Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Statutory Instruments

2006 No. 1466

TRANSPORT AND WORKS, ENGLAND AND WALES

TRANSPORT, ENGLAND AND WALES

CANALS AND INLAND WATERWAYS, ENGLAND AND WALES

The Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006

Made

3rd June 2006

Laid before Parliament

8th June 2006

Coming into force

11th September 2006

The Secretary of State for Transport makes the following Rules in exercise of the powers conferred by sections 6, 6A, 7(3)(b) and (c) and (4) and 10 of the Transport and Works Act 1992 M1. In so far as these Rules relate to Wales they are made with the agreement of the National Assembly for Wales M2.

Modifications etc. (not altering text)

C1Rules: power to amend or revoke conferred (26.12.2023) by Levelling Up and Regeneration Act 2023 (c. 55), ss. 164(3), 255(5), Sch. 14 Pt. 1 (with s. 247)

Marginal Citations

M11992 c. 42, as amended by S.I. 1998/2226, 2000/3199 and 2006/958.

M2For the requirement for agreement to the exercise of functions in relation to Wales, see article 5(1) of, and Schedule 2 to, the National Assembly for Wales (Transfer of Functions) Order 1999 (S.I. 1999/672) and the entry in Schedule 2 relating to the Transport and Works Act 1992.

Citation and commencementE+W+S

1.—(1) These Rules may be cited as the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006.

(2) These Rules shall come into force on 11th September 2006.

RevocationE+W+S

2.  Subject to rule 3, the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000 M3 (“the 2000 Rules”) are hereby revoked.

Marginal Citations

Transitional provisionsE+W+S

3.—(1) Where an application has been made under the 2000 Rules before the date of coming into force of these Rules and the Secretary of State has not, before that date, either made an order pursuant to that application or notified the applicant that he has decided not to make such an order, the 2000 Rules shall continue to have effect in relation to that application and these Rules shall not apply in relation to it.

(2) Where these Rules apply to an application but before the making of the application the applicant or the Secretary of State has carried out an action in pursuance of the 2000 Rules which could have been done under a corresponding provision in these Rules, that action will have effect as if it had been carried out under, or in relation to, the corresponding provision in these Rules.

Interpretation and noticesE+W+S

4.—(1) In these Rules (unless the context otherwise requires) references to sections are references to sections of the Transport and Works Act 1992 and—

the 2000 Rules” means the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000;

the Act” means the Transport and Works Act 1992;

address” includes any number or address used for the purposes of electronic transmission;

application” means an application under section 6 and “applicant” means a person making, or proposing to make, an application;

banks” in relation to an inland waterway referred to in a category in Schedule 5 or 6 to these Rules has the meaning given in section 72(1) of the Land Drainage Act 1991 M4;

bridleway” has the same meaning as in the Highways Act 1980 M5;

byway” means a way shown and described as a byway open to all traffic or a road used as a public path in a definitive map and statement, as defined in section 53(1) of the Wildlife and Countryside Act 1981 M6;

Crown interest” means a Crown or Duchy interest within the meaning of section 25(2);

cycle track” has the same meaning as in the Highways Act 1980;

[F1“the Directive” means Directive 2011/92/EU of the European Parliament and of the Council of 13th December 2011 on the assessment of the effects of certain public and private projects on the environment;]

documents” includes photographs, drawings, maps and plans;

electronic transmission” means a communication transmitted—

(a)

by means of an electronic communications network; or

(b)

by other means, but while in electronic form;

[F2“environmental impact assessment” means the process referred to in rule 7A;]

[F3“environmental statement” means a statement—

(a)

which is required by virtue of these Rules—

(i)

to accompany an application for an order under section 6; or

(ii)

to be prepared in connection with the publication of a notice of a proposal to make an order by virtue of section 7; and

(b)

which includes the information referred to in rule 11(1);]

expiry date for objections” means the date, being a date not less than 42 days after the date on which the application in question is made, which the applicant specifies in the notice published pursuant to rule 14(1) as the final date for making objections and other representations;

footpath” has the same meaning as in the Highways Act 1980;

highway” has the same meaning as in the Highways Act 1980;

in writing” includes electronic transmission;

local authority” means a county council, a district council, (in Wales) a county borough council, a London borough council, the Common Council of the City of London, the Council of the Isles of Scilly, Transport for London and a Passenger Transport Executive;

local planning authority” means a local planning authority within the meaning of Part 1 of the Planning Act M7;

objection” has the meaning given by rule 21 and “objector” shall be construed accordingly;

occupier” includes—

(a)

a statutory undertaker (not being an owner) having a right to keep equipment on, in or over land; and

(b)

a person having the right to construct or maintain, at a specific position on an inland waterway, a mooring post, gangway, landing stage or other erection or installation for a vessel (not being anything which when not in use is normally carried on the vessel);

operative date” means the date falling 28 days after the expiry date for objections or such later date as the Secretary of State may specify;

“operator”—

(a)

in relation to a transport system, means any person carrying on an undertaking which includes the system, or any part of it, or the provision of transport services on the system; and

(b)

in relation to an inland waterway, means a navigation authority and, if different, the conservancy authority within the meaning of section 221(1) of the Water Resources Act 1991 M8;

owner”, in relation to land, has the same meaning as in the Acquisition of Land Act 1981 M9;

pipe-line owner” means—

(a)

any person in whom a pipe-line within the meaning of section 65 of the Pipe-lines Act 1962 M10 is vested; and

(b)

any person—

(i)

designated as the owner of a controlled pipeline, within the meaning of section 14(2) of the Petroleum Act 1998 M11, by an order made by the Secretary of State under section 27 of that Act; or

(ii)

who is entitled to operate any such controlled pipeline in relation to which no such order has been made;

the Planning Act” means the Town and Country Planning Act 1990 M12;

public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003 M13;

relevant coastal authority” means, in relation to works situated, or proposed to be carried out, in tidal waters which do not lie within the boundary of the area of a local authority in England or Wales—

(a)

every local planning authority whose area has a boundary which lies within 15 kilometres of any point on the works; or

(b)

where there is no such local planning authority, the local planning authority with the area boundary closest to the works;

river” means any river (including any part of a river which is tidal or which has been canalised), lake, stream, ditch, culvert, drain, sluice, weir or any other passage by which water drains, but does not include—

(a)

a canal or inland navigation which is not a canalised part of a river;

(b)

any part of the river Tweed (as defined in section 6(8) of the Environment Act 1995 M14);

(c)

any part of the river Esk or river Sark at a point where either of the banks of the river is in Scotland;

(d)

any part of any tributary stream of the river Esk or river Sark at a point where either bank of such tributary stream is in Scotland; or

(e)

a public sewer or a sewer or pipe used primarily for the drainage of a building or any premises appurtenant to a building, or of a street;

scoping opinion” has the meaning given in rule 8(1);

screening decision” has the meaning given in rule 7(4);

statutory undertaker” means—

(a)

any person authorised by an enactment to carry on a railway, tramway, trolley vehicle, guided transport, road transport, water transport, canal, inland navigation, harbour, pier, lighthouse, electricity supply, hydraulic power, sewerage or water undertaking;

(b)

a pipe-line owner;

(c)

a public communications provider;

(d)

a universal service provider in connection with the provision of a universal postal service;

(e)

the British Airports Authority ;

(f)

the Civil Aviation Authority;

(g)

a person who holds a licence under Chapter 1 of Part 1 of the Transport Act 2000 M15 (to the extent that the person is carrying out activities authorised by the licence); and

(h)

a gas transporter within the meaning of Part 1 of the Gas Act 1986 M16;

“street authority” and “street managers” have the meanings given in sections 49(1) and 49(4) respectively of the New Roads and Street Works Act 1991 M17;

tidal waters” means such part of—

(a)

the territorial sea adjacent to the United Kingdom; and

(b)

the internal waters of the United Kingdom in so far as they are tidal or constitute part of the sea,

as lie within the English area (within the meaning of article 1(2) of the Civil Jurisdiction (Offshore Activities) Order 1987 M18);

transport system” means a railway, tramway or trolley vehicle system or a system using a mode of guided transport prescribed by an order made under section 2;

the Trinity House” has the meaning given in section 223 of the Merchant Shipping Act 1995 M19;

universal service provider” has the same meaning as in [F4Part 3 of the Postal Services Act 2011] and references to the provision of a universal postal service shall be construed in accordance with [F5that Part];

works” means any works that may be authorised by an order made under section 1, 3 or 7 but in rules 7, 8, 11 and 16, and in paragraphs 4 to 6, 9, 14(f), 29 and 30 of Schedule 7 to these Rules, shall also include any matter that may be authorised by such an order; and

works affecting”, in relation to any land, means works proposed to be carried out in, on, over or adjacent to that land.

(2) Where these Rules require that notice be served, published or displayed in a prescribed form the notice shall be served, published or displayed (as the case may be), duly completed—

(a)in that form;

(b)in a version of that form adapted to meet the circumstances of the particular case; or

(c)in a form which has substantially the same effect as that form (whether the form is adapted or not),

and, except where these Rules require that the notice in question be published in a newspaper, duly signed by or on behalf of the person required to give the notice.

(3) A notice published pursuant to rule 14(2) and (3) or to paragraph 8 or 12 of Schedule 7 to these Rules in a local newspaper circulating in Wales shall be expressed in Welsh as well as in English.

[F6(4) For the purposes of these Rules information is sufficiently published on a website maintained by or on behalf of the Secretary of State if such information is accessible via that website from another website where it is published.]

[F7(5) For the purposes of these Rules, references to Annex III of the Directive are to be read as if—

(a)in point 2(c)(v), the reference to Member States were a reference to the Secretary of State;

(b)in point 2(c)(vi), the reference to Union legislation were a reference to retained EU law.]

Textual Amendments

Marginal Citations

M7Part 1 has been amended by: the Leasehold Reform Housing and Urban Development Act 1993 (c. 28), section 187(1) and Schedule 21, paragraph 29; the Local Government (Wales) Act 1994 (c. 19), sections 18 and 19; and the Environment Act 1995 (c. 25), sections 67 and 78 and Schedule 10, paragraph 32(2) and (3).

M91981 c. 67, as amended by the Planning and Compensation Act 1991 (c. 34) and the Planning and Compulsory Purchase Act 2004 (c. 5). There are other amendments not relevant to these Rules.

M121990 c. 8, as amended by the Planning and Compulsory Purchase Act 2004 (c. 5). Section 90 was amended by section 16(1) of the Transport and Works Act 1992 (c. 42). There have been other amendments which are not relevant to these Rules.

Pre-application draft order and explanatory memorandumE+W+S

5.—(1) The applicant shall send to the Secretary of State not later than 28 days before making an application—

(a)a draft of the proposed order; and

(b)a draft of the explanatory memorandum,

that the applicant intends to submit in pursuance of rule 10(2).

(2) Where an applicant has sent drafts to the Secretary of State in accordance with the provisions of paragraph (1), but subsequently amends any of those drafts, he shall not be required to send any amended drafts to the Secretary of State before making an application unless the applicant is of the opinion that the changes to the draft substantially alter the nature or effect of the proposed order.

Provision of environmental informationE+W+S

6.  Where an applicant at any time serves notice on any of those named in column (2) of the table in Schedule 5 to these Rules which is not a public authority within the meaning of regulation 2(2) of the Environmental Information Regulations 2004 M20 that for the purposes of the proposed application he wishes to be provided with environmental information—

(a)the recipient of the notice so served, if so requested in writing by the applicant and subject to the recipient being reimbursed the reasonable cost of so doing, shall provide to the applicant any information which the recipient has and which either the recipient or the applicant considers relevant to a screening decision (if that decision has not yet been made) or to the preparation of an environmental statement; and

(b)in the event of the recipient failing to provide such information before the end of the period of 28 days beginning with the date of such request the Secretary of State may (upon being requested to do so by the applicant) direct the recipient to provide the information and the recipient shall, upon receipt of such a direction, provide the information forthwith.

Marginal Citations

The requirement for environmental statement and screening decisionsE+W+S

7.—(1) Except where the Secretary of State has issued a direction pursuant to paragraph (3), an applicant shall when making an application submit an [F8applicant’s environmental statement] with that application in relation to any proposed works which are to be covered by that application, if those works constitute a project which is of a type mentioned in Annex I or, subject to paragraph (2), Annex II to the Directive.

(2) Where the proposed works constitute a project of a type mentioned in Annex II to the Directive an applicant is not required to submit an [F9applicant’s environmental statement] if the Secretary of State has, under paragraph (13), notified the applicant that an environmental impact assessment is not required in relation to those works.

[F10(3) Where the proposed works comprise or form part of a project serving national defence as its sole purpose, or comprise a project having the response to a civil emergency as its sole purpose, and the Secretary of State considers that the carrying out of an environmental impact assessment of the works would have an adverse effect on that purpose he may direct that an environmental impact assessment of the works is not required and that rule 16 does not apply.]

(4) Before making an application (other than an application relating to works constituting a project which is of a type mentioned in Annex I to the Directive), an applicant may make a request in writing to the Secretary of State for a decision as to whether or not an environmental impact assessment of the proposed works covered by the application is required (“a screening decision”).

[F11(5) An applicant making a request for a screening decision under paragraph (4) shall, taking into account where relevant the available results of other environmental assessments required under [F12retained EU law] (other than legislation [F13which implemented] the requirements of the Directive), provide the following information—

(a)a plan sufficient to identify the land affected by the works in question;

(b)a description of the proposed works, including in particular—

(i)a description of the physical characteristics of the works and, where relevant, of demolition works; and

(ii)a description of the location of the works, with particular regard to the environmental sensitivity of geographical areas likely to be affected;

(c)a description of aspects of the environment likely to be significantly affected by the works; and

(d)to the extent the information is available, a description of any likely significant effects of the works on the environment resulting from—

(i)the expected residues and emissions and the production of waste, where relevant; and

(ii)the use of natural resources, in particular soil, land, water and biodiversity.

(5A) An applicant making a request for a screening decision under paragraph (4) may also provide a description of any features of the proposed works or any measures envisaged to avoid or prevent what might otherwise have been significant adverse effects on the environment.]

(6) If the Secretary of State considers that the information provided by an applicant in or with a request made under paragraph (4) is insufficient to enable him to make a screening decision he shall, not later than 28 days after receiving the request, notify the applicant in writing of the additional information that he considers he requires in order to make that decision.

(7) On receiving notification under paragraph (6), the applicant shall provide the Secretary of State with such of the additional information specified in that notification as the applicant is reasonably able to supply and, where any of the additional information so specified is not provided, a written explanation as to why the applicant is unable to provide the information.

(8) The Secretary of State shall not give a screening decision in response to a request under paragraph (4) until he has given notice of the request to, and invited the views of, the following bodies—

(a)every local planning authority in whose area the works would be carried out, were the order for which the applicant proposes to apply to be made, or the relevant coastal authority (as the case may be);

[F14(b)where the proposals relate to a project within tidal waters and would require a licence under Part 4 of the Marine and Coastal Access Act 2009, the appropriate licensing authority within the meaning of section 113 of that Act;]

(c)the Environment Agency M21;

(d)the Countryside Agency M22 and English Nature M23 for a proposal affecting land in or adjacent to, or tidal waters in or adjacent to, England;

(e)the Countryside Council for Wales M24 for a proposal affecting land in or adjacent to, or tidal waters in or adjacent to, Wales; and

(f)any other body which is designated by statutory provision[F15, or by the Secretary of State on a case-by-case basis,] as having specific environmental responsibilities [F16or local or regional competencies] and which the Secretary of State considers is likely to have an interest in the application.

(9) The recipient of any notice served under paragraph (8) shall, not later than 28 days after receiving that notice, provide the Secretary of State with a written opinion as to whether or not, in the view of the recipient, the works in question should be the subject of an environmental impact assessment.

(10) Where a request for a screening decision relates to an order which would, if made, authorise works which F17... could constitute two or more projects which are not interdependent, the Secretary of State may, if he considers it expedient, treat each such project separately for the purposes of this rule and, in such a case, the references in this rule to works shall be construed as relating to each such project separately, and the references to the screening decision shall be construed as relating to such a decision in relation to each such project.

[F18(11) In making his screening decision, the Secretary of State shall take into account—

(a)any information provided to the Secretary of State by the applicant or other bodies in accordance with this rule;

(b)where relevant, the results of other environmental assessments carried out pursuant to [F19retained EU law] other than legislation [F20which implemented] the requirements of the Directive; and

(c)such of the selection criteria set out in Annex III to the Directive as [F21the Secretary of State determines] are relevant to the proposed works.

(12) If the Secretary of State considers that the works in question would be likely to have significant adverse effects on the environment if carried out, then unless the applicant has proposed features of the works or measures to avoid or prevent such significant adverse effects, his screening decision shall be that an environmental impact assessment of the works is required.]

(13) [F22Subject to paragraphs (13A) and (13B), the Secretary of State] shall notify the applicant in writing of his screening decision not later than 42 days after receipt of the request made pursuant to paragraph (4) or, where a notification has been given under paragraph (6), not later than 42 days after receiving the further information that the applicant is required to supply by virtue of paragraph (7).

[F23(13A) Where, in accordance with rule 26, the Secretary of State allows further time to make a screening decision, he must ensure that irrespective of the further time allowed the applicant is notified in writing of the Secretary of State’s screening decision not later than 90 days after receipt of the request made pursuant to paragraph (4) or, where a notification has been given under paragraph (6), not later than 90 days after receiving the further information that the applicant is required to supply by virtue of paragraph (7).

(13B) Where the Secretary of State considers that due to exceptional circumstances relating to the proposed works it is not practicable to notify the applicant of his screening decision within the period specified in paragraph (13A), the Secretary of State may extend that period by giving notice in writing to the applicant giving reasons justifying the extension and the date when the decision is expected.

(14) In the notification given under paragraph (13), the Secretary of State shall state the main reasons for the decision with reference to the relevant criteria [F24set out] in Annex III to the Directive, and if that decision is that an environmental impact assessment is not required the Secretary of State shall also state any features of the proposed works or measures proposed to be taken in order to avoid or prevent what might otherwise have been significant adverse effects on the environment.

(15) As soon as reasonably practicable after notifying the applicant of the screening decision, the Secretary of State shall arrange for a copy of the notification to be published on a website maintained by or on behalf of the Secretary of State for that purpose.]

Textual Amendments

Marginal Citations

M21See section 1(1) of the Environment Act 1995 (c. 25) which provides for the establishment of the Environment Agency.

[F25Environmental impact assessmentE+W+S

7A.(1) The environmental impact assessment is a process consisting of—

(a)the preparation of an environmental statement by the applicant;

(b)the carrying out of consultation, publication and notification as required by rules 13 and 14 and, where relevant, rule 16; and

(c)the steps that are required to be undertaken by the Secretary of State under section 13B.

(2) The environmental impact assessment must identify, describe and assess in an appropriate manner, in light of each individual case, the direct and indirect significant effects of the proposed works on the following factors—

(a)population and human health;

(b)biodiversity, with particular attention to species and habitats protected under [F26any law of any part of the United Kingdom which implemented] Directive 92/43/EEC and Directive 2009/147/EC;

(c)land, soil, water, air and climate;

(d)material assets, cultural heritage and the landscape; and

(e)the interaction between the factors referred to in sub-paragraphs (a) to (d).

(3) The significant effects to be identified, described and assessed under paragraph (2) shall include—

(a)the operational effects of the proposed works, where those works will have operational effects; and

(b)the expected significant effects arising from the vulnerability of the proposed works to major accidents or disasters that are relevant to those works.]

Scoping opinionE+W+S

8.—(1) Before submitting an application in relation to works for which an environmental impact assessment is or may be required, the applicant may make a request in writing to the Secretary of State to state his opinion as to the information to be provided in the environmental statement (a “scoping opinion”).

(2) A request under paragraph (1) shall be accompanied by—

(a)a plan sufficient to identify the land affected by the works in question;

(b)a brief description of the nature and purpose of the proposed works; and

(c)a brief description of the possible effects on the environment of the works, and may include such other information as the applicant wishes to provide.

(3) If the Secretary of State considers that the information provided by an applicant in or with a request made under paragraph (1) is insufficient to enable him to give a scoping opinion he shall, not later than 28 days after receiving the request, notify the applicant in writing of the additional information that he considers he requires in order to give that opinion.

(4) The Secretary of State shall not give a scoping opinion in response to a request under paragraph (1) until he has consulted F27... the following bodies—

(a)every local planning authority in whose area the works would be carried out, were the order for which the applicant proposes to apply to be made, or the relevant coastal authority (as the case may be);

[F28(b)where the proposals relate to a project within tidal waters and would require a licence under Part 4 of the Marine and Coastal Access Act 2009, the appropriate licensing authority within the meaning of section 113 of that Act;]

(c)the Environment Agency;

(d)the Countryside Agency and English Nature for a proposal affecting land in or adjacent to, or tidal waters in or adjacent to, England;

(e)the Countryside Council for Wales for a proposal affecting land in or adjacent to, or tidal waters in or adjacent to, Wales; and

[F29(f)any other body which is designated by statutory provision, or by the Secretary of State on a case-by-case basis, as having specific environmental responsibilities or local or regional competencies and which the Secretary of State considers is likely to have an interest in the application.]

(5) In forming a scoping opinion the Secretary of State shall take into account—

(a)the specific characteristics of the works in question;

(b)the specific characteristics of works of the type concerned; and

(c)the environmental features likely to be affected by the works.

(6) Subject to paragraph (7), the Secretary of State shall notify the applicant who made the request under paragraph (1) of his scoping opinion, in writing, not later than 42 days after receipt of that request or, where the Secretary of State has given a notification under paragraph (3), 42 days after receipt of the additional information mentioned in that notification.

(7) Where an applicant makes a request for a scoping opinion under paragraph (1) at the same time as he makes a request for a screening decision pursuant to rule 7(4) in relation to the same proposed works, or after he has made a request for such a screening decision but before the Secretary of State has notified him of the screening decision in relation to the works, the Secretary of State shall notify the applicant, in writing, of his scoping opinion not later than 42 days after the date on which he notifies the applicant of his screening decision.

(8) Where the Secretary of State has given a scoping opinion to an applicant he shall not be precluded from requiring that applicant to provide further information in connection with any [F30applicant’s environmental statement] that may be submitted by that applicant in connection with an application relating to the same, or substantially the same, works as were referred to in that scoping opinion.

[F31Coordination where application requires appropriate assessmentE+W+S

8A.(1) Where in relation to proposed works which required an environmental impact assessment there is a requirement to carry out a habitats regulation assessment, the Secretary of State must where appropriate ensure that the habitats regulation assessment and the environmental impact assessment are co-ordinated.

(2) In this rule, a “habitats regulation assessment” means an assessment under regulation 61 of the Conservation of Habitats and Species Regulations 2010.]

Form of applicationE+W+S

9.—(1) An application for an order to be made under section 1 or 3 shall be made in writing and shall be addressed to the Secretary of State.

(2) In the application the applicant shall give his name and the address to which all requests for further information, notices or other documents required to be served upon the applicant under the Act or these Rules are to be sent.

(3) The application shall be signed by—

(a)the applicant or, where the applicant is a body corporate, a director, the secretary or a duly authorised officer of that body; or

(b)the authorised agent of the applicant.

(4) In paragraph (3), “director”, in relation to a body corporate whose affairs are managed by its members, means a member of that body.

Documents accompanying applicationE+W+S

10.F32(1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(2) The applicant shall submit with the application [F33a copy] of each of the following documents—

(a)a draft of the proposed order;

(b)an explanatory memorandum that explains the purpose and effect of each article and schedule in the draft order;

(c)a concise statement of the aims of the proposals to which the application relates;

(d)a report summarising the consultations that have been undertaken, including confirmation that the applicant has consulted all those named in column (2) of the tables in Schedules 5 and 6 to these Rules where authority is sought for works or other matters described in column (1) of those tables, or if not, an explanation of why not;

(e)if the applicant is not an individual or a company regulated by the Companies Act 1985 M25, a declaration as to the status of the applicant;

(f)a list of all consents, permissions or licences required under other enactments for the purposes of the powers sought in the application, which at the date of the application are being sought or which have been obtained or refused, specifying for each relevant consent, permission or licence—

(i)from whom the consent, permission or licence is or was required;

(ii)the date of the application, or of the grant or refusal of the consent, permission or licence (as the case may be); and

(iii)the reference number (if any) of the application;

(g)any screening decision made or direction given by the Secretary of State under rule 7, any scoping opinion given by him under rule 8 and, in a case where the proposed works are to be subject to an environmental impact assessment, the [F34applicant’s environmental statement]; and

(h)any direction given under rule 18.

(3) When making an application for an order the applicant shall submit with the application—

(a)the applicant's proposals for funding the cost of implementing the order, and in particular, for funding the cost of acquiring land which is blighted within the meaning of section 149 of the Planning Act; and

(b)where the application is for an order containing proposals to carry out works—

(i)the plans and sections described in paragraphs (1) and (3) of rule 12; and

(ii)an estimate of the cost of carrying out the works provided for in the proposed order, which shall be in the form set out in Schedule 3 to these Rules or as nearly in that form as circumstances permit.

(4) Subject to paragraph (5), in the case of an application for an order authorising the compulsory acquisition of land, or the right to use land, or to carry out protective works to buildings, or the compulsory extinguishment of easements and other private rights over land (including private rights of navigation over water), the applicant shall submit with the application the plan and the book of reference respectively described in paragraphs (5) and (8) of rule 12.

(5) In the case of an application for an order providing for the extinguishment or diversion of rights of way over a footpath, bridleway, cycle track or byway, the applicant shall submit with the application a map of a scale not smaller than 1:2500 on which the path, way or track concerned, and, in the case of a diversion, the new path, way or track, is clearly delineated.

(6) Where the applicant seeks a direction from the Secretary of State under section 90(2A) of the Planning Act M26 that planning permission shall be deemed to be granted for the development provided for in the proposed order, he shall submit with the application—

(a)a request in writing specifying the development for which the direction for such permission is sought;

(b)a statement of any proposed planning conditions;

(c)a statement of any matters which are intended to be reserved for subsequent approval by the local planning authority;

(d)in respect of those matters not intended to be reserved for subsequent approval by the local planning authority, such further documents as have not otherwise been submitted with the application and which are necessary to support the request for the direction.

(7) Where the applicant seeks a direction from the Secretary of State under section 12(2A) of the Planning (Hazardous Substances) Act 1990 M27 that hazardous substances consent shall be deemed to be granted, he shall submit with the application—

F35(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)the information and documentation specified [F36regulation 5(1)(c), 5(1)(d), 5(2)(c) to (h) and 5(3)(c) to (g) of the Planning (Hazardous Substances) Regulations 2015] as the case may require.

(8) As soon as practicable after the date of an application, the applicant shall submit to the Secretary of State evidence by affidavit of compliance with the provisions of rules 13, 14(1) to (8) and 15, and shall exhibit to any such affidavit copies of notices placed in newspapers and the London Gazette (and Lloyd's List if applicable) in accordance with rule 14.

(9) Where the Secretary of State is of the opinion that any of the information submitted pursuant to this rule, other than the [F37applicant’s environmental statement], is not adequate for its purpose he may within 28 days of receipt of an application—

(a)direct the applicant to provide further information; and

(b)where he makes such a direction he may require the applicant to comply with any of the provisions of rules 13 and 14 in respect of the further information required.

Textual Amendments

Marginal Citations

M251985 c. 6, to which there are amendments not relevant to these Rules.

M26Subsection (2A) was inserted by section 16(1) of the Transport and Works Act 1992 (c. 42).

M271990 c. 10. Section 12 (2A) was inserted by section 18 of the Transport and Works Act 1992.

Environmental statements: provision of informationE+W+S

[F3811.(1) An environmental statement submitted in connection with an application shall include—

(a)a description of the project comprising information on the site, design, size and other relevant features of the proposed works;

(b)a description of the likely significant effects of the proposed works on the environment;

(c)a description of any features of the proposed works, or measures proposed to be taken in order to avoid, prevent or reduce and, if possible, offset likely significant adverse effects on the environment;

(d)a description of the reasonable alternatives studied by the applicant, which are relevant to the proposed works and their specific characteristics, and an indication of the main reason for the option chosen, taking into account the significant effects of the proposed works on the environment;

(e)a non-technical summary of the information provided under sub-paragraphs (a) to (d); and

(f)any additional information specified in Schedule 1 relevant to the specific characteristics of the proposed works or type of proposed works and to the environmental features likely to be significantly affected.

(2) The environmental statement referred to in paragraph (1) shall—

(a)where a scoping opinion has been issued in accordance with rule 8, be based on the most recent scoping opinion issued (so far as the proposed works remains materially the same as the proposed works which was subject to that decision);

(b)include the information required for reaching a reasoned conclusion on the significant effects of the works on the environment, taking into account current knowledge and methods of assessment; and

(c)be prepared, taking into account other relevant environmental assessments required under [F39retained EU law] or some other provision of domestic legislation, with a view to avoiding duplication of assessment.

(3) In order to ensure the completeness and quality of the environmental statement—

(a)the applicant must ensure that the environmental statement is prepared by competent experts; and

(b)the environmental statement must be accompanied by a statement from the applicant outlining the relevant expertise or qualifications of such experts.]

Plans, sections and book of referenceE+W+S

12.—(1) Subject to paragraphs (6) and (9), the plans referred to in rule 10(3)(b) are—

(a)a plan drawn to a suitable scale not smaller than 1:2500 showing clearly, in relation to existing features, the location, the alignment, if any, and (subject to paragraph (7)) limits of deviation of the works described, or for which provision is made, in the proposed order;

(b)where the plan described in sub-paragraph (a) comprises 3 or more separate sheets, a key plan drawn to a suitable scale showing clearly the relationship between such sheets; and

(c)a plan (which may be the plan described in sub-paragraph (b)) drawn to a suitable scale not smaller than 1:50,000 showing clearly the general location of any works and, if provision is made for such works in the proposed order, in particular—

(i)the general line of the route of any works that are of a linear nature and which exceed 3 kilometres in length; and

(ii)the general location, in relation to the coast or river bank, of works of a kind described in section 3(1)(b).

(2) All plans referred to in paragraph (1) shall contain a reference to the National Grid base or, where this is not practicable, to the latitude and longitude of the site of the proposed works.

(3) Subject to paragraphs (6) and (9), the sections referred to in rule 10(3)(b) are sections having a suitable vertical scale not smaller than 1:500 and showing, by reference to Ordnance Survey or Chart datum—

(a)on the same horizontal scale as the plan described at paragraph (1)(a), the levels of the proposed works, including in particular where relevant—

(i)ground levels;

(ii)the height of every intended bridge, viaduct, aqueduct, embankment and elevated guideway;

(iii)the depth of every intended cutting and tunnel;

(iv)the levels of the bed of any tidal waters or inland waterway in which it is proposed any works should be situated; and

(v)the height of every structure or device (including a cable) intended to be erected above, on or below the surface of, or on or beneath the bed of, tidal waters or an inland waterway;

(b)on a horizontal scale not smaller than 1:500, the span and vertical clearance of every intended bridge, viaduct, aqueduct, gantry and other structure or device (including a cable) above ground level, for which provision is made in the proposed order;

(c)in cross-section, on a horizontal scale not smaller than 1:500, the depths and water levels of every intended inland waterway, for which provision is made in the proposed order;

(d)on a horizontal scale not smaller than 1:500, a cross section of every intended tunnel, for which provision is made in the proposed order; and

(e)on a horizontal scale not smaller than 1:500, any altered gradient of a carriageway or a way forming part of a guided transport system on either side of every level crossing, bridge, tunnel or underpass which would carry the carriageway or way or through which it would pass, for which provision is made in the proposed order.

(4) In paragraph (3) “cable” does not include catenary and related equipment for transport systems.

(5) Subject to paragraph (6), the plan referred to in rule 10(4) is a plan drawn to a suitable scale not smaller than 1:2500 (and which may be the plan described in paragraph (1)(a)) showing clearly any land—

(a)over which it is proposed to acquire powers of compulsory acquisition, or any right to use the land or to carry out protective works to buildings;

(b)in relation to which it is proposed that easements and other private rights (including private rights of navigation over water) shall be extinguished;

(c)of which the applicant is the sole owner and occupier, and which it is proposed shall be used for the purposes of the order for which application is being made; or

(d)in which there subsists a Crown interest, whether or not there are other interests in such land, and which it is proposed shall be used for the purposes of the proposed order.

(6) An applicant may in writing request the Secretary of State to direct that the scale for the plans and sections referred to in paragraph (1), (3) or (5) be varied and the Secretary of State may so direct where he is satisfied that such a request is reasonable and appropriate.

(7) Where the proposed order includes a power to make lateral deviation from the line of any proposed works (other than within the boundaries of a street) the limits of deviation shall be clearly shown upon the plan described at paragraph (1)(a).

(8) The book of reference referred to in rule 10(4) is a book which refers to the plan described in paragraph (5) and which (subject to the provisions of paragraph (10))—

(a)contains the names of all owners, lessees, tenants (whatever the tenancy period) or occupiers of any land which it is proposed shall be subject to—

(i)powers of compulsory acquisition;

(ii)rights to use land, including the right to attach brackets or other equipment to buildings; or

(iii)rights to carry out protective works to buildings;

(b)contains the names of all those entitled to enjoy easements or other private rights over land (including private rights of navigation over water) which it is proposed shall be extinguished;

(c)contains the names of any others to whom the applicant would, if proceeding under section 5(1) of the Compulsory Purchase Act 1965 M28, be required to give a notice to treat;

(d)where there is a Crown interest in the land which it is proposed shall be used for the purposes of the order for which application is being made, specifies the owner of that interest;

(e)specifies land—

(i)the acquisition of which is subject to special parliamentary procedure pursuant to section 12;

(ii)which is Green Belt within the meaning of section 2 of the Green Belt (London and Home Counties) Act 1938 M29;

(iii)for which other land is to be given in exchange;

(iv)that is to be given in exchange for other land;

(v)which is within a European site or a European marine site, as those expressions are defined in regulations 2(1) and 10(1) of the Conservation (Natural Habitats &c.) Regulations 1994 M30;

(vi)which is within an area of outstanding natural beauty, designated as such by an order made by the Countryside Agency, as respects England, or the Countryside Council for Wales, as respects Wales, under section 82 of the Countryside and Rights of Way Act 2000 M31;

(vii)which is within a National Park within the meaning of the National Parks and Access to Countryside Act 1949 M32;

(viii)which is property appearing on the World Heritage List kept under article 11(2) of the 1972 UNESCO Convention for the Protection of World Cultural and Natural Heritage M33;

(ix)which is within the Broads M34;

(x)which is a scheduled monument within the meaning of the Ancient Monuments and Archaeological Areas Act 1979 M35;

(xi)which has been notified under section 28(1) (sites of special scientific interest) of the Wildlife and Countryside Act 1981 M36; and

(f)specifies, for each plot of land identified in it and within which it is intended that all or part of the proposed works shall be carried out, the area in square metres of that plot.

(9) Where provision is made in the proposed order for any works which are—

(a)proposed to be formed or constructed for the accommodation of an owner or occupier of land adjacent to a proposed transport system or inland waterway; or

(b)ancillary to a proposed transport system, inland waterway or works of a kind described in section 3(1)(b),

the applicant shall not be obliged to show them as required by paragraphs (1) and (3) but shall give such indication of them as is reasonably practicable.

(10) The requirements of paragraph (8)(a) to (d) shall only extend to including those names which have been ascertained by the applicant, after making diligent inquiry, at the beginning of a period of 28 days ending with the date of the application; but where the applicant has reason to believe that relevant names have, or might have, been omitted he shall indicate this clearly in the book of reference.

(11) Subject to paragraph (10), where the applicant has made diligent inquiry in order to attempt to obtain the information mentioned in paragraph (8), the application shall not be invalidated by reason only of an error in, or the omission of information from, the book of reference.

Deposit of copy application etc. with othersE+W+S

13.—(1) The applicant shall serve a copy of the application and of every document that these Rules require shall accompany it, together with a statement containing the information set out in paragraph (8)(j), upon—

(a)every local authority in whose area a transport system, inland waterway or other works to which the application relates is or are (or is or are to be) situated or, where the application relates only to a part of such a system, waterway or works, upon every local authority in whose area such a part is (or is to be) situated; and

(b)every relevant coastal authority,

and shall deposit copies of the application, those documents and that statement in the library of the House of Commons and, unless the Secretary of State directs otherwise, in the library of the House of Lords.

(2) Where the application relates to work of a kind described in section 3(1)(b), the applicant shall serve a copy of the application and of every document (other than a copy of a document) which is required by these Rules to accompany it, together with a statement containing the information set out in paragraph (8)(j), upon the Trinity House.

(3) In the case of an application for an order authorising the works or other matters specified in any of the categories in column (1) of the table in Schedule 5 to these Rules, the applicant shall serve upon those named against such category in column (2) of that table a copy of the application and copies of the relevant documents.

(4) The Secretary of State may require the applicant to serve a copy of the application and copies of the relevant documents on any other body which is designated by statutory provision[F40, or by the Secretary of State on a case-by-case basis,] as having specific environmental responsibilities [F41or local or regional competencies] and which the Secretary of State considers is likely to have an interest in the application.

(5) The applicant shall not be obliged by virtue of this rule to serve upon anyone more than one copy of the same document.

(6) Where anyone has confirmed to the applicant in writing that he does not wish to be served with a copy of, or a copy of any part of, a document that the applicant is required to serve upon him by virtue of this rule, the applicant shall not be required to serve upon him that document or the relevant part of it.

(7) All documents required to be served upon anyone by virtue of this rule shall be so served forthwith after the making of the application.

(8) In this rule “relevant documents” means—

(a)a draft of the proposed order;

(b)the explanatory memorandum required by rule 10(2)(b);

(c)the concise statement of aims required by rule 10(2)(c);

(d)the report summarising the consultation undertaken required by rule 10(2)(d);

(e)a copy of any direction given under rule 18;

(f)in the case of categories 1 to 6, 8, 10 and 14 to 21 in the table in Schedule 5 to these Rules, any screening decision, scoping opinion and [F42applicant’s environmental statement] relating to the application that has been made;

(g)in the case of categories 1 to 4, 7 and 9 to 11 in the table in Schedule 5 to these Rules, the estimate referred to in rule 10(3)(b)(ii);

(h)in the case of category 10 in the table in Schedule 5 to these Rules, the map referred to in rule 10(5);

(i)such of the plans and sections described in rule 10 as these Rules require shall accompany the application and as are relevant to the category in the table in Schedule 5 to these Rules under which the copy application is served; and

(j)a statement specifying the capacity (or, if there is more than one, the capacities) in which the recipient is served, the expiry date for objections and the address to which an objection or other representation is to be sent.

Publicity for applicationE+W+S

14.—(1) The applicant shall, after the application has been made, publish forthwith in the London Gazette (and, if the application relates to works of a kind referred to in section 3(1)(b), and the Secretary of State so directs, in Lloyd's List) a notice of the application, which shall—

(a)state the name of the applicant and the address given pursuant to rule 9(2);

(b)state to whom the application has been made;

(c)state whether the application is subject to an environmental impact assessment;

(d)summarise the main proposals and specify the location of the proposed works (if any); and

(e)state the address to which objections or other representations are to be sent and the expiry date for objections.

(2) The applicant shall publish, in the newspapers described in paragraph (3), a notice in the form of Form 1 in Schedule 2 to these Rules, such notice to be published on 2 separate occasions, the first publication to be not more than 14 days before, and not later than, the date of the application and the second to be not more than 7 days after the date of the application.

(3) The newspapers referred to in paragraph (2) are—

(a)in the case of an application relating to works situated, or proposed to be carried out, in tidal waters and not lying within the area of a local authority, a local newspaper circulating in the area of each relevant coastal authority; and

(b)in every other case, a local newspaper circulating in the area (or each of the areas) in which the proposals contained in the application are intended to have effect.

(4) In the case of an application for an order authorising the works or other matters specified in any of the categories in column (1) of the table in Schedule 6 to these Rules, the applicant shall, forthwith after the application has been made, serve upon those named against each category in column (2) of that table a notice containing the information specified in paragraph (5), and every notice served under the provisions of this paragraph shall state the capacity (or, if there is more than one, the capacities) in which the recipient of the notice is served.

[F43(4A) In the case of an application in respect of which the applicant was required to submit an applicant’s environmental statement in accordance with rule 7(1), the applicant must arrange for a notice containing the information specified in paragraph (5), together with a copy of the applicant’s environmental statement and any further environmental information submitted under rule 17, to be published on a website maintained by or on behalf of the Secretary of State for that purpose.]

(5) The information referred to in paragraph (4) is—

(a)the name of the applicant;

(b)to whom the application has been made, and the address to which objections or other representations are to be sent;

(c)a statement as to whether the application is subject to an environmental impact assessment;

(d)a concise summary of the matters for which provision is to be made in the order for which application has been made (including, in a case to which paragraph (6) or (7) of rule 10 applies, a statement that deemed planning permission or deemed hazardous substances consent, as the case may be, has been sought);

[F44(e)the names or details of—

(i)all places, which shall be places within the area to which the proposals in the proposed order relate (or as close as reasonably practicable to that area) where, at all reasonable hours until the expiry date for objections—

(aa)the application; and

(bb)the documents which are required by these Rules to accompany it,

may be inspected or be viewed in an electronic form free of charge; or

(ii)a website where a copy of the application and of the documents required by these Rules to accompany it are displayed; and]

(f)a statement that, until that date, any objection to the making of the order, or any other representation in relation to it, may be made in writing, stating the grounds for the objection or other representation, to the Secretary of State at the address specified pursuant to sub-paragraph (b),

but in the case of a notice required to be published in a local newspaper it shall not be necessary for the notice to include any information pursuant to sub-paragraph (d) or (e) concerning a proposal contained in the application which is not relevant to the area in which such newspaper circulates.

(6) In the case of an application for an order authorising works the applicant shall, forthwith after the application has been made, display a notice in the form of Form 2 in Schedule 2 to these Rules upon, or as close as reasonably practicable to, the proposed sites of those works at a place accessible to the public and, where the order for which application has been made would include linear works exceeding 5 kilometres in length, such a notice shall be displayed at intervals of not more than 5 kilometres along the whole of the proposed route of the works except where this is impracticable due to the land in question being covered by water.

(7) Where an order for which application has been made would authorise—

(a)the extinguishment or diversion (whether such diversion would be permanent or temporary) of a public right of way; or

(b)the stopping-up or diversion of a street, or a restriction on the use of the street by any person or traffic, whether such stopping-up, diversion or restriction would be permanent or, in the case of a street specifically named in the proposed order, temporary,

the applicant shall, forthwith after the application has been made, display a notice in the form of Form 3 in Schedule 2 to these Rules, upon the right of way or street at, or as close as is reasonably practicable to, each point of extinguishment, diversion, stopping-up or restriction.

(8) In the case of an application for an order providing for the discontinuance of all railway passenger or tramway services from any station or on any line to which the provisions of sections of 37 to 39 (inclusive) of, or Schedule 5 to, the Railways Act 1993 M37 apply, the applicant shall, forthwith after the application has been made, display a notice in the form of Form 4 in Schedule 2 to these Rules at every station to be closed and at every station directly served by an advertised service running from any station to be closed.

(9) The applicant shall use his best endeavours to ensure that every notice displayed under the provisions of paragraphs (6) to (8) shall continue to be displayed in a legible form until the expiry date for objections.

(10) The applicant shall supply a copy of the application, or of any document that these Rules require shall accompany an application, to any person who requests such a copy, subject to the payment by that person of a reasonable charge for the provision of that copy, and the applicant shall ensure that information as to how such copies may be obtained is displayed at every place at which copies of the application and those documents are made available for inspection.

Notices to owners, occupiers etc.E+W+S

15.—(1) The applicant shall, forthwith after the application has been made, serve a notice in the form of Form 5 in Schedule 2 to these Rules (in this rule referred to as “Form 5”) upon all those, other than the applicant and the owner of any Crown interest, named in the book of reference described in rule 12(8).

(2) In every case where, pursuant to rule 12(10), the applicant has indicated in the book of reference that relevant names have or might have been omitted, he shall, forthwith after the application has been made, serve a notice in the form of Form 5 in the manner provided by section 66(4)(a) and (b).

Developments likely to have significant effects on the environment of another part of the United Kingdom or certain other statesE+W+S

16.—(1) This rule applies where an application for an order under section 1 or 3 has been made and—

(a)it appears to the Secretary of State that the application relates to proposed works which would be likely to have significant effects on the environment in Wales, Scotland, Northern Ireland, the Isle of Man or the Channel Islands;

(b)it appears to the Secretary of State that the application relates to proposed works which would be likely to have significant effects on the environment of [F45a] Member State; or

(c)[F46a] Member State whose environment is likely to be significantly affected by the proposed works to which the application relates requests information relating to the application.

(2) In a case falling within paragraph (1)(a), the applicant shall publish, if so directed by the Secretary of State, the information specified in paragraphs (1)(a) to (e) and (5)(d) and (e) of rule 14 in such newspapers circulating in the place in question as the Secretary of State may specify.

(3) In a case falling within paragraph (1)(b) or (c), the Secretary of State shall—

(a)send the information mentioned in paragraph (5) to the Member State in question as soon as reasonably practicable and in any event no later than—

(i)the date of the publication of a notice in the London Gazette, pursuant to rule 14(1); or

(ii)in a case falling within paragraph (1)(c), no later than 7 days after receiving a request from the Member State in question; and

(b)give the Member State in question a reasonable time in which to indicate whether it wishes to participate in the procedure for consideration of the application.

(4) The Secretary of State shall direct the applicant to take such steps as the Secretary of State considers necessary to ensure that the public is informed that the project is likely to have significant effects on the environment of [F47a] Member State and that the provisions of this rule apply.

(5) The information referred to in paragraph (3)(a) is—

(a)a description of the proposed works, together with any information the Secretary of State has in connection with the application as to the possible significant effects of the works on the environment of the Member State in question; and

(b)information on the nature of the decision which may be taken.

(6) Where a Member State has indicated, in accordance with paragraph (3)(b), that it wishes to participate in the procedure for the consideration of the application the Secretary of State shall, as soon as reasonably possible, send to the State in question (in so far as these documents and information have not already been supplied to that State)—

(a)a copy of the application;

(b)a copy of the [F48applicant’s environmental statement]; and

(c)any relevant information regarding the procedure for the consideration of the application and for undertaking an environmental impact assessment of the proposed works in question.

(7) In a case falling within paragraph (1)(b) or (c), the Secretary of State shall also—

(a)arrange for the documents and other information referred to in paragraphs (5) and (6) to be made available, within a reasonable time, to [F49any authority which the Member State has indicated it wishes to be consulted by reason of the authority’s specific environmental responsibilities or local or regional competencies] and to the members of the public in the territory of the Member State which is likely to be significantly affected;

(b)ensure that those authorities and members of the public concerned are given an opportunity, before any order is made authorising the works in question, to forward to the Secretary of State, within a reasonable time, their opinion on the information supplied;

(c)enter into consultations with the Member State in question, regarding any potential significant effects of the proposed works on the environment of that Member State, the measures envisaged to reduce or eliminate such effects and such other matters relating to the proposed works as may be relevant to that Member State; and

(d)provide, in agreement with the F50... Member State in question, a reasonable period of time for such consultations to take place before taking any decision as to whether or not to make the order in question.

[F51(8) Where a Member State has been consulted in accordance with paragraph (7)(c), the Secretary of State shall inform that Member State of his decision as to whether or not the order in question should be made and shall send to that Member State a copy of the notice referred to in section 14.]

Textual Amendments

Further information and noticesE+W+S

17.—(1) Where, in the opinion of the Secretary of State, the [F52applicant’s environmental statement] should contain any additional information in order to constitute an environmental statement for the purposes of the application in question, the Secretary of State shall direct the applicant to supply that information.

(2) Without prejudice to paragraph (1), the Secretary of State, when considering an application in relation to which an [F53applicant’s environmental statement] has been provided, may direct the applicant to provide such further information as may be specified concerning any matter which is required to be, or may be, dealt with in the environmental statement.

(3) Where any such direction as is mentioned in paragraph (1) or (2) has been given by the Secretary of State, the applicant shall comply with the requirements of that direction within such period as may be specified in that direction by the Secretary of State, or if no such period is specified as soon as is reasonably practicable to do so.

(4) Where information is provided by the applicant pursuant to paragraphs (1) to (3), the applicant shall—

(a)publish, in the newspapers prescribed by rule 14(3) circulating in the areas to which the information is relevant, a notice in the form of Form 6 in Schedule 2 to these Rules;

(b)serve a copy of the information on each person on whom, in accordance with these Rules, a copy of the [F54applicant’s environmental statement] was served;

(c)provide a copy or an additional copy of the information, or any part of the information, to any person who requests it, subject to the payment by that person of a reasonable charge for the provision of any such copy or additional copy; and

(d)provide the Secretary of State with 4 copies of the information.

(5) The Secretary of State may direct an applicant to produce such evidence to verify any information in the [F55applicant’s environmental statement] or in any further information provided as a consequence of a direction given under paragraph (1) or (2) as the Secretary of State may require.

(6) Where, after making an application, an applicant submits to the Secretary of State further environmental information in relation to that application otherwise than in pursuance of a direction under paragraph (1) or (2), the Secretary of State may require the applicant to comply with the steps set out in paragraph (4) in respect of that further information.

Waiver of requirements in relation to applicationsE+W+S

18.—(1) An applicant may, at any time before or after making an application, submit a request in writing to the Secretary of State for a direction that any provision contained in rules 5, 9, 10 (other than paragraph (2)(g) of rule 10) and 12 to 15 shall not apply (or shall apply in part only) to an application he has made or proposes to make.

(2) A request made under paragraph (1) shall give reasons for the request.

(3) Where a request is made under paragraph (1) the Secretary of State may, where he is satisfied that it is impossible, impracticable or unnecessary for the applicant to comply with any provision contained in the rules mentioned in paragraph (1)—

(a)direct that the provision in question shall not apply, or shall apply in part only, to the application in question; and

(b)whether or not a direction has been given pursuant to sub-paragraph (a), direct that the applicant shall comply with the provision in question, or any part of it, at such later date as may be specified in the direction.

Fees for applicationsE+W+S

19.—(1) Upon making an application the applicant shall pay a fee to the Secretary of State calculated in accordance with Schedule 4 to these Rules.

(2) In the circumstances specified in paragraph (3), an applicant may make a request in writing to the Secretary of State for the repayment of any part of the fee paid pursuant to paragraph (1).

(3) The circumstances are—

(a)where, on a motion moved by a Minister of the Crown pursuant to section 9(4), either House of Parliament declines to pass a resolution approving proposals contained in the proposed order in question; or

(b)where the application is withdrawn before the expiration of the time limit specified in paragraph (4) (whether or not a motion pursuant to section 9(4) is to be, or has been, moved in relation to the application in question).

(4) The time limit is—

(a)in the case of an application in relation to which, pursuant to rules made under section 9 of the Tribunals and Inquiries Act 1992 M38, the Secretary of State has given notice of his intention to hold a public inquiry, the expiration of the period of 14 days commencing with the date on which any such inquiry is closed;

(b)in the case of an application in relation to which the Secretary of State has given to any person the opportunity of appearing before and being heard by a person appointed by the Secretary of State pursuant to section 11(2), the expiration of the period of 14 days commencing with the date on which the person appointed ceases to hear any representations made to him as a consequence of that opportunity being afforded;

(c)in the case of an application in relation to which the provisions of rule 24 apply, the end of the day on which is completed the latest of such of the time periods specified in or pursuant to paragraphs (2) to (10) of that rule as shall apply to that application; or

(d)in any other case, the end of the operative date.

(5) Where a request is made pursuant to paragraph (2), the Secretary of State shall repay to the applicant such portion (if any) of the fee paid as the Secretary of State shall consider appropriate.

Marginal Citations

Orders made by the Secretary of State under section 7E+W+S

20.  Schedule 7 to these Rules (which imposes duties and powers on the Secretary of State where he proposes to make an order under section 7) shall have effect.

Objections and other representations: generalE+W+S

21.—(1) Subject to paragraph (2), an objection or other representation made in relation to an application shall only be an objection or other representation for the purposes of these Rules if it—

(a)is received by the Secretary of State on or before the expiry date for objections;

(b)is made in writing;

(c)states the grounds of the objection or other representation;

(d)indicates who is making the objection or other representation;

(e)provides an address to which any correspondence relating to that objection or other representation may be sent.

(2) Where an objection or other representation relates to information supplied by the applicant pursuant to rule 17 after the application has been made, that objection or other representation shall be an objection or other representation for the purposes of these Rules even where it is made after the expiry of the date for objections, if it is made not later than 42 days after the date on which the information is supplied to the Secretary of State or the last date on which a notice relating to the information is published in a newspaper pursuant to rule 17(4), whichever date is the later.

(3) In this rule and in rules 22 to 25, a reference to an objection or other representation includes a reference to any document submitted with an objection or other representation.

Notice of objections and other representationsE+W+S

22.—(1) The Secretary of State shall, as soon as reasonably practicable after he has received an objection or other representation, provide the applicant with a copy of that objection or other representation.

(2) As soon as reasonably practicable after the expiry date for objections, the Secretary of State shall provide the applicant with a list of the objections and other representations that the Secretary of State has received stating, in each case—

(a)the name and address of the objector or maker of the other representation; and

(b)the reference number given to the objection or other representation.

(3) The Secretary of State may, upon request, provide any person with a copy of any objections or other representations made by others.

Application of written representations procedureE+W+S

23.—(1) Subject to paragraphs (2) to (4), rule 24 shall apply to an objection unless, on or before the operative date, the Secretary of State has—

(a)given notice in accordance with rules made under section 9 of the Tribunal and Inquiries Act 1992 that he will cause a public local inquiry to be held;

(b)given notice to the applicant and every objector who made the objection in question that the objection will be dealt with in accordance with section 11(2);

(c)informed the objector in question and the applicant that it appears to him that the objection is of a type mentioned in paragraph (a) or (b) of section 10(3); or

(d)published a notice in the London Gazette in accordance with section 9(2) identifying the application and the proposals in it which in his opinion are of national significance.

(2) Rule 24 shall not apply in relation to an objection if, not later than the operative date, a statutory objector informs the Secretary of State in writing that he wishes the objection to be referred to a public local inquiry or dealt with in accordance with section 11(2).

(3) Rule 24 shall cease to apply to an objection if after the operative date either the Secretary of State or a statutory objector, as the case may be, takes in relation to that objection one of the steps mentioned in paragraph (1) or (2).

(4) Notwithstanding that one of the steps mentioned in paragraph (1) or (2) has been taken, the Secretary of State may, with the consent of the applicant and every statutory objector, and after consulting such other persons as he thinks fit, direct that rule 24 shall thereafter apply to all objections that have not been withdrawn; provided that, where any of the steps required to be taken under that rule have been taken before the date of that direction, they need not be taken again.

(5) In this rule “statutory objector” means a person within section 11(4) who has made an objection which has not been withdrawn.

Procedure by written representationsE+W+S

24.—(1) Where none of the steps mentioned in paragraph (1) or (2) of rule 23 has been taken by the operative date, the provisions of this rule shall apply and the Secretary of State shall notify the applicant and all those who have made, and not withdrawn, an objection or other representation pursuant to rule 21 that this is the case.

(2) The applicant shall, not later than 28 days of being notified pursuant to paragraph (1), send to the Secretary of State representations upon each objection.

(3) The Secretary of State shall, within 7 days of receiving representations from the applicant pursuant to paragraph (2), send to each objector a copy of any of those representations that relate to his objection and shall inform him of his rights under paragraph (4).

(4) An objector may, within 21 days of being sent a copy of the applicant's representations pursuant to paragraph (3), reply in writing to the Secretary of State.

(5) Where the Secretary of State receives no reply from an objector within the period specified in paragraph (4) he may proceed to make a determination under section 13, unless he considers that he does not have sufficient information to enable him to make a determination.

(6) Where the Secretary of State receives a reply from an objector pursuant to paragraph (4) he shall, within 7 days of receipt, send a copy of such reply to the applicant.

(7) If the applicant wishes to send any further representations to the Secretary of State he shall do so within 14 days of being sent a copy of any reply pursuant to paragraph (6).

(8) Subject to paragraph (9), the Secretary of State may, upon expiry of the period specified in paragraph (7), proceed to make a determination under section 13, unless he considers that—

(a)he does not have sufficient information to enable him to make such a determination; or

(b)any further representations received from the applicant pursuant to paragraph (7) raise a new matter which, in the opinion of the Secretary of State, may affect his determination and upon which an objector should be given the opportunity to comment.

(9) Where, pursuant to paragraph (5) or (8)(a), the Secretary of State considers that he requires further information from the applicant or an objector to enable him to make a determination under section 13 or where, pursuant to paragraph (8)(b), he decides to give an objector a further opportunity to comment, he shall write to the applicant and objector accordingly and he shall specify the period during which any further information or comments, as the case may be, shall be submitted to him.

(10) Where paragraph (9) applies, the Secretary of State shall consider, upon receipt of any further information or comments within the specified period, whether or not a further opportunity to comment should be given to the applicant or to an objector and, if so, he shall specify a period for making any further comments.

(11) The Secretary of State may, upon request, provide any person with a copy of any written representations or other material that have been sent to him pursuant to this rule.

(12) In making a determination under section 13, the Secretary of State may disregard any written representations or other material that have not been sent to him within any time limit specified under or pursuant to this rule.

Submission of written objections and other representations to inquiry or hearingE+W+S

25.  Where the Secretary of State causes a public local inquiry to be held or gives an objector an opportunity of being heard before a person appointed by the Secretary of State, the Secretary of State shall submit every objection and other representation made pursuant to rule 21 either to the inquiry inspector or the person so appointed, as the case may be, as soon as it is reasonably practicable to do so.

Power to set later time limitsE+W+S

26.  The Secretary of State may in a particular case allow further time for the taking of such steps (including a step which he is required or enabled to take himself) which may or must be taken pursuant to these Rules and any reference to a date by which or a period within which any step is required to be taken shall be construed accordingly.

Service of notices or documentsE+W+S

27.[F56(1) Notices or documents required or authorised to be served or sent under any of the provisions of these Rules may be effected by—

(a)sending by post;

(b)subject to paragraphs (2) to (5), sending by electronic transmission; or

(c)subject to compliance with the requirements in paragraph (6), publishing them on a website maintained by or on behalf of the applicant.]

(2) [F57Subject to paragraph (2A) where a notice] or other document required to be served or sent for the purposes of these Rules is served or sent by electronic transmission the requirement shall be taken to be fulfilled where the recipient of the notice, or other document to be transmitted, has given his consent in writing to the use of electronic transmission.

[F58(2A) No consent is required for the purposes of paragraph (2) in the case of a notice or other document required to be served on or sent to the Secretary of State or a body or person mentioned in rules 13(1) to (4), 17(4) or 25.]

(3) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that he requires a paper copy of all or any part of that notice or other document, the sender shall provide such a copy as soon as is reasonably practicable.

(4) A person may revoke his consent to the use of electronic transmission in accordance with paragraph (5).

(5) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of these Rules he shall—

(a)give notice in writing revoking any consent given by him for that purpose; and

(b)such revocation shall be final and shall take effect on a date specified by the person in the notice but that date shall not be less than 7 days after the date on which the notice is given.

[F59(6) The requirements referred to in paragraph (1)(c) are that the person upon whom the notice or other document is being served or sent is notified in writing of—

(a)the publication of the relevant document on a website;

(b)the address of the website;

(c)the place on the website where the document may be accessed and how it may be accessed;

(d)details of where and when copies of documents may be inspected or viewed in an electronic form;

(e)details of where and when copies of documents may be obtained; and

(f)any charge that will be levied for copies made of any document available for inspection or viewing.

(7) In this rule, “served or sent” includes “submitted” or “provided”.]

Applications relating solely to WalesE+W+S

28.—(1) This rule applies where an application for an order to be made under section 1 or 3, or a proposal to make an order under section 7(1)(b) or (c), relates solely to any matter specified in paragraph (2).

(2) The specified matters are—

(a)the construction or operation of a transport system in Wales;

(b)the construction or operation of an inland waterway in Wales;

(c)the carrying out of works which interfere with rights of navigation within Wales or in the territorial sea adjacent to Wales; and

(d)any works or other matters which would be carried out, or occur wholly, in Wales, or which would affect only Wales, and which are ancillary to any of the matters specified in sub-paragraphs (a) to (c).

(3) Where this rule applies—

(a)subject to sub-paragraph (b), references in these Rules to the Secretary of State, other than the reference in rule 7(3), shall be construed as references to the National Assembly for Wales;

(b)the reference to the Secretary of State in rule 23, in so far as it relates to paragraph (1) (d) of that rule, shall be construed as a reference to the Secretary of State and the National Assembly for Wales but otherwise shall be construed as a reference only to the Assembly;

(c)the references to Wales in rule 16(1)(a) and in paragraph 29 of Schedule 7 to these Rules, shall be construed as references to England;

(d)the following provisions in column (2) in Schedule 5 to these Rules shall not apply—

  • paragraph 1(a);

  • paragraph 5(b);

  • paragraph 8(b);

  • paragraph 14(b) except in so far as it relates to the Royal Commission on Ancient and Historical Monuments in Wales;

  • paragraph 15(b);

  • paragraph 16(b);

  • paragraph 22(b); and

(e)paragraph 6(i)(b), in column (2) of Schedule 6 to these Rules, shall not apply.

[F60ReviewE+W+S

29.(1) The Secretary of State must from time to time—

(a)carry out a review of the regulatory provision contained in these Rules; and

(b)publish a report setting out the conclusions of the review.

(2) The first report must be published before 5th December 2022.

(3) Subsequent reports must be published at intervals not exceeding 5 years.

(4) Section 30(3) of the Small Business, Enterprise and Employment Act 2015 requires that a review carried out under this rule must, so far as is reasonable, have regard to how the obligations under the Directive are implemented in other Member States.

(5) Section 30(4) of the Small Business, Enterprise and Employment Act 2015 requires that a report published under this rule must in particular—

(a)set out the objectives intended to be achieved by the regulatory provisions referred to in paragraph (1)(a);

(b)assess the extent to which those objectives are achieved;

(c)assess whether those objectives remain appropriate; and

(d)if those objectives remain appropriate, assess the extent to which they could be achieved in another way which involved a less onerous regulatory provision.

(6) In this rule “regulatory provision” has the same meaning as in sections 28 to 32 of the Small Business, Enterprise and Employment Act 2015 (see section 32 of that Act).]

Signed by authority of the Secretary of State

S. J. Ladyman

Minister of State

Department for Transport

Rules 4(1) and 11(1)

[F61SCHEDULE 1E+W+SInformation to be included in environmental statements

1.  A description of the proposed project, including in particular—E+W+S

(a)a description of the location of the project;

(b)a description of the physical characteristics of all the works, including, where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases;

(c)a description of the main characteristics of the operational phase of the project (in particular any production process), for example, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used or affected;

(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) resulting from the operation of the proposed project.

2.  A description of the reasonable alternatives (for example in terms of project design, technology, location, size and scale) studied by the applicant, which are relevant to the works and its specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.E+W+S

3.  A description of the relevant aspects of the current state of the environment (baseline scenario) and an outline of the likely evolution of the environment without implementation of the proposed works as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.E+W+S

4.  A description of the factors specified in rule 7A(2) likely to be significantly affected by the project: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape.E+W+S

5.(1) A description of the likely significant effects of the project on the environment resulting from, amongst other things—E+W+S

(a)the construction and existence of the project, including, where relevant, demolition works;

(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;

(c)the emission of pollutants, noise, vibration, light, heat and radiation, the creation of nuisances, and the disposal and recovery of waste;

(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);

(e)the cumulation of effects with other existing or approved projects, taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;

(f)the impact of the project on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the project to climate change;

(g)the technologies and the substances used.

(2) The description of the likely significant effects on the factors specified in rule 7A(2) must cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the development. [F62This description should take into account the environmental protection objectives which are relevant to the project.]

6.  A description of the forecasting methods or evidence used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.E+W+S

7.  A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis). That description must explain the extent to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and must cover both the construction and operational phases.E+W+S

8.  A description of the expected significant adverse effects of the project on the environment deriving from the vulnerability of the project to risks of major accidents or disasters which are relevant to the project concerned. Relevant information available and obtained through risk assessments pursuant to [F63retained EU law such as any law of any part of the United Kingdom which implemented] Directive 2012/18/EU of the European Parliament and of the Council or Council Directive 2009/71/Euratom or relevant assessments undertaken under [F64other] domestic legislation may be used for this purpose provided that the requirements of [F65any law of any part of the United Kingdom which implemented] the Directive are met. Where appropriate, this description should include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.E+W+S

9.  A non-technical summary of the information provided under paragraphs 1 to 8.E+W+S

10.  A reference list detailing the sources used for the descriptions and assessments included in the environmental statement.]E+W+S

Rules 14, 15 and 17

SCHEDULE 2E+W+SFORMS OF NOTICE

Rule 10(3)

SCHEDULE 3E+W+SFORM OF ESTIMATE OF COSTS

Purpose Amount £
AGeneral 
1.Surveying, drilling and soil sampling. 
2.Acquisition of land and rights over land. 
3.Earthworks (including land reclamation and landscaping). 
4.Fees of professional and other advisers, in connection with the implementation of the project once authorised. 
BTransport systems 
1.Tunnels and bridges. 
2.Highway works, including alterations to and relocation of existing services and statutory undertakers' apparatus. 
3.Permanent way or other supporting/guiding structures. 
4.Workshops, depots, stations and other buildings. 
5.Electrical plant and equipment. 
6.Signalling and communications. 
7.Vehicles. 
8.Alteration, modification and removal of existing works. 
9.Other major items (to be specified). 
CInland waterways 
1.Tunnels, bridges and aqueducts. 
2.Canals, pounds and locks. 
3.Reservoirs, sluices, spillways and culverts. 
4.Wharves and other moorings. 
5.Diversion, alteration, modification and abandonment of existing waterways. 
6.Other major items (to be specified). 
DWorks which interfere with rights of navigation 
1.The principal components of each description of works prescribed by order made under section 4. 
2.Plant, equipment and ancillary works required in connection with such works. 
3.Other major items (to be specified). 

Rule 19(1)

SCHEDULE 4E+W+SFEES

Part 1 E+W+STable of Fees

(1)(2)
Subject- matter of applicationFee

1.  Construction of a transport system or inland waterway which would involve any compulsory acquisition of land but would not involve any interference with rights of navigation.

1.   

(i)For the first hectare or part hectare of the proposed works, £6,600.

(ii)For the next 49 hectares, £1,100 per hectare or part hectare.

(iii)For the next 50 hectares, £550 per hectare or part hectare.

(iv)For any additional area, £275 per hectare or part hectare.

2.  Construction of a transport system or inland waterway which would not require the compulsory acquisition of land and not interfere with rights of navigation.

2.   

(i)For the first hectare or part hectare of the proposed works, £4,400.

(ii)For the next 49 hectares, £550 per hectare or part hectare.

(iii)For any additional area, £110 per hectare or part hectare.

3.  Construction of works any part of which would involve interference with rights of navigation, being of a description prescribed under section 4.

3.   

(a)Where the works to be constructed would not form part of a transport system, an inland waterway or a wind farm—

(i)for the first hectare or part hectare of the proposed works, £8,800;

(ii)for the next 49 hectares, £1,650 per hectare or part hectare;

(iii)for the next 50 hectares, £825 per hectare or part hectare; and

(iv)for any additional area, £412 per hectare or part hectare.

(b)Where the works to be constructed include works which would form part of a transport system or an inland waterway—

(i)for works which would interfere with rights of navigation, as in paragraph 3(a), and

(ii)for other works, as in paragraph 1(ii), (iii) or (iv), or 2(ii) or (iii), as applicable.

(c)Where the works to be constructed would form part of a wind farm—

(i)for a wind farm comprising up to 30 wind turbines, £20,000; and

(ii)for a wind farm comprising 31 or more wind turbines, £20,000 for the first 30 wind turbines plus £500 for each additional wind turbine.

4.  Provision for the transfer of an undertaking.

4.  £2,000.

5.  Provision for any matter other than those described above.

5.  £4,000.

Part 2 E+W+SCalculation of Fees

1.  In this Schedule—E+W+S

compulsory acquisition of land” includes the compulsory extinguishment of easements and other private rights over land (including private rights of navigation over water) and the acquisition of rights to place equipment in a street, to use land (including the right to attach brackets or other equipment to buildings) or to carry out protective works to buildings;

proposal” means—

(a)

in relation to proposed works—

(i)

a single work or works forming an integral whole; or

(ii)

a works project consisting of two or more interdependent parts directed at the same purpose; and

(b)

in relation to any other provision of a draft order—

(i)

a provision not reliant upon any other provision (other than an interpretative or other general provision) for its force and effect; or

(ii)

two or more interdependent provisions directed at the same purpose,

and references to the number of hectares of the proposed works relate to—

(c)

the aggregate area of the land contained within the limits shown on the plans deposited with the application within which it is intended that the proposed works (or part of them) shall be constructed; or

(d)

where no such limits are shown, the aggregate area contained within the boundaries of the land shown on such plans and upon which it is intended that the proposed works (or part of them) shall be constructed;

wind farm” means an electricity generating station driven by wind; and

wind turbine” means a turbine driven by wind.

2.  A fee specified in the table in Part 1 of this Schedule is payable in respect of each proposal in a draft order to which that fee applies.E+W+S

3.  A fee paid under categories 1 to 3 of Part 1 of this Schedule shall cover provisions which are ancillary to the proposed works, such as a power to operate them as a railway or to transfer the undertaking and no additional fee shall be payable in relation to those ancillary provisions.E+W+S

Rule 13(3)

SCHEDULE 5E+W+STHOSE TO BE SERVED WITH A COPY OF THE APPLICATION AND DOCUMENTS

(1)(2)
Authority sought for—Documents to be deposited with—

1.  Works affecting the foreshore below mean high water spring tides, or tidal waters, or the bed of, or the subsoil beneath, tidal waters.

1.  The Crown Estate Commissioners; the Trinity House; the Environment Agency; the Secretary of State for Environment, Food and Rural Affairs, the Secretary of State for Transport (marked “for the attention of the Maritime and Coastguard Agency”); and, for works—

(a)in or adjacent to Wales, the National Assembly for Wales;

(b)in or adjacent to the counties of Devon and Cornwall and the Isles of Scilly, the Duchy of Cornwall; and

(c)in or adjacent to the counties of Cumbria, Lancashire, Merseyside and Cheshire, the Duchy of Lancaster.

2.  Works affecting the banks or the bed of, or the subsoil beneath, a river.

2.  The Environment Agency and any relevant operator.

3.  Works affecting the banks or the bed of, or the subsoil beneath, an inland waterway comprised in the undertaking of the British Waterways Board or any of the reservoirs, feeders, sluices, locks, lifts, drains and other works comprised in or serving the undertaking.

3.  The British Waterways Board, F66... the Inland Waterways Association, the National Association of Boat Owners and the Environment Agency.

4.  Works affecting the banks or the bed of, or the subsoil beneath, a canal or inland navigation not comprised in the undertaking of the British Waterways Board or any of the reservoirs, feeders, sluices, locks, lifts, drains and other works comprised in or serving such canal or inland navigation.

4.  Any relevant operator, the Environment Agency, the Inland Waterways Association and the National Association of Boat Owners.

5.  Works causing or likely to cause an obstruction to the passage of fish in a river.

5.  The Environment Agency and, for works—

(a)in England, the Secretary of State for Environment, Food and Rural Affairs; and

(b)in Wales, the National Assembly for Wales.

6.  Works involving tunnelling or excavation deeper than 3 metres below the surface of the land, other than for piling or making soil tests.

6.  The Environment Agency.

7.  Works affecting an area under the control of a harbour authority as defined in section 57(1) of the Harbours Act 1964 M39.

7.  The relevant harbour authority and the relevant navigation authority (if different).

8.  Works affecting a site protected under the Protection of Wrecks Act 1973 M40.

8.  For works—

(a)in or adjacent to England, the [F67Secretary of State for Culture, Media and Sport]; and

(b)in or adjacent to Wales, the National Assembly for Wales.

9.  Works affecting, or involving the stopping- up or diversion of, a street, or affecting a proposed highway.

9.  The relevant highway authority or, where the street is not a highway maintainable at the public expense, the street managers.

10.  The stopping-up or diversion of a footpath, a bridleway, a byway or a cycle track.

10.  Every parish or community council in whose area the relevant way or track is, or is proposed to be, situated, the Auto-Cycle Union, the British Horse Society, the Byways and Bridleways Trust, the Open Spaces Society, the Ramblers' Association, the British Driving Society and the Cyclists' Touring Club; and for works—

(a)in the counties of Cheshire, Derbyshire, Greater Manchester, Lancashire, Merseyside, South Yorkshire, Staffordshire and West Yorkshire, the Peak and Northern Footpaths Society; and

(b)in the county of Bedfordshire, the borough of Luton and within the district of Mid Bedfordshire the parishes of Harlington and Shillington, and within the district of South Bedfordshire the parishes of Barton le Clay, Caddington and Slip End, Dunstable, Eaton Bray, Houghton Regis, Hyde, Kensworth, Streatley, Studham, Sundon, Toddington, Totternhoe and Whipsnade, the Chiltern Society; and

(c)in the County of Buckinghamshire, in the districts of Chiltern, Wycombe and South Bucks, and within the district of Aylesbury Vale the parishes of Aston Clinton, Buckland, Drayton Beauchamp, Edlesborough Northall and Dagnall, Halton, Ivinghoe, Marsworth, Pitstone, Wendover and Weston Turville, the Chiltern Society; and

(d)in the county of Hertfordshire, in the districts of Dacorum and Three Rivers, and within the district of North Hertfordshire the parishes of Hexton, Hitchin, Ickleford, Ippolitts, Kings Walden, Langley, Lilley, Offley, Pirton, Preston and St Paul's Walden, the Chiltern Society; and

(e)in the county of Oxfordshire, the district of South Oxfordshire, the Chiltern Society; and

(f)in Wales, the Welsh Trail Riders' Association.

11.  The construction of a transport system involving the placing of equipment in or over a street.

11.  The relevant street authority and, where the works are to be carried out in Greater London, Transport for London.

12.  Works affecting land in, on or over which is installed the apparatus, equipment or street furniture of a statutory undertaker.

12.  The relevant statutory undertaker.

13.  Works in an area of coal working notified to the local planning authority by the British Coal Corporation or the Coal Authority.

13.  The Coal Authority.

14.  Works affecting:

(i)a building listed under Part 1 of the Planning (Listed Buildings and Conservation Areas) Act 1990 M41;

(ii)an ancient monument scheduled under the Ancient Monuments and Archaeological Areas Act 1979 M42; or

(iii)any archaeological site.

14.  (i), (ii) and (iii). For works—

(a)in or adjacent to England, the Historic Buildings and Monuments Commission for England; and

(b)in or adjacent to Wales, the National Assembly for Wales and the Royal Commission on Ancient and Historical Monuments in Wales.

15.  Works affecting:

(i)a conservation area designated under Part 2 of the Planning (Listed Buildings and Conservation Areas) Act 1990; or

(ii)an area of archaeological importance designated under section 33 of the Ancient Monuments and Archaeological Areas Act 1979.

15.  (i) and (ii). For works—

(a)in England, the Historic Buildings and Monuments Commission for England; and

(b)in Wales, the National Assembly for Wales.

16.  Works affecting a garden or other land of historic interest registered pursuant to section 8C of the Historic Buildings and Ancient Monuments Act 1953 M43.

16.  For works—

(a)in England, the Historic Buildings and Monuments Commission for England; and

(b)in Wales, the National Assembly for Wales.

17.  Works affecting:

(i)a site of special scientific interest of which notification has been given or has effect as if given under section 28(1) of the Wildlife and Countryside Act 1981 M44;

(ii)an area within 2 kilometres of such a site of special scientific interest and of which notification has been given to the local planning authority; or

(iii)land declared to be a national nature reserve under section 35 of the Wildlife and Countryside Act 1981; or a marine nature reserve designated under section 36 of that Act.

17.  (ii) and (iii). For works—

(a)in or adjacent to England, English Nature; and

(b)in or adjacent to Wales, the Countryside Council for Wales.

18.  Works affecting a National Park or an Area of Outstanding Natural Beauty.

18.  For works—

(a)in England, the Countryside Agency; and

(b)in Wales, the Countryside Council for Wales.

19.  Works which are either:

(i)within 3 kilometres of Windsor Castle, Windsor Great Park or Windsor Home Park; or

(ii)within 800 metres of any other royal palace or royal park and which are likely to affect the amenity or security of that palace or park.

19.  The [F67Secretary of State for Culture, Media and Sport].

20.  Works which are within 250 metres of land which:

(i)is, or has been within 30 years immediately prior to the date of the application, used for the deposit of refuse or waste ; or

(ii)has been notified to the local planning authority by the waste regulation or disposal authority for the relevant area.

20.  The Environment Agency.

21.  The carrying-out of an operation requiring hazardous substances consent under the Planning (Hazardous Substances) Act 1990 M45.

21.  The hazardous substances authority as defined in that Act and the Health and Safety Executive.

[F6821A .  A relevant project as defined in regulation 26(5) of the Planning (Hazardous Substances) Regulations 2015.

21A.  The COMAH competent authority as defined in regulation 2(1) of those Regulations.]

22.  Works not in accordance with a development plan and which either—

(i)involve the loss of not less than 20 hectares of agricultural land of grades 1, 2 and 3a (in aggregate); or

(ii)taken with the other associated works cumulatively involve the loss of not less than 20 hectares of such land.

22.  (i) and (ii). For works—

(a)in England, the Secretary of State for Environment, Food and Rural Affairs; and

(b)in Wales, the National Assembly for Wales.

23.   

(i)Works which would affect the operation of any existing railway passenger or tramway services provided under statutory powers; or

(ii)the construction of a new railway for the provision of public passenger transport, or of a new tramway.

23.  [F69Passengers’ Council] or the London Transport Users' Committee M46 as the case may require.

24.  Works to construct, alter or demolish a transport system or to carry out works ancillary to its operation or works consequential upon its abandonment or demolition.

24.  Her Majesty's Railway Inspectorate.

25.  Works to construct new railways to which any regulatory provisions in the Railways Act 1993 M47 would apply or provisions to amend existing powers in relation to railways subject to such regulation.

25.  [F70the Office of Rail and Road].

26.  The right for a person providing transport services to use a transport system belonging to another.

26.  The operator of the relevant transport system.

27.  Works affecting land in which there is a Crown interest.

27.  The appropriate authority for the land, within the meaning of section 25(3).

28.  Works to be carried out in Greater London.

28.  The Mayor of London.

Rule 14(4)

SCHEDULE 6E+W+STHOSE TO BE SERVED WITH NOTICE OF APPLICATION

(1)(2)
Authority sought for—Those to be served—

1.  Works affecting the foreshore below mean high water spring tides, tidal waters or the bed of, or subsoil beneath, tidal waters (except where the land affected by the works falls within category 17 of Schedule 5 to these Rules).

1.  For works—

(a)in or adjacent to England, English Nature; and

(b)in or adjacent to Wales, the Countryside Council for Wales.

2.  Works affecting the banks or the bed of, or the subsoil beneath, a river.

2.  The Crown Estate Commissioners; and (except where the land affected falls within category 17 of Schedule 5 to these Rules) for works—

(a)in England, English Nature; and

(b)in Wales, the Countryside Council for Wales.

3.Works affecting the banks or the bed of, or the subsoil beneath, an inland waterway, a canal or inland navigation, or any of the reservoirs, feeders, sluices, locks, lifts, drains and other works comprised in or serving that inland waterway, canal or inland navigation.

3.  Any organisation (other than the Inland Waterways Association and the National Association of Boat Owners) upon which the Secretary of State has required the applicant to serve notice, as appearing to the Secretary of State to represent a substantial number of persons using the inland waterway, canal or inland navigation in question; and (except where the land affected falls within category 17 of Schedule 5 to these Rules) for works—

(a)in England, English Nature; and

(b)in Wales, the Countryside Council for Wales.

4.  Works affecting an area under the control of a harbour authority as defined in section 57(1) of the Harbours Act 1964 M48.

4.  The navigation authority for any adjoining waterway (if different from the navigation authority for the harbour area) and the conservancy authority for any adjoining waterway.

5.  Works which would, or would apart from the making of an order, require a consent to the discharge of matter into waters or onto land under Chapter 2 of Part 3 of the Water Resources Act 1991 M49.

5.  The Environment Agency.

6.  Works likely to affect the volume or character of traffic entering or leaving—

(i)a special road or trunk road;

(ii)any other classified road.

6.   

(i)For works—

(a)in England, [F71the relevant highway authority]; and

(b)in Wales, the National Assembly for Wales.

(ii)The relevant highway authority.

7.  The construction of a transport system involving the placing of equipment in or over a street (except a level crossing).

7.  Owners and occupiers of all buildings which have a frontage on, or a private means of access which first meets the highway at, the part of the street in or over which equipment is to be placed, other than those on whom a notice has been served pursuant to rule 15(1).

8.  Works affecting any land on which there is a theatre as defined in section 5 of the Theatres Trust Act 1976 M50.

8.  The Theatres Trust.

9.  The modification, exclusion, amendment, repeal or revocation of a provision of an Act of Parliament or statutory instrument conferring protection or benefit upon any person (whether in his capacity as the owner of designated land or otherwise) specifically named therein.

9.  The person upon whom such protection or benefit is conferred, or the person currently entitled to that protection or benefit.

10.  The compulsory purchase of ecclesiastical property (as defined in section 12(3) of the Acquisition of Land Act 1981 M51).

10.  The Church Commissioners.

11.  Works in Greater London or a metropolitan county.

11.  The relevant Fire and Rescue Authority within the meaning of Part 1 of the Fire and Rescue Services Act 2004 M52 and the relevant Police Authority within the meaning of Part 1 of the Police Act 1996 M53.

12.  The right to monitor, survey or investigate land (including any right to make trial holes in land).

12.  Every owner and occupier of the land, other than an owner or occupier named in the book of reference as having an interest or right in or over that land.

13.  Works or traffic management measures that would affect services provided by a universal service provider in connection with the provision of a universal postal service and relating to the delivery or collection of letters.

13.  Every universal service provider affected.

14.  Works in an area of coal working notified to the local planning authority by the British Coal Corporation or the Coal Authority.

14.  The holder of the current licence under section 36(ii) of the Coal Industry Nationalisation Act 1946 M54 or under Part 2 of the Coal Industry Act 1994 M55.

15.  Works for which an environmental impact assessment is required.

15.  For works—

F72(a). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)in Wales, the Design Commission for Wales.

16.  The compulsory acquisition of land, or the right to use land, or the carrying out of protective works to buildings.

16.  Any person, other than a person who is named in the book of reference described in rule 12(8), whom the applicant thinks is likely to be entitled to make a claim for compensation under section 10 of the Compulsory Purchase Act 1965 M56 if the order is made and the powers in question are exercised, so far as he is known to the applicant after making diligent inquiry.

Rule 20

SCHEDULE 7E+W+SPROPOSALS FOR ORDERS UNDER SECTION 7

1.  In this Schedule “the publication date” means the date of publication of the notice required by paragraph 11.E+W+S

2.  Where by virtue of this Schedule any provisions of these Rules apply in relation to a proposal of the Secretary of State to make an order under section 7, any reference in those provisions to—E+W+S

an applicant” shall be construed as references to the Secretary of State; and

an “application” shall be construed as references to the publication by the Secretary of State of the notice required by paragraph 11.

3.  When the Secretary of State proposes to make an order under section 7 which would authorise a project [F73(as defined in Article 1(2)(a) of the Directive)] he shall determine whether an environmental impact assessment is necessary.E+W+S

4.  If the project is of a type mentioned in—E+W+S

(a)Annex I to the Directive; or

(b)Annex II to the Directive and the Secretary of State considers that it would be likely to have a significant effect on the environment,

the Secretary of State shall determine that an environmental impact assessment is required unless the proposed works comprise or form part of a project serving national defence [F74as its sole purpose, or comprise a project having the response to a civil emergency as its sole purpose, and he considers that the carrying out of an environmental impact assessment of the works would have an adverse effect on that purpose.]

5.[F75(1)] Where the project is of a type mentioned in Annex II to the Directive the Secretary of State shall, for the purposes of determining whether an environmental impact assessment is necessary, consult those mentioned in rule 7(8) and provide them with the information described in rule 7(5) unless—E+W+S

(a)he has already formed the view that the project would be likely to have a significant effect on the environment; or

(b)the works comprise or form part of a project serving national defence [F76as its sole purpose, or comprise a project having the response to a civil emergency as its sole purpose, and he considers that the carrying out of an environmental impact assessment of the works would have an adverse effect on that purpose.]

[F77(2) When carrying out consultation under sub-paragraph (1), the Secretary of State may also provide (in addition to the information described in rule 7(5)) a description of any features of the proposed works or any measures envisaged to avoid or prevent what might otherwise have been significant adverse effects on the environment.]

6.  Any body or person consulted pursuant to paragraph 5 shall, not later than 28 days after being consulted, provide the Secretary of State with a written opinion as to whether, in their opinion, the works in question should be the subject of an environmental impact assessment.E+W+S

[F787.  In reaching his determination as to whether an environmental impact assessment is necessary, the Secretary of State shall take into account—E+W+S

(a)any information provided to the Secretary of State pursuant to paragraph 5;

(b)where relevant, the results of other environmental assessments carried out pursuant to [F79retained EU law] other than legislation [F80which implemented] the requirements of the Directive; and

(c)such of the selection criteria set out in Annex III to the Directive as are relevant to the proposed works.]

8.  Any determination by the Secretary of State as to whether an environmental impact assessment is necessary, together with the reasons for that determination, shall be published in the London Gazette and in a local newspaper prescribed in rule 14(3) within 14 days of such a determination being reached.E+W+S

9.  Where the Secretary of State has determined that an environmental impact assessment of the proposed works is necessary he shall consult those bodies and persons mentioned in rule 8(4) before reaching an opinion as to the information to be provided in the environmental statement.E+W+S

10.  Where any body or person consulted pursuant to paragraph 9 wishes to provide the Secretary of State with a written opinion as to the information to be provided in the environmental statement he shall do so no later than 28 days after being consulted.E+W+S

11.  Where, following completion of any necessary action pursuant to paragraphs 3 to 10, the Secretary of State proposes to make an order under section 7, he shall publish a notice of the proposals in the London Gazette, which notice shall include—E+W+S

(a)the title of the proposed order, a concise summary of the matters provided for in the proposed order and the location of any proposed works;

(b)if applicable, a statement that the Secretary of State proposes to direct that planning permission or hazardous substances consent, as the case may be, shall be deemed to be granted;

(c)a statement as to whether or not the proposals are subject to an environmental impact assessment;

(d)the address to which objections and other representations are to be sent and the date of expiry of the period within which they must be made (being not less than 42 days from the date of the notice); and

(e)the address, if different, to which requests may be made for further information about the proposed order (and, if applicable, any proposed direction for deemed planning permission or deemed hazardous substances consent).

12.  The Secretary of State shall publish, in newspapers prescribed in rule 14(3), a notice containing—E+W+S

(a)the information specified in paragraph 11; and

[F81(b)the names or details of—

(i)all places, which shall be places within the area to which the proposals in the proposed order relate (or as close as reasonably practicable to that area) where, at all reasonable hours during the period specified in pursuance of paragraph 11(d), the documents referred to in paragraph 14 may be inspected or be viewed in an electronic form free of charge; or

(ii)a website where copies of the documents referred to in paragraph 14 are displayed,]

such notice to be published on two separate occasions, the first publication to be not more than 14 days before, and not later than, the publication date and the second to be not more than 7 days after that date.

[F8212A.(1) Where the Secretary of State has determined that an environmental impact assessment of the proposed works is necessary he must arrange for a notice containing the information specified in paragraph 12(a) and (b), together with a copy of the environmental statement, to be published on a website maintained by or on behalf of the Secretary of State for that purpose.]E+W+S

13.  The Secretary of State shall, forthwith after the publication date, serve a copy of the documents mentioned in paragraph 14 upon every local authority in whose areas the proposals are situated and every relevant coastal authority, and shall deposit copies of those documents in the library of the House of Commons and, where he considers it appropriate, in the library of the House of Lords.E+W+S

14.  The documents to be served by virtue of paragraph 13 are—E+W+S

(a)a draft of the proposed order;

(b)an explanatory memorandum that explains the purpose and effect of each article and schedule in the draft order;

(c)a concise statement of the aims of the proposals;

(d)a report summarising the consultations that have been undertaken, including confirmation that the Secretary of State has consulted all those named in column (2) of the tables in Schedules 5 and 6 to these Rules where authority is sought for works or other matters described in column (1) of those tables or, if not, an explanation of why not;

(e)a list of all consents, permissions or licences required under other enactments in connection with the proposals which, at the publication date, are being sought or which have been obtained or refused, specifying for each relevant consent, permission or licence the information referred to in rule 10(2)(f)(i), (ii) and (iii);

(f)where the proposed works are to be subject to an environmental impact assessment, an environmental statement, which shall include the information referred to in rule 11;

(g)a copy of any waiver statement made under paragraph 34;

(h)where the proposed order would authorise the carrying out of works—

(i)subject to paragraph 15, the plans and sections described in paragraphs (1) and (3) of rule 12;

(ii)an estimate of the cost of carrying out the works, which shall be in the form set out in Schedule 3 to these Rules or as nearly in that form as circumstances permit;

(i)subject to sub-paragraph (j) and paragraph 15, where the proposed order would authorise the compulsory acquisition of land, or the right to use land, or to carry out protective works to buildings, or the compulsory extinguishment of easements and other private rights over land (including private rights of navigation over water), the plan and book of reference respectively described in paragraphs (5) and (8) of rule 12 subject to paragraphs (10) and (11) of that rule;

(j)where the proposed order would provide for the extinguishment or diversion of rights of way over a footpath, bridleway, cycle track or byway, a map of a scale not smaller than 1:2500 on which the path, way or track concerned, and, in the case of diversion, the new path, way or track is clearly delineated;

(k)where the Secretary of State proposes to direct under section 90(2A) of the Planning Act that planning permission shall be deemed to be granted, a statement signed by or on behalf of the Secretary of State specifying—

(i)the development to which the direction would apply;

(ii)any proposed conditions attaching to it;

(iii)a list of any matters which are intended to be reserved for subsequent approval by the local planning authority; and

(iv)in respect of those matters not intended to be so reserved, such further documents and information as may be necessary to support the making of the direction;

(l)where the Secretary of State proposes to direct under section 12(2A) of the Planning (Hazardous Substances) Act 1990 M57 that hazardous substances consent shall be deemed to be granted, Form 1 or Form 2 of the forms prescribed in Schedule 2 to the Planning (Hazardous Substances) Regulations 1992 M58 as the case may require, duly completed and signed by or on behalf of the Secretary of State, and the information and documentation specified in one or more of regulations 5(1)(b) and 5(3)(b) of those Regulations as the case may require; and

(m)a statement specifying the capacity (or, if more than one, the capacities) in which the recipient is served, the expiry date for objections and other representations and the address to which an objection or other representation is to be sent.

Marginal Citations

M571990 c. 10. Subsection (2A) was inserted by section 18 of the Transport and Works Act 1992 (c. 42).

15.  The Secretary of State may, if he considers it reasonable and appropriate, vary the scale of the plans and sections referred to in sub-paragraphs (h) and (i) of paragraph 14.E+W+S

16.  Where the proposed order relates to works of a kind described in section 3(1)(b), the Secretary of State shall, forthwith after the publication date, serve a copy of the documents specified in paragraph 14 upon the Trinity House.E+W+S

17.  Where the proposed order would authorise the works or other matters specified in any of the categories in column (1) of the table in Schedule 5 to these Rules, the Secretary of State shall, forthwith after the publication date, serve upon those named against such category in column (2) of that table a copy of the proposed order and the following supporting documents—E+W+S

(a)the explanatory memorandum required by paragraph 14(b);

(b)the concise statement of aims required by paragraph 14(c);

(c)the summary report of consultations required by paragraph 14(d);

(d)any environmental statement required by paragraph 14(f);

(e)any waiver statement made under paragraph 34;

(f)the plans and sections required by paragraph 14(h) and (i), in so far as they are relevant to the category in the table in Schedule 5 to these Rules under which the copy of the proposed order is served;

(g)any cost estimate required by paragraph 14(h)(ii);

(h)in the case of category 10 in the table in Schedule 5 to these Rules, the map referred to in paragraph 14(j); and

(i)the statement referred to in paragraph 14(m).

18.  The Secretary of State shall, forthwith after the publication date, serve a copy of the proposed order and the supporting documents listed in paragraph 17 on any body not mentioned in Schedule 5 to these Rules which is designated by statutory provision[F83, or by the Secretary of State on a case-by-case basis,] as having specific environmental responsibilities [F84or local or regional competencies] and which the Secretary of State considers is likely to have an interest in the application.E+W+S

19.  The Secretary of State shall not be obliged by virtue of paragraph 13, 16 or 17 to serve upon anyone more than one copy of the same document; and where anyone has confirmed to the Secretary of State in writing that he does not wish to be served with a copy of, or a copy of any part of, a document that the Secretary of State is required to serve upon him by virtue of those paragraphs, the Secretary of State shall not be required to serve upon him that document or the relevant part of it.E+W+S

20.  Where the proposed order includes works or other matters specified in any of the categories of column (1) of the table in Schedule 6 to these Rules, the Secretary of State shall, forthwith after the publication date, serve upon those named against such category in column (2) of that table a notice containing the information specified in paragraph 12, which notice shall state the capacity (or, if more than one, the capacities) in which the recipient of the notice is served.E+W+S

21.  Where the proposed order makes any provision—E+W+S

(a)for the purpose of suspending or discontinuing any operations; or

(b)in consequence of the abandonment or neglect of any works,

the Secretary of State shall, forthwith after the publication date, serve upon every operator affected or likely to be affected a notice containing the information specified in paragraph 12, which notice shall state the capacity in which the recipient of the notice is served.

22.  Where the proposed order would authorise works, the Secretary of State shall, forthwith after the publication date, display one or more notices in the form of Form 2 in Schedule 2 to these Rules in accordance with the requirements of rule 14(6).E+W+S

23.  Where the proposed order would authorise any of the matters described in rule 14(7)(a) or (b), the Secretary of State shall, forthwith after the publication date, display one or more of the notices in the form of Form 3 in Schedule 2 to these Rules in accordance with the requirements of rule 14(7).E+W+S

24.  Where the proposed order provides for the discontinuance of railway passenger or tramway services in the circumstances described in rule 14(8), the Secretary of State shall, forthwith after the publication date, display one or more notices in the form of Form 4 in Schedule 2 to these Rules in accordance with the requirements of rule 14(8).E+W+S

25.  The Secretary of State shall use his best endeavours to ensure that every notice displayed under the provisions of paragraphs 22 to 24 shall continue to be displayed in a legible form until the expiry date for objections or other representations specified under paragraph 11(d).E+W+S

[F8526.  The Secretary of State shall supply a copy of any document referred to in paragraph 14 to any person who requests such a copy, subject to the payment by that person of a reasonable charge for the provision of the copy, and he shall ensure that the information as to how such copies may be obtained is displayed—E+W+S

(a)at every place at which copies of those documents are made available for inspection; and

(b)on any website where copies of those documents are displayed.]

27.  Where paragraph 14(i) applies, the Secretary of State shall, forthwith after the publication date, serve a notice in the form of Form 5 in Schedule 2 to these Rules upon all those named in the book of reference other than the owner of a Crown interest.E+W+S

28.  Where pursuant to rule 12(10), as applied by paragraph 14(i), the Secretary of State has indicated in the book of reference that relevant names have or might have been omitted, he shall, forthwith after the publication date, serve a notice in the form of Form 5 in Schedule 2 to these Rules in the manner provided by section 66(4)(a) and (b).E+W+S

29.  Where [F86the Secretary of State has determined under paragraph 3 that an environmental impact assessment is necessary and] it appears to the Secretary of State that the proposed order relates to works which would be likely to have significant effects on the environment in Wales, Scotland, Northern Ireland, the Isle of Man or the Channel Islands, he shall publish the information specified in paragraph 12 in such newspapers circulating in the place in question as he may consider appropriate.E+W+S

30.—(1) This paragraph shall apply where [F87the Secretary of State has determined under paragraph 3 that an environmental impact assessment is necessary and]E+W+S

(a)it appears to the Secretary of State that the proposed order relates to works which would be likely to have significant effects on the environment of [F88a] Member State; or

(b)[F89a] Member State whose environment is likely to be significantly affected by the works to which the proposed order relates, requests information relating to the proposed order.

(2) Where this paragraph applies, the Secretary of State shall—

(a)send the information mentioned in rule 16(5) to the Member State in question as soon as reasonably practicable and in any event no later than the publication date or, in a case falling within sub-paragraph (1)(b), no later than 7 days after receiving a request from the Member State in question;

(b)give the Member State in question a reasonable time in which to indicate whether it wishes to participate in the procedure for consideration of the proposed order;

(c)take such steps as he considers necessary to ensure that the public is informed that the project is likely to have significant effects on the environment of [F90a] Member State and that the provisions of this paragraph apply;

(d)where a Member State has indicated that it wishes to participate in the procedure for considering the proposed order, send to the State in question (in so far as these documents and information have not already been supplied to that State) a copy of the proposed order and of the environmental statement and any other relevant information regarding the procedure for considering the proposed order and for undertaking an environmental impact assessment of the proposed works; and

(e)comply with the requirements of rule 16(7) and (8), on the basis that the documents and information to be made available under rule 16(7)(a) shall be the documents and information referred to in rule 16(5) and sub-paragraph (2)(d) of this paragraph.

31.  Where after serving a copy of any environmental statement under paragraph 13 the Secretary of State produces further environmental information for the purposes of the proposed order, he shall, unless the information is provided for the purpose of a public local inquiry into the proposed order and is to be made available for public inspection in connection with that inquiry—E+W+S

(a)publish a notice of that further environmental information in the newspapers prescribed in rule 14(3);

(b)serve a copy of the information on each person on whom, in accordance with this Schedule, a copy of his environmental statement was served;

(c)provide a copy of the information (or any part of it) to any other person who so requests, subject to the payment by that person of a reasonable charge[F91; and

(d)arrange for a copy of the information to be published on a website maintained by or on behalf of the Secretary of State for that purpose.]

32.  Subject to paragraphs 33 and 34, the Secretary of State may, following consultation with all those he considers would be likely to be affected, waive any provision of this Schedule, in whole or in part, where he considers that it is impossible, impracticable or unnecessary for him to comply with that provision or to comply in full.E+W+S

33.  The Secretary of State shall not waive any provisions of paragraphs 2 to 10, 14(f), 18 and 29 to 31 of this Schedule.E+W+S

34.  Where the Secretary of State decides to waive any provisions of this Schedule in accordance with paragraph 32, he shall send a statement to that effect to all that he has consulted.E+W+S

35.  The Secretary of State may, for the purpose of determining whether or not to make the proposed order, send any objection or other representation he has received to any other person and invite comments from that person within such period as he may specify.E+W+S

36.  The Secretary of State may disregard any comments that are not sent to him within the period specified pursuant to paragraph 35 and, except where paragraph 37 applies, he may, upon expiry of the specified period, proceed to a determination.E+W+S

37.  Where the Secretary of State causes a public local inquiry or hearing to be held under section 11 for the purposes of the proposed order, he shall submit every objection and other representation that he has received to the person appointed to hold the inquiry or hearing, as soon as it is reasonably practicable to do so.E+W+S

38.  The following provisions of these Rules shall also have effect in relation to the Secretary of State's proposal to make an order—E+W+S

(a)rule 6;

(b)rule 21(1), with the exception of the words “Subject to paragraph (2)”; and

(c)rule 22(3).

Explanatory Note

(This note is not part of the Rules)

These Rules replace, subject to the transitional provisions in rule 3, the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000 (“the 2000 Rules”). The Rules prescribe the procedures for—

(a)

the making of applications for orders under Part 1 of the Transport and Works Act 1992 (“the Act”);

(b)

proposals for orders to be made by the Secretary of State otherwise than on application; and

(c)

the making of objections and other representations relating to such applications and proposals.

They also prescribe the procedures for handling objections where the Secretary of State decides not to hold a public inquiry or a hearing under section 11 of the Act.

The Rules include changes to the procedures set out in the 2000 Rules, the main changes to the previous system being—

(a)

to provide for electronic service of documents and to remove requirements on applicants to serve documents on those who confirm they do not require them, or only require a part;

(b)

a requirement to send the Secretary of State, at least 28 days before an application is made, a draft of the proposed order and explanatory memorandum explaining the purpose and effect of the order provisions (rule 5);

(c)

the submission of a summary report of consultations undertaken, an explanatory memorandum and concise statement of the aims of the proposals (rule 10);

(d)

to enable the Secretary of State to send objectors and other interested parties copies of objections and other representations made by others (rule 22);

(e)

to provide for a more disciplined and timetabled process for exchanging written representations where the Secretary of State decides not to hold a public local inquiry under section 11 of the Act (rule 24); and

(f)

an increase in application fees (Schedule 4 Part 1):

Subject matter of applicationAreaFee in 2000 RulesFee in these RulesPercentage increase

1.  Construction of a transport system or inland waterway which would involve any compulsory acquisition of land but would not involve any interference with rights of navigation

For the first hectare or part hectare of the proposed works£6,000£6,60010%
 For the next 49 hectares£1,000 ph£1,100 ph10%
 For the next 50 hectares£500 ph£550 ph10%
 For any additional area£250 ph£275 ph10%

2.  Construction of a transport system or inland waterway which would not require the compulsory acquisition of land and not interfere with rights of navigation

For the first hectare or part hectare of the proposed works£4,000£4,40010%
 For the next 49 hectares£500 ph£550 ph10%
 For any additional area£100 ph£110 ph10%

3.  Construction of works any part of which would involve interference with rights of navigation, being of a description prescribed under section 4, where the works to be constructed would not form part of a transport system, an inland waterway or a wind farm

For the first hectare or part hectare of the proposed works£8,000£8, 80010%
 For the next 49 hectares£1,500 ph£1,650 ph10%
 For the next 50 hectares£750 ph£825 ph10%
 For any additional area£375 ph£412 ph9.9%

4.  Provision for the transfer of an undertaking

 £1,500£2,00033.3%
5. Provision for any matter other than those described above £3,500£4,00014.3%

Key: ph means per hectare.

The Rules include changes to implement the amendments to Council Directive 85/337/EEC on environmental impact assessment made by Council Directive 2003/35/EC (the `Public Participation Directive'). The Public Participation Directive makes amendments to the provisions for the public participation in the drawing up of certain plans and programmes relating to the environment. A Transposition Note, which has been prepared for this instrument, is available from the TWA Orders Unit, Department for Transport, Zone 2 Floor 9, Southside, 105 Victoria Street, London SW1E 6DT (Telephone 020 7944 2488).

A full Regulatory Impact Assessment of the effect that this instrument will have on the costs of business is available from the TWA Orders Unit, Department for Transport (as above). Copies of the Regulatory Impact Assessment and of the Transposition Note have been placed in the library of each House of Parliament.

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources