- Deddfwriaeth Ddrafft
This is a draft item of legislation. This draft has since been made as a Scottish Statutory Instrument: The Waste Management Licensing (Scotland) Regulations 2011 No. 228
10.—(1) Subject to sub paragraph (4)—
(a)the reception and treatment within the curtilage of a water treatment works of any of the wastes listed in Table 4 if the total quantity of waste which is treated in any period of 12 months does not exceed 100,000 cubic metres; and
(b)the secure storage within the curtilage of a water treatment works of waste intended to be treated in reliance on the exemption conferred by paragraph (a).
(2) Subject to the following provisions of this paragraph—
(a)any recovery operation carried on within the curtilage of a sewage treatment works of any of the wastes listed in Table 4;
(b)the secure storage within the curtilage of a sewage treatment works of waste intended to be submitted to the activity mentioned in paragraph (a).
Codes (1) | Types of waste |
---|---|
(1) Codes referred to in the European Waste Catalogue. | |
Waste from waste water treatment plants not otherwise specified (19 08) | |
19 08 01 | Screenings |
19 08 05 | Sludges from treatment of urban waste water |
Wastes from the preparation of water intended for human consumption or water for industrial use (19 09) | |
19 09 02 | Sludges from water clarification |
19 09 03 | Sludges from decarbonation |
19 09 06 | Solutions and sludges from regeneration of ion exchangers |
Other municipal wastes (20 03) | |
20 03 04 | Septic tank sludge |
20 03 99 | Municipal waste not otherwise specified |
(3) The total quantity of waste brought to a sewage treatment works for the purposes of a recovery operation in reliance upon the exemption covered by sub paragraph (2) in any period of 12 months shall not exceed 100,000 cubic metres.
(4) The area where a treatment or recovery operation takes place shall have an impermeable pavement capable of containing any spillage of waste received and connected to a drainage system with impermeable components which does not leak and which will ensure that—
(a)no liquid will run off the pavement otherwise than via that system; and
(b)except where they may be lawfully discharged, all liquids entering the system are collected in a sealed sump.
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Mae Nodyn Gweithredol Drafft yn nodi datganiad byr o ddiben Offeryn Statudol Drafft yr Alban ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Ei nod yw gwneud yr Offeryn Statudol Drafft yr Alban yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol ac maent yn cyd-fynd ag unrhyw Offeryn Statudol yr Alban neu Offeryn Statudol Drafft yr Alban a gyflwynwyd yn fanwl gerbron Senedd yr Alban o Orffennaf 2005 ymlaen.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys