- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
Unit 1 | Location and avoidance of underground apparatus. |
Unit 2 | Signing, lighting and guarding. |
Unit 3 | Excavation in the highway. |
Unit 4 | Reinstatement and compaction of backfill materials. |
Unit 5 | Reinstatement of sub-base and roadbase in non-bituminous materials. |
Unit 6 | Reinstatement in cold-lay bituminous materials. |
Unit 7 | Reinstatement in hot-lay bituminous materials. |
Unit 8 | Reinstatement of concrete slabs. |
Unit 9 | Reinstatement of modular surfaces and concrete footways. |
Type of Work | Units of Competence Required |
---|---|
1. Excavation in the highway. | Units 1, 2 and 3. |
2. Excavation, backfilling and reinstatement of construction layers with a cold-lay bituminous surface. | Units 1, 2, 3, 4, 5 and 6. |
3. Reinstatement of construction layers in hot-lay and cold-lay bituminous materials. | Units 1, 2, 6 and 7. |
4. Reinstatement of concrete slabs. | Units 1, 2 and 8. |
5. Reinstatement of modular surfaces and concrete footways. | Units 1, 2 and 9. |
Unit 1 | Location and avoidance of underground apparatus. |
Unit 10 | Monitoring signing, lighting and guarding. |
Unit 11 | Monitoring excavation in the highway. |
Unit 12 | Monitoring reinstatement and compaction of backfill materials. |
Unit 13 | Monitoring reinstatement of sub—base and roadbase in non-bituminous materials. |
Unit 14 | Monitoring reinstatement in bituminous materials. |
Unit 15 | Monitoring reinstatement of concrete slabs. |
Unit 16 | Monitoring reinstatement of modular surfaces and concrete footways. |
Type of Supervisory Work | Units of Competence Required |
---|---|
1. Monitoring excavation in the highway. | Units 1, 10 and 11. |
2. Monitoring excavation, backfilling and reinstatement of construction layers with bituminous materials. | Units 1, 10, 11, 12, 13 and 14. |
3. Monitoring reinstatement of construction layers in bituminous materials. | Units 1, 10 and 14. |
4. Monitoring reinstatement of concrete slabs. | Units 1, 10 and 15. |
5. Monitoring reinstatement of modular surfaces and concrete footways. | Units 1, 10 and 16. |
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: