PART II PRINCIPLES OF CONSTRUCTION AND MARKING OF MEASURING EQUIPMENT
7.Measuring equipment to which these Regulations apply shall consist of...
8.Regulations 9 to 12 below apply to contents gauging systems....
9.(1) Every contents gauging system shall be made in accordance...
10.The minimum delivery and the liquid fuel which a contents...
11.Every contents gauging system shall be fitted with a sales...
12.Every contents gauging system shall incorporate a ticket printing mechanism...
13.Regulations 14 to 17 below apply to meter measuring systems....
14.(1) Every meter measuring system shall be made in accordance...
15.The minimum delivery, the liquid fuel which a meter measuring...
16.Every meter measuring system shall be fitted with a sales...
17.Every meter measuring system shall incorporate a ticket printing mechanism...
18.Regulations 19 to 35 below apply to dipstick measuring systems....
19.Every dipstick shall relate to, and be used for measuring...
21.The cross-sectional area of a dipstick shall not exceed 5...
22.Every dipstick blade made from glass-reinforced plastic or other materials...
25.The related compartment number shall be marked on the graduated...
26.The related tank number shall be marked at the crosspiece...
27.Every dipstick shall have a line marked on its graduated...
28.Every dipstick used to measure deliveries of less than a...
29.(1) Every compartment shall be fitted with a fixed vertical...
30.(1) In the case of compartments used for petroleum spirit...
34.Where more than one compartment discharges through a common outlet...
35.(1) Tanks and compartments shall be so constructed that the...
37.Regulations 38 to 42 below apply to contents gauging systems....
38.(1) No contents gauging system shall be tested unless it...
39.For the purposes of the performance by an inspector of...
41.(1) An inspector may open any locked or sealed container...
42.An inspector shall securely re-fasten any container opened under Regulation...
43.Regulations 44 to 50 below apply to meter measuring systems....
44.(1) No meter measuring system shall be tested unless it...
45.For the purposes of the performance by an inspector of...
48.(1) An inspector may open any locked or sealed container...
49.An inspector shall securely re-fasten any container opened under Regulation...
50.(1) An inspector shall not test a meter measuring system...
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys