Regulation (EU) 2017/1938 of the European Parliament and of the Council of 25 October 2017 concerning measures to safeguard the security of gas supply and repealing Regulation (EU) No 994/2010 (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE. EUR-Lex Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex. The EU Exit Web Archive legislation_originated_from_EU_p3
EU_status_warning_original_version
This legislation may since have been updated - see the latest available (revised) version
The risk groups of Member States that serve as the basis for risk associated cooperation as referred to in Article 3(7) are the following:
Eastern gas supply risk groups:
Ukraine: Bulgaria, Czech Republic, Germany, Greece, Croatia, Italy, Luxembourg, Hungary, Austria, Poland, Romania, Slovenia, Slovakia;
Belarus: Belgium, Czech Republic, Germany, Estonia, Latvia, Lithuania, Luxembourg, Netherlands, Poland, Slovakia;
Baltic Sea: Belgium, Czech Republic, Denmark, Germany, France, Luxembourg, Netherlands, Austria, Slovakia, Sweden;
North-Eastern: Estonia, Latvia, Lithuania, Finland;
Trans-Balkan: Bulgaria, Greece, Romania.
North Sea gas supply risk groups:
Norway: Belgium, Denmark, Germany, Ireland, Spain, France, Italy, Luxembourg, Netherlands, Portugal, Sweden, United Kingdom;
Low-calorific gas: Belgium, Germany, France, Netherlands;
Denmark: Denmark, Germany, Luxembourg, Netherlands, Sweden;
United Kingdom: Belgium, Germany, Ireland, Luxembourg, Netherlands, United Kingdom.
North African gas supply risk groups:
Algeria: Greece, Spain, France, Croatia, Italy, Malta, Austria, Portugal, Slovenia;
Libya: Croatia, Italy, Malta, Austria, Slovenia.
South-East gas supply risk groups:
Southern Gas Corridor — Caspian: Bulgaria, Greece, Croatia, Italy, Hungary, Malta, Austria, Romania, Slovenia, Slovakia;
Eastern Mediterranean: Greece, Italy, Cyprus, Malta.
The N – 1 formula describes the ability of the technical capacity of the gas infrastructure to satisfy total gas demand in the calculated area in the event of disruption of the single largest gas infrastructure during a day of exceptionally high gas demand occurring with a statistical probability of once in 20 years.
Gas infrastructure shall cover the gas transmission network including interconnections, as well as production, LNG and storage facilities connected to the calculated area.
The technical capacity of all remaining available gas infrastructure in the event of disruption of the single largest gas infrastructure shall be at least equal to the sum of the total daily gas demand of the calculated area during a day of exceptionally high gas demand occurring with a statistical probability of once in 20 years.
The results of the N – 1 formula, as calculated below, shall be at least equal to 100 %.
The parameters used for the calculation shall be clearly described and justified.
For the calculation of the EPm, a detailed list of the entry points and their individual capacity shall be provided.
‘Calculated area’ means a geographical area for which the N – 1 formula is calculated, as determined by the competent authority.
‘Dmax’ means the total daily gas demand (in mcm/d) of the calculated area during a day of exceptionally high gas demand occurring with a statistical probability of once in 20 years.
‘EPm’: technical capacity of entry points (in mcm/d), other than production, LNG and storage facilities covered by Pm, LNGm and Sm, means the sum of the technical capacity of all border entry points capable of supplying gas to the calculated area.
‘Pm’: maximal technical production capability (in mcm/d) means the sum of the maximal technical daily production capability of all gas production facilities which can be delivered to the entry points in the calculated area.
‘Sm’: maximal technical storage deliverability (in mcm/d) means the sum of the maximal technical daily withdrawal capacity of all storage facilities which can be delivered to the entry points of the calculated area, taking into account their respective physical characteristics.
‘LNGm’: maximal technical LNG facility capacity (in mcm/d) means the sum of the maximal technical daily send-out capacities at all LNG facilities in the calculated area, taking into account critical elements like offloading, ancillary services, temporary storage and re-gasification of LNG as well as technical send-out capacity to the system.
‘Im’ means the technical capacity of the single largest gas infrastructure (in mcm/d) with the highest capacity to supply the calculated area. When several gas infrastructures are connected to a common upstream or downstream gas infrastructure and cannot be separately operated, they shall be considered as one single gas infrastructure.
‘Deff’ means the part (in mcm/d) of Dmax that in the case of a disruption of gas supply can be sufficiently and timely covered with market-based demand-side measures in accordance with point (c) of Article 9(1) and Article 5(2).
The calculated area referred to in point 3 shall be extended to the appropriate regional level, where applicable, as determined by the competent authorities of the Member States concerned. The calculation may also extend to the regional level of the risk group, if so agreed with the competent authorities of the risk group. For the calculation of the N – 1 formula at regional level, the single largest gas infrastructure of common interest shall be used. The single largest gas infrastructure of common interest to a region shall be the largest gas infrastructure in the region that directly or indirectly contributes to gas supply to the Member States of that region and shall be defined in the risk assessment.
The calculation of the N – 1 formula at regional level may replace the calculation of the N – 1 formula at national level only where the single largest gas infrastructure of common interest is of major importance for the gas supply of all Member States concerned in accordance with the common risk assessment.
On the level of the risk group, for the calculations referred to in Article 7(4), the single largest gas infrastructure of common interest to the risk groups as listed in Annex I shall be used.
a proposal to enable permanent physical capacity to transport gas in both directions for permanent bi-directional capacity concerning the reverse direction (‘physical reverse flow capacity’); or
a request for an exemption from the obligation to enable bi-directional capacity.
The transmission system operators shall endeavour to submit a joint proposal or request for exemption. In the case of a proposal to enable bi-directional capacity, the transmission system operators may make a substantiated proposal for a cross-border cost allocation. Such submission shall take place no later than 1 December 2018 for all interconnections that existed on 1 November 2017, and after completing the feasibility study phase but before the start of detailed technical design phase for new interconnections.
accept the proposal for bi-directional capacity. Such decision shall contain a cost benefit analysis, a timeline for implementation and the arrangements for its subsequent use and be accompanied by the coordinated decision on the cross-border cost allocation referred to in point 4 and prepared by the regulatory authorities concerned;
grant or prolong a temporary exemption for a maximum period of four years, if the cost-benefit analysis included in the decision shows that the reverse flow capacity would not enhance the security of gas supply of any relevant Member State or if the investment costs would significantly outweigh the prospective benefits for the security of gas supply; or
require the transmission system operators to amend and resubmit their proposal or exemption request within a maximum period of four months.
In the event that the Commission does not act within the aforementioned four months period, it shall be considered not to have raised objections to the decision of the competent authorities concerned.
The following template shall be completed in a language agreed within the risk group.
Member States in the risk group
Name of the competent authorities responsible for the preparation of the risk assessment(1)
Provide a brief description of the gas system of the risk group, covering:
the main gas consumption figures(2): annual final gas consumption (bcm) and breakdown per type of customers(3), peak demand (total and breakdown per category of consumer in mcm/d);
a description of the functioning of the gas system in the risk group: main flows (entry/exit/transit), entry/exit point's infrastructure capacity to and out of the region and per Member State, including utilisation rate, LNG facilities (maximal daily capacity, utilisation rate and access regime), etc.;
a breakdown, to the extent possible, of gas import sources per country of origin(4);
a description of the role of storage facilities relevant for the risk group, including cross-border access:
the storage capacity (total and working gas) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production in the risk group:
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity).
Describe the calculations of the N – 1 formula(s) at regional level for the risk group, if so agreed with the competent authorities of the risk group, and the existing bidirectional capacities, as follows:
N – 1 formula
the identification of the single largest gas infrastructure of common interest for the risk group;
the calculation of the N – 1 formula at regional level;
a description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
an indication of the methodologies and assumptions used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations);
bi-directional capacity
indicate the interconnection points equipped with bidirectional capacity and the maximal capacity of bi-directional flows;
indicate the arrangements governing the use of the reverse flow capacity (e.g. interruptible capacity);
indicate interconnection points where an exemption has been granted in accordance with Article 5(4), the duration of the exemption and the grounds on which it was granted.
Describe the major transnational risk for which the group was created as well as the risk factors at several instances which could make that risk materialise, their likelihood and consequences.
Non-exhaustive list of risk factors that have to be included in the assessment only if applicable according to the relevant competent authority:
political
gas disruption from third countries because of different reasons,
political unrest (either in country of origin or in transit country),
war/civil war (either in country of origin or in transit country),
terrorism;
technological
explosion/fires,
fires (internal to a given facility),
leakages,
lack of adequate maintenance,
equipment malfunction (failure to start, failure during working time, etc.),
lack of electricity (or other energy source),
ICT failure (hardware or software failure, internet, SCADA problems, etc.),
cyber-attack,
impact due to excavation works (digging, piling), ground works, etc.;
commercial/market/financial
agreements with third-country suppliers,
commercial dispute,
control of infrastructure relevant for the security of gas supply by third-country entities, which may imply, among others, risks of underinvestment, undermining diversification or non-respect of Union law,
price volatility,
underinvestment,
sudden, unexpected peak demand,
other risks which could lead to structural underperformance;
social
strikes (in different related sectors, such as the gas sector, ports, transport, etc.),
sabotage,
vandalism,
theft;
natural
earthquakes,
landslides,
floods (heavy rain, river),
storms (sea),
avalanches,
extreme weather conditions,
fires (external to the facility, like nearby forests, grassland, etc.).
describe the major transnational risk and any other relevant risk factors for the risk group, including their likelihood and impact as well as the interaction and correlation of risks among Member States, as appropriate;
describe the criteria used to determine whether a system is exposed to high/unacceptable risks;
set a list of relevant risk scenarios in accordance with the sources of risks and describe how the selection was made;
indicate the extent to which scenarios prepared by ENTSOG have been considered.
Analyse the set of relevant risk scenarios identified under point 3. In the simulation of risk scenarios include the existing security of gas supply measures, such as, the infrastructure standard calculated using the N – 1 formula as set out in point 2 of Annex II, if appropriate, and the gas supply standard. Per risk scenario:
describe in detail the risk scenario, including all assumptions and, if applicable, the underlying methodologies for their calculation;
describe in detail the results of the simulation carried out, including a quantification of the impact (e.g. volumes of unserved gas, the socioeconomic impact, the impact on district heating, the impact on electricity generation).
Describe the main results of the common risk assessment, including the identification of risk scenarios that require further action.
Name of the competent authority responsible for the preparation of the present risk assessment(5).
the main gas consumption figures(7): annual final gas consumption (bcm and MWh) and breakdown per type of customers(8), peak demand (total and breakdown per category of consumer in mcm/d);
a description of the functioning of the gas system(s) in the relevant risk groups: main flows (entry/exit/transit), entry/exit point's infrastructure capacity to and out of the risk groups' region(s) and per Member State, including utilisation rate, LNG facilities (maximal daily capacity, utilisation rate and access regime), etc.;
a breakdown, to the extent possible, of percentage gas import sources per country of origin(9);
a description of the role of storage facilities relevant for the risk group, including cross-border access:
the storage capacity (total and working gas) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production in the risk group(s):
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity and description of how it can cover maximum daily consumption;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity).
the main gas consumption figures: annual final gas consumption (bcm) and breakdown by type of customers, peak demand (mcm/d);
a description of the functioning of the gas system at national level, including infrastructure (to the extent not covered by point 1.1(b)). If applicable, include L-gas system;
the identification of the key infrastructure relevant for the security of gas supply;
a breakdown, to the extent possible, at national level of gas import sources per country of origin;
a description of the role of storage and include:
the storage capacity (total and working) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production and include:
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity).
Describe how the infrastructure standard is complied with, including the main values used for the N – 1 formula and alternative options for its compliance (with directly connected Member States, demand-side measures) and the existing bidirectional capacities, as follows:
N – 1 formula
the identification of the single largest gas infrastructure;
the calculation of the N – 1 formula at national level;
a description of the values used for all elements in the N – 1 formula, including intermediate values used for their calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
an indication of the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations);
an explanation of the results of the calculation of the N – 1 formula considering the level of storages at 30 % and 100 % of the maximum working volume;
an explanation of the main results of the simulation of the N – 1 formula using a hydraulic model;
if so decided by the Member State, a calculation of the N – 1 formula using demand-side measures:
calculation of the N – 1 formula in accordance with point 2 of Annex II,
description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (if different to the figures described under point 2(a)(iii)),
indicate the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
explain the market-based demand-side measures adopted/to be adopted to compensate a disruption of gas supply and its expected impact (Deff);
if so agreed with the competent authorities of the relevant risk group(s) or with directly connected Member States, joint calculation(s) of the N – 1 formula:
calculation of the N – 1 formula in accordance with point 5 of Annex II,
description of the values used for all elements in the N – 1 formula, including intermediate values used for their calculation (if different to the figures described under point 2(a)(iii)),
indicate the methodologies and assumptions used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
explain the agreed arrangements to ensure compliance with the N – 1 formula;
bi-directional capacity
indicate the interconnection points equipped with bidirectional capacity and the maximal capacity of bi-directional flows;
indicate the arrangements governing the use of the reverse flow capacity (e.g. interruptible capacity);
indicate interconnection points where an exemption has been granted in accordance with Article 5(4), the duration of the exemption and the grounds on which it was granted.
Describe the risk factors which could have negative impact on the security of gas supply in the Member State, their likelihood and consequences.
Non-exhaustive list of types of risk factors that have to be included in the assessment only if applicable according to the competent authority:
political
gas disruption from third countries because of different reasons,
political unrest (either in country of origin or in transit country),
war/civil war (either in country of origin or in transit country),
terrorism;
technological
explosion/fires,
fires (internal to a given facility),
leakages,
lack of adequate maintenance,
equipment malfunction (failure to start, failure during working time, etc.),
lack of electricity (or other energy source),
ICT failure (hardware or software failure, internet, SCADA problems, etc.),
cyber-attack,
impact due to excavation works (digging, piling), ground works, etc.;
commercial/market/financial
agreements with third-country suppliers,
commercial dispute,
control of infrastructure relevant for the security of gas supply by third-country entities, which may imply, among others, risks of underinvestment, undermining diversification or non-respect of Union law,
price volatility,
underinvestment,
sudden, unexpected peak demand,
other risks which could lead to structural underperformance;
social
strikes (in different related sectors, such as the gas sector, ports, transport, etc.),
sabotage,
vandalism,
theft;
natural
earthquakes,
landslides,
floods (heavy rain, river),
storms (sea),
avalanches,
extreme weather conditions,
fires (external to the facility, like nearby forests, grassland, etc.).
identify the relevant risk factors for the Member State, including their likelihood and impact;
describe the criteria used to determine whether a system is exposed to high/unacceptable risks;
set a list of relevant risk scenarios in accordance with the risk factors and their likelihood and describe how the selection was made.
Analyse the set of relevant risk scenarios identified under point 3. In the simulation of risk scenarios include the existing security of gas supply measures, such as the infrastructure standard calculated using the N – 1 formula as set out in point 2 of Annex II, and the gas supply standard. Per risk scenario:
describe in detail the risk scenario, including all assumptions and, if applicable, the underlying methodologies for their calculation;
describe in detail the results of the simulation carried out, including a quantification of the impact (e.g. volumes of unserved gas, the socioeconomic impact, the impact on district heating, the impact on electricity generation).
Describe the main results of the common risk assessment the Member States has been involved in, including the identification of risk scenarios that require further action.
Member States in the risk group
Name of the competent authority responsible for the preparation of the plan(10)
the main gas consumption figures(12): annual final gas consumption (bcm) and breakdown per type of customers(13), peak demand (total and breakdown per category of consumer in mcm/d);
a description of the functioning of the gas system in the risk groups: main flows (entry/exit/transit), entry/exit point's infrastructure capacity to and out of the risk group's region(s) and per Member State, including utilisation rate, LNG facilities (maximal daily capacity, utilisation rate and access regime), etc.;
a breakdown, to the extent possible, of gas import sources per country of origin(14);
a description of the role of storage facilities relevant for the region, including cross-border access:
the storage capacity (total and working gas) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production in the region:
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity);
a description of the role of energy efficiency measures and their effect on annual final gas consumption.
the main gas consumption figures: annual final gas consumption (bcm) and breakdown by type of customers, peak demand (mcm/d);
a description of the functioning of the gas system at national level, including infrastructure (to the extent not covered by point 1.1(b));
the identification of the key infrastructure relevant for the security of supply;
a breakdown, to the extent possible, at national level of gas import sources per country of origin;
a description of the role of storage in the Member State and include:
the storage capacity (total and working) compared to heating season demand;
the maximal daily withdrawal capacity at different filling levels (ideally with full storages and end-of-season levels);
a description of the role of domestic production and include:
the volume of production with regard to the annual final gas consumption;
the maximal daily production capacity;
a description of the role of gas in the electricity production (e.g. importance, role as a back-up for renewables), including gas-fired generating capacity (total (MWe) and as percentage of the total generating capacity) and cogeneration (total (MWe) and as percentage of the total generating capacity);
a description of the role of energy efficiency measures and their effect on annual final gas consumption.
Describe briefly the results of the relevant common and national risk assessment carried out in accordance with Article 7, including:
a list of the scenarios assessed and a brief description of the assumptions applied for each one as well as the risks/shortcomings identified;
the main conclusions of the risk assessment.
Describe how the infrastructure standard is complied with, including the main values used for the N – 1 formula and alternative options for its compliance (with neighbouring Member States, demand-side measures) and the existing bidirectional capacities, as follows:
the identification of the single largest gas infrastructure of common interest for the region;
the calculation of the N – 1 formula at regional level;
a description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
an indication of the methodologies and assumptions used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations).
N – 1 formula
the identification of the single largest gas infrastructure;
the calculation of the N – 1 formula at national level;
a description of the values used for all elements in the N – 1 formula, including intermediate values used for the calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
an indication of the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations);
if so decided by the Member State, calculation of the N – 1 formula using demand-side measures:
the calculation of the N – 1 formula in accordance with point 2 of Annex II,
a description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (if different to the figures described under point 3(a)(iii) of this Annex),
an indication of the methodologies used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
an explanation of the market-based demand-side measures adopted/to be adopted to compensate a disruption of gas supply and its expected impact (Deff);
if so agreed with the competent authorities of the relevant risk group(s) or with the directly connected Member States, joint calculation(s) of the N – 1 formula:
the calculation of the N – 1 formula in accordance with point 5 of Annex II,
a description of the values used for all elements in the N – 1 formula, including intermediate values used for the calculation (if different to the figures described under point 3(a)(iii) of this Annex),
an indication of the methodologies and assumptions used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations),
an explanation of the agreed arrangements to ensure compliance with the N – 1 formula;
bi-directional capacity
indicate the interconnection points equipped with bidirectional capacity and the maximal capacity of bi-directional flows;
indicate the arrangements governing the use of the reverse flow capacity (e.g. interruptible capacity);
indicate interconnection points where an exemption has been granted in accordance with Article 5(4), the duration of the exemption and the grounds on which it was granted.
Describe the measures adopted in order to comply with the supply standard as well as with any increased supply standard or additional obligation imposed for reasons of security of gas supply:
definition of protected customers applied, including categories of customers covered and their annual gas consumption (per category, net value and percentage of the national annual final gas consumption);
gas volumes needed to comply with the supply standard in accordance with the scenarios described in the first subparagraph of Article 6(1);
capacity needed to comply with the supply standard in accordance with the scenarios described in the first subparagraph of Article 6(1);
measure(s) in place to comply with the supply standard:
a description of the measure(s);
addressees;
where it exists, describe any ex ante monitoring system for the compliance with the supply standard;
sanctions regime, if applicable;
describe, per measure:
the economic impact, effectiveness and efficiency of the measure,
the impact of the measure on the environment,
impact of the measures on consumer,
where non-market-based measures are applied (per measure):
justify why the measure is necessary (i.e. why security of supply cannot be achieved via market-based measures alone),
justify why the measure is proportionate (i.e. why the non-market-based measure is the least restrictive means to achieve the intended effect),
provide an analysis of the impact of such measure:
on other Member State's security of supply;
on the national market;
on the internal market;
where measures introduced on or after 1 November 2017, please provide a short summary of the impact assessment or a link to the public impact assessment of the measure(s) carried out in accordance with Article 9(4);
if applicable, describe any increased supply standard or additional obligation imposed for reasons of security of gas supply:
a description of the measure(s);
the mechanism to reduce it to usual values in a spirit of solidarity and in accordance with Article 13;
if applicable, describe any new increased supply standard or additional obligation imposed for reasons of security of gas supply adopted on or after 1 November 2017;
addressees;
affected gas volumes and capacities;
indicate how that measure complies with the conditions laid down in Article 6(2).
Describe the preventive measures in place or to be adopted:
describe each of the preventive measures adopted per identified risk in accordance with the risk assessment, including a description of:
their national or regional dimension;
their economic impact, effectiveness and efficiency;
their impact on customers.
Where appropriate, include:
measures to enhance interconnections between neighbouring Member States,
measures to diversify gas routes and sources of supply,
measures to protect key infrastructure relevant for the security of supply in relation to control by third-country entities (including, where relevant, general or sector-specific investment screening laws, special rights for certain shareholders, etc.);
describe other measures adopted for reasons other than the risk assessment but with a positive impact for the security of supply of the relevant risk group(s) Member State.
where non-market-based measures are applied (per measure):
justify why the measure is necessary (i.e. why the security of supply cannot be achieved via market-based measures alone);
justify why the measure is proportionate (i.e. why the non-market-based measure is the least restrictive means to achieve the intended effect);
provide an analysis of the impact of such measure:
justify why the measure is necessary (i.e. why the security of supply cannot be achieved via market-based measures alone),
justify why the measure is proportionate (i.e. why the non-market-based measure is the least restrictive means to achieve the intended effect),
provide an analysis of the impact of such measure:
on other Member State's security of supply;
on the national market;
on the internal market;
explain the extent to which efficiency measures, including on the demand side, have been considered to increase the security of supply;
explain the extent to which renewable energy sources have been considered to increase the security of supply.
Describe other measures and obligations that have been imposed on natural gas undertakings and other relevant bodies likely to have an impact on the security of gas supply, such as obligations for the safe operation of the system, including who would be affected by that obligation as well as the gas volumes covered. Explain precisely when and how those measures would apply.
describe future infrastructure projects, including Projects of Common Interests in the relevant risk groups, including an estimated timing for their deployment, capacities and estimated impact on the security of gas supply in the risk group;
indicate how the infrastructure projects take into account the Union-wide TYNDP elaborated by ENTSOG pursuant to Article 8(10) of Regulation (EC) No 715/2009.
Indicate the existing public service obligations related to the security of supply and briefly describe them (use annexes for more detailed information). Explain clearly who has to comply with such obligations and how. If applicable, describe how and when those public service obligations would be triggered.
In accordance with Article 8(2) of this Regulation, describe the mechanism used for and the results of the consultations carried out, for the development of the plan as well as the emergency plan, with:
gas undertakings;
relevant organisations representing the interests of households;
relevant organisations representing the interests of industrial gas customers, including electricity producers;
national regulatory authority.
Indicate any national circumstances and measures relevant for the security of supply and not covered in the previous sections of the plan.
Indicate how the possible comments received following the consultation described in Article 8(2) have been considered.
the identification of the single largest gas infrastructure of common interest for the risk group;
the calculation of the N – 1 formula at the level of the risk group;
a description of the values used for all elements in the N – 1 formula, including intermediate figures used for the calculation (e.g. for EPm indicate the capacity of all entry points considered under this parameter);
an indication of the methodologies and assumptions used, if any, for the calculation of parameters in the N – 1 formula (e.g. Dmax) (use annexes for detailed explanations).
Describe the mechanisms used for the cooperation among the Member States in the relevant risk groups, including for developing cross-border measures in the preventive action plan and the emergency plan.
Describe the mechanisms used for the cooperation with other Member States in the design and adoption of the provisions necessary for the application of Article 13.
Describe the preventive measures in place or to be adopted in the risk group or as a result of regional agreements:
describe each of the preventive measures adopted per identified risk in accordance with the risk assessment, including a description of:
their impact in the Member States of the risk group;
their economic impact, effectiveness and efficiency;
their impact on the environment;
their impact on customers.
Where appropriate, include:
measures to enhance interconnections between neighbouring Member States,
measures to diversify gas routes and sources of supply,
measures to protect key infrastructure relevant for the security of supply in relation to control by third-country entities (including, where relevant, general or sector-specific investment screening laws, special rights for certain shareholders, etc.);
describe other measures adopted for reasons other than the risk assessment but with a positive impact for the security of supply of the risk group.
where non-market-based measures are applied (per measure):
justify why the measure is necessary (i.e. why the security of supply cannot be achieved via market-based measures alone);
justify why the measure is proportionate (i.e. why the non-market-based measure is the least restrictive means to achieve the intended effect);
provide an analysis of the impact of such a measure:
justify why the measure is necessary (i.e. why the security of supply cannot be achieved via market-based measures alone),
justify why the measure is proportionate (i.e. why the non-market-based measure is the least restrictive means to achieve the intended effect),
provide an analysis of the impact of such a measure:
on other Member State's security of supply;
on the national market;
on the internal market;
explain the extent to which efficiency measures, including on the demand side, have been considered to increase the security of supply;
explain the extent to which renewable energy sources have been considered to increase the security of supply.
Name of the competent authority responsible for the preparation of the present plan(15)
indicate the body responsible for the declaration of each crisis level and the procedures to follow in each case for such declarations;
where they exist, include here indicators or parameters used to consider whether an event may result in a significant deterioration of the supply situation and to decide upon the declaration of a certain crisis level.
Describe the measures to be applied at this stage, indicating, per measure:
a brief description of the measure and main actors involved;
describe the procedure to follow, if applicable;
indicate the expected contribution of the measure to cope with the impact of any event or prepare ahead of its appearance;
describe the flows of information among the actors involved.
describe the measures to be applied at this stage, indicating, per measure:
a brief description of the measure and main actors involved;
describe the procedure to follow, if applicable;
indicate the expected contribution of the measure to cope with the situation at alert level;
describe the flows of information among the actors involved;
describe the reporting obligations imposed on natural gas undertakings at alert level.
establish a list of predefined actions on the supply and demand side to make gas available in the event of an emergency, including commercial agreements between the parties involved in such actions and the compensation mechanisms for natural gas undertakings where appropriate;
describe the market-based measures to be applied at this stage, indicating, per measure:
a brief description of the measure and main actors involved;
describe the procedure to follow;
indicate the expected contribution of the measure to mitigate the situation at emergency level;
describe the flows of information among the actors involved;
describe the non-market-based measures planned or to be implemented for the emergency level, indicating, per measure:
a brief description of the measure and main actors involved;
provide an assessment of the necessity of such measure in order to cope with a crisis, including the degree of its use;
describe in detail the procedure to implement the measure (e.g. what would trigger the introduction of this measure, who would take the decision);
indicate the expected contribution of the measure to mitigate the situation at emergency level as a complement to market-based measures;
assess other effects of the measure;
justify the compliance of the measure with the conditions laid down in Article 11(6);
describe the flows of information among the actors involved;
describe reporting obligations imposed on natural gas undertakings.
district heating
briefly indicate the likely impact of a disruption of gas supply in the district heating sector;
indicate measures and actions to be taken to mitigate the potential impact of a disruption of gas supply on district heating. Alternatively, indicate why the adoption of specific measures is not appropriate;
supply of electricity generated from gas
briefly indicate the likely impact of a disruption of gas supply in the electricity sector;
indicate measures and actions to be taken to mitigate the potential impact of a disruption of gas supply on the electricity sector. Alternatively, indicate why the adoption of specific measures is not appropriate;
indicate the mechanisms/existing provisions to ensure appropriate coordination, including exchange of information, between main actors in the gas and electricity sectors, in particular transmission system operators at different crisis levels.
Indicate who the crisis manager is and define its role.
per crisis level, define the roles and responsibilities, including interactions with the competent authorities and, where appropriate, with the national regulatory authority, of:
natural gas undertakings;
industrial customers;
relevant electricity producers;
per crisis level, define the role and responsibilities of the competent authorities and the bodies to which tasks have been delegated.
Describe measures in place to prevent to the extent possible and without endangering the safe and reliable operation of the gas system or creating unsafe situations, the consumption by customers who are not protected customers of gas supply intended for protected customers during an emergency. Indicate the nature of the measure (administrative, technical, etc.), main actors and the procedures to follow.
indicate the calendar for the real time response simulations of emergency situations;
indicate actors involved, procedures and concrete high and medium impact scenarios simulated.
For the updates of the emergency plan: describe briefly the tests carried out since the last emergency plan was presented and the main results. Indicate which measures have been adopted as a result of those tests.
Describe the measures to be applied at this stage, indicating, per measure:
brief description of the measure and main actors involved;
describe the procedure to follow, if applicable;
indicate the expected contribution of the measure to cope with the impact of any event or prepare ahead of its appearance;
describe the flows of information among the actors involved.
describe the measures to be applied at this stage, indicating, per measure:
brief description of the measure and main actors involved;
describe the procedure to follow, if applicable;
indicate the expected contribution of the measure to cope with the impact of any event or prepare ahead of its appearance;
describe the flows of information among the actors involved;
describe the reporting obligations imposed on natural gas undertakings at alert. level.
establish a list of predefined actions on the supply and demand side to make gas available in the event of an emergency, including commercial agreements between the parties involved in such actions and the compensation mechanisms for natural gas undertakings where appropriate;
describe the market-based measures to be applied at this stage, indicating, per measure:
brief description of the measure and main actors involved;
describe the procedure to follow;
indicate the expected contribution of the measure to mitigate the situation at emergency level;
describe the flows of information among the actors involved;
describe the non-market-based measures planned or to be implemented for the emergency level, indicating, per measure:
brief description of the measure and main actors involved;
provide an assessment of the necessity of such measure in order to cope with a crisis, including the degree of its use;
describe in detail the procedure to implement the measure (e.g. what would trigger the introduction of the measure, who would take the decision);
indicate the expected contribution of the measure to mitigate the situation at emergency level as a complement to market-based measures;
assess other effects of the measure;
justify the compliance of the measure with the conditions established in Article 11(6);
describe the flows of information among the actors involved;
describe reporting obligations imposed on natural gas undertakings.
describe the mechanisms in place to cooperate within each of the relevant risk groups and to ensure appropriate coordination for each crisis level. Describe, to the extent they exist and have not been covered in point 2, the decision-making procedures for appropriate reaction at regional level at each crisis level;
describe the mechanisms in place to cooperate with other Member States out of the risk groups and to coordinate actions for each crisis level.
describe the agreed arrangements among directly connected Member States to ensure the application of the solidarity principle referred to in Article 13;
if applicable, describe the agreed arrangements between Members States that are connected to each other via a third country to ensure the application of the solidarity principle referred to in Article 13.
In developing the preventive action plan and the emergency plan the competent authority shall consider the contribution of the following indicative and non-exhaustive list of measures only in the event of an emergency:
supply-side measures:
use of strategic gas storage,
enforced use of stocks of alternative fuels (e.g. in accordance with Council Directive 2009/119/EC(17)),
enforced use of electricity generated from sources other than gas,
enforced increase of gas production levels,
enforced storage withdrawal;
demand-side measures:
various steps of compulsory demand reduction including:
enforced fuel switching,
enforced utilisation of interruptible contracts, where not fully utilised as part of market-based measures,
enforced firm load shedding.
Regulation (EU) No 994/2010 | This Regulation |
---|---|
Article 1 | Article 1 |
Article 2 | Article 2 |
Article 3 | Article 3 |
Article 6 | Article 5 |
Article 8 | Article 6 |
Article 9 | Article 7 |
Article 4 | Article 8 |
Article 5 | Article 9 |
Article 10 | Article 10 |
Article 10 | Article 11 |
Article 11 | Article 12 |
— | Article 13 |
Article 13 | Article 14 |
Article 12 | Article 4 |
— | Article 15 |
— | Article 16 |
Article 14 | Article 17 |
— | Article 18 |
— | Article 19 |
Article 16 | Article 20 |
Article 15 | Article 21 |
Article 17 | Article 22 |
Annex I | Annex II |
Article 7 | Annex III |
Annex IV | Annex I |
— | Annex IV |
— | Annex V |
— | Annex VI |
— | Annex VII |
Annex II | — |
Annex III | Annex VIII |
— | Annex IX |
Where this task has been delegated by any competent authority, indicate the name of the body/(ies) responsible for the preparation of the present risk assessment on its behalf.
For the first assessment, include data from the last two years. For updates, include data from the last four years.
Including industrial customers, electricity generation, district heating, residential and services and other (please specify the type of customers included here). Indicate as well the volume of consumption of protected customers.
Describe the methodology applied.
Where this task has been delegated by the competent authority, indicate the name of the body/(ies) responsible for the preparation of the present risk assessment on its behalf.
For the sake of simplicity, present the information at the highest level of the risk groups if possible and merge details as necessary.
For the first assessment, include data from the last two years. For updates, include data from the last four years.
Including industrial customers, electricity generation, district heating, residential and services and other (specify the type of customers included here). Indicate as well the volume of consumption of protected customers.
Describe the methodology applied.
Where this task has been delegated by any competent authority, indicate the name of the body/(ies) responsible for the preparation of this plan on its behalf.
For the sake of simplicity, present the information at the highest level of the risk groups if possible and merge details as necessary
For the first plan, include data from the last two years. For updates, include data from the last four years.
Including industrial customers, electricity generation, district heating, residential and services and other (please specify the type of customers included here).
Describe the methodology applied.
Where this task has been delegated by any competent authority, please indicate the name of the body/(ies) responsible for the preparation of this plan on its behalf.
Include regional and national measures.
Council Directive 2009/119/EC of 14 September 2009 imposing an obligation on Member States to maintain minimum stocks of crude oil and/or petroleum products (OJ L 265, 9.10.2009, p. 9).
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys