Chwilio Deddfwriaeth

The Town and Country Planning (Fees for Applications and Deemed Applications) (Amendment) (No. 2) Regulations 1992

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)

Rhagor o Adnoddau

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

Regulation 3(3)

SCHEDULE 1NEW PART II OF SCHEDULE 1 TO THE 1989 REGULATIONS

SCALE OF FEES

Category of developmentFee payable

I.  Operations

1.  The erection of dwellinghouses (other than development within category 6 below).

(a)Where the application is for outline planning permission, £120 for each 0.1 hectare of the site area, subject to a maximum of £3,000;

(b)in other cases, £120 for each dwellinghouse to be created by the development, subject to a maximum of £6,000.

2.  The erection of buildings (other than buildings coming within categories 1, 3, 4, 5 or 7).

(a)Where the application is for outline planning permission, £120 for each 0.1 hectare of the site area, subject to a maximum of £3,000;

(b)in other cases—

(i)where no floor space is to be created by the development, £60;

(ii)where the area of gross floor space to be created by the development does not exceed 40 sq metres, £60;

(iii)where the area of gross floor space to be created by the development exceeds 40 sq metres but does not exceed 75 sq metres, £120; and

(iv)where the area of gross floor space to be created by the development exceeds 75 sq metres, £120 for each 75 sq metres, subject to a maximum of £6,000.

3.  The erection, on land used for the purposes of agriculture, of buildings to be used for agricultural purposes (other than buildings coming within category 4).

(a)Where the application is for outline planning permission, £120 for each 0.1 hectare of the site area, subject to a maximum of £3,000;

(b)in other cases—

(i)where the area of gross floor space to be created by the development does not exceed 465 sq metres, £22;

(ii)where the area of gross floor space to be created by the development exceeds 465 sq metres but does not exceed 540 sq metres, £120;

(iii)where the area of gross floor space to be created by the development exceeds 540 sq metres, £120 for the first 540 sq metres and £120 for each 75 sq metres in excess of that figure, subject to a maximum of £6,000.

4.  The erection of glasshouses on land used for the purposes of agriculture.

(a)Where the area of gross floor space to be created by the development does not exceed 465 sq metres, £22;

(b)where the area of gross floor space to be created by the development exceeds 465 sq metres, £715.

5.  The erection, alteration or replacement of plant or machinery.

£120 for each 0.1 hectare of the site area, subject to a maximum of £6,000.

6.  The enlargement, improvement or other alteration of existing dwellinghouses.

(a)Where the application relates to one dwellinghouse, £60;

(b)where the application relates to 2 or more dwellinghouses, £120.

7.—(a) The carrying out of operations (including the erection of a building) within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such, or the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or

(b)the construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.

£60

8.  The carrying out of any operations connected with exploratory drilling for oil or natural gas.

£120 for each 0.1 hectare of the site area, subject to a maximum of £9,000.

9.  The carrying out of any operations not coming within any of the above categories.

£60 for each 0.1 hectare of the site area, subject to a maximum of—

(a)

in the case of operations for the winning and working of minerals, £9,000;

(b)

in other cases, £600.

II.  Uses of Land

10.  The change of use of a building to use as one or more separate dwellinghouses.

(a)Where the change is from a previous use as a single dwellinghouse to use as two or more single dwellinghouses, £120 for each additional dwellinghouse to be created by the development, subject to a maximum of £6,000;

(b)in other cases, £120 for each dwellinghouse to be created by the development, subject to a maximum of £6,000.

11.—(a) The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land; or

(b)the use of land for the storage of minerals in the open.

£60 for each 0.1 hectare of the site area, subject to a maximum of £9,000.

12.  The making of a material change in the use of a building or land (other than a material change of use coming within any of the above categories).

£120.

Regulation 3(4)

SCHEDULE 2NEW SCHEDULE 2 TO THE 1989 REGULATIONS

SCALE OF FEES IN RESPECT OF APPLICATIONS FOR CONSENT TO DISPLAY ADVERTISEMENTS

Category of advertisementFee payable

1.  Advertisements displayed on business premises, on the forecourt of business premises or on other land within the curtilage of business premises, wholly with reference to all or any of the following matters—

(a)the nature of the business or other activity carried on on the premises;

(b)the goods sold or the services provided on the premises; or

(c)the name and qualifications of the person carrying on such business or activity or supplying such goods or services.

£33.

2.  Advertisements for the purposes of directing members of the public to, or otherwise drawing attention to the existence of, business premises which are in the same locality as the site on which the advertisement is to be displayed but which are not visible from that site.

£33.

3.  All other advertisements.

£120.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill