58. 5.Surveillance under the responsibility of the notified body

      59. 5.1.The purpose of surveillance is to make sure that the...

      60. 5.2.The manufacturer must allow the notified body access for inspection...

      61. 5.3.The notified body must carry out periodic audits to make...

      62. 5.4.In addition, the notified body may pay unexpected visits to...

      63. 6.The manufacturer must, for a period of 10 years after...

      64. 7.Each notified body must communicate to the member States the...

      65. 1.Module E—product quality assurance

      66. 2.The manufacturer must operate an approved quality system for production,...

      67. 3.Quality system

      68. 3.1.The manufacturer must lodge an application for assessment of his...

      69. 3.2.Under the quality system, each transportable pressure vessel must be...

      70. 3.3.The notified body must assess the quality system to determine...

      71. 3.4.The manufacturer must undertake to fulfil the obligations arising out...

      72. 4.Surveillance under the responsibility of the notified body

      73. 4.1.The purpose of surveillance is to ensure that the manufacturer...

      74. 4.2.The manufacturer must allow the notified body access for inspection...

      75. 4.3.The notified body must carry out periodic audits to make...

      76. 4.4.In addition, the notified body may pay unexpected visits to...

      77. 5.The manufacturer must, for a period of 10 years after...

      78. 6.Each notified body must communicate to the member States the...

      79. 1.Module E1—production quality assurance

      80. 2.The manufacturer must draw up the technical documentation described below....

      81. 3.The manufacturer must operate an approved quality system for the...

      82. 4.Quality system

      83. 4.1.The manufacturer must lodge an application for assessment of his...

      84. 4.2.Under the quality system, each transportable pressure vessel must be...

      85. 4.3.The notified body must assess the quality system to determine...

      86. 4.4.The manufacturer must undertake to discharge the obligations arising from...

      87. 5.Surveillance under the responsibility of the notified body

      88. 5.1.The purpose of surveillance is to make sure that the...

      89. 5.2.The manufacturer must allow the notified body access for inspection...

      90. 5.3.The notified body must carry out periodic audits to make...

      91. 5.4.In addition, the notified body may pay unexpected visits to...

      92. 6.The manufacturer must, for a period of 10 years after...

      93. 7.Each notified body must communicate to the member States the...

      94. 1.Module F—product verification

      95. 2.The manufacturer must take all measures necessary to ensure that...

      96. 3.The notified body must perform the appropriate examinations and tests...

      97. 4.Verification by examination and testing of each transportable pressure vessel...

      98. 4.1.Each transportable pressure vessel must be individually examined and must...

      99. 4.2.The notified body must affix its identification number or have...

      100. 4.3.The manufacturer, or his authorised representative established within the Community,...

      101. 1.Module G—EC unit verification

      102. 2.The manufacturer must apply to a notified body of his...

      103. 3.The technical documentation must enable the conformity of the transportable...

      104. 4.The notified body must examine the design and construction of...

      105. 4.1.The notified body must affix its identification number or have...

      106. 4.2.The manufacturer, or his authorised representative established within the Community,...

      107. 1.Module H—full quality assurance

      108. 2.The manufacturer must implement an approved quality system for design,...

      109. 3.Quality system

      110. 3.1.The manufacturer must lodge an application for assessment of his...

      111. 3.2.The quality system must ensure compliance of the transportable pressure...

      112. 3.3.The notified body must assess the quality system to determine...

      113. 3.4.The manufacturer must undertake to fulfil the obligations arising out...

      114. 4.Surveillance under the responsibility of the notified body

      115. 4.1.The purpose of this surveillance is to make sure that...

      116. 4.2.The manufacturer must allow the notified body access for inspection...

      117. 4.3.The notified body must carry out periodic audits to make...

      118. 4.4.In addition, the notified body may pay unexpected visits to...

      119. 5.The manufacturer must, for a period of 10 years after...

      120. 6.Each notified body must communicate to the member States the...

      121. 1.Module H1—full quality assurance with design examination and special surveillance of the final test

      122. 2.Final assessment is subject to increased surveillance in the form...

    4. SCHEDULE 4

      MODULES TO BE FOLLOWED FOR CONFORMITY ASSESSMENT

      (This Schedule substantially reproduces the provisions of Annex V to the Transportable Pressure Equipment Directive)

    5. SCHEDULE 5

      CONFORMITY REASSESSMENT PROCEDURE

      (This Schedule substantially reproduces the provisions of Part II of Annex IV to the Transportable Pressure Equipment Directive)

      1. 1.This procedure describes the method for ensuring that transportable pressure...

      2. 2.The owner must make available to a notified body information...

      3. 3.The notified body must check whether transportable pressure vessels which...

      4. 4.If the results of the above checks are satisfactory, the...

      5. 5.For vessels manufactured in series, including their valves and other...

    6. SCHEDULE 6

      PERIODIC INSPECTION PROCEDURES

      (This Schedule substantially reproduces the provisions of Part III of Annex IV to the Transportable Pressure Equipment Directive)

      1. 1.Module 1—periodic inspection of products

      2. 2.To meet the requirements referred to in paragraph 1, the...

      3. 3.The notified or approved body must perform the appropriate examinations...

      4. 3.1.All transportable pressure vessels must be examined individually and appropriate...

      5. 3.2.The notified or approved body must affix, or have affixed,...

      6. 3.3.The owner or his authorised representative established in the Community...

      7. 1.Module 2—periodic inspection through quality assurance

      8. 2.The owner or his authorised representative established in the Community...

      9. 3.Quality system

      10. 3.1.The owner or his authorised representative established in the Community...

      11. 3.2.Under the quality system, each transportable pressure vessel must be...

      12. 3.3.The notified body must assess the quality system to determine...

      13. 3.4.The owner or his authorised representative established in the Community...

      14. 4.Surveillance under the responsibility of the notified body

      15. 4.1.The purpose of surveillance is to make sure that the...

      16. 4.2.The owner or his authorised representative established in the Community...

      17. 4.3.The notified body must carry out periodic audits to make...

      18. 4.4.In addition, the notified body may pay unannounced visits to...

      19. 5.The owner or his authorised representative established in the Community...

    7. SCHEDULE 7

      CONFORMITY MARKING

    8. SCHEDULE 8

      AMENDMENTS TO THE CDGCPL REGULATIONS

      1. 1.The CDGCPL Regulations shall be amended in accordance with the...

      2. 2.In regulation 1, for the words “1st July 2001” there...

      3. 3.In regulation 2(1)— (a) for the definition of “competent person”...

      4. 4.For paragraphs (4) and (5) of regulation 3, there shall...

      5. 5.Regulations 12 to 17 shall be deleted.

      6. 6.In regulation 19, for paragraph (5) there shall be substituted...

      7. 7.Paragraph (10) of regulation 21 shall be deleted.

      8. 8.In Schedule 4— (a) in paragraph 1, for the words...

      9. 9.Schedule 7 shall be deleted.

      10. 10.For Schedule 8 there shall be substituted the following Schedule—...

      11. 11.In Schedule 9— (a) in paragraph 2, for the words...

  6. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources