Regulation 24

SCHEDULE 1RENDERING REQUIREMENTS

PART IREQUIREMENTS TO BE MET WHERE SPECIFIED RISK MATERIALS IS RENDERED

1.  The premises shall be adequately separated from the public highway and other premises. Notwithstanding this, they may occupy the same site as premises where animal products which are not specified risk material are rendered provided that specified risk material is stored, handled and processed separately from other animal material and by means of equipment used only for specified risk material.

2.  Unauthorised persons and animals shall not be permitted to have access to the premises.

3.  The premises or part of the premises used to process specified risk material must have a clean and an unclean section specified by the occupier, adequately separated. The unclean section must have a covered place to receive and store the specified risk material for processing and must be constructed in such a way that it is easy to clean and disinfect. Floors must be laid in such a way as to facilitate the draining of liquids. The premises must have adequate lavatories, changing rooms and washbasins for staff.

4.  The premises shall have sufficient capacity of hot water and steam production to render specified risk material in accordance with the method in Part II of this Schedule chosen by the operator.

5.  The equipment used to render specified risk material shall include—

(a)measuring equipment to check temperature and, if necessary, pressure at critical points;

(b)recording devices to record continuously the results of measurements; and

(c)an adequate safety system to prevent insufficient heating.

6.  To prevent recontamination of processed specified risk material by incoming specified risk material, there must be clear separation between the area of the premises where the incoming specified risk material is unloaded and rendered and the areas set aside for further processing of the heated specified risk material and the storage of finished specified risk material products.

7.  The premises must have adequate facilities for cleaning and disinfecting the containers or receptacles in which unprocessed specified risk material is received and the vehicles in which it is transported.

8.  Adequate facilities must be provided for disinfecting the wheels, immediately before their departure, of vehicles transporting specified risk material or leaving the unclean section of the premises.

PART IIMETHODS OF RENDERING

METHOD 1Natural Fat Batch Atmospheric (150 mm Particle Size)

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 150 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Cooking

3.  Crushed material shall then be heated in a steam jacketed vessel to remove the inherent moisture at atmospheric pressure. The times and temperatures achieved during the cooking process shall be recorded in a permanent form. During the course of cooking, the material shall be maintained at a temperature in excess of 100°C for at least 125 minutes, a temperature in excess of 110°C for at least 120 minutes and a temperature in excess of 120°C for at least 50 minutes. Material may be cooked so that two or more time/temperature requirements are carried out at the same time.

Separation and storage of final products

4.  After cooking, the material shall be discharged from the cookers and separated into its tallow and protein components. Protein and tallow shall be stored separately.

Records

5.  All records shall be kept for one year.

METHOD 2Natural Fat Batch Atmospheric (30 mm Particle Size)

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 30 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Cooking

3.  Crushed material shall then be heated in a steam jacketed vessel to remove the inherent moisture at atmospheric pressure. The times and temperatures achieved during the cooking process must be recorded in permanent form. During the course of cooking, the material must be maintained at a temperature in excess of 100°C for at least 95 minutes, a temperature in excess of 110°C for at least 55 minutes and a temperature in excess of 120°C for at least 13 minutes. Material may be cooked so that two or more time/temperature requirements are carried out at the same time.

Separation and storage of final products

4.  After cooking, the material shall be discharged from the cookers and separated into its tallow and protein components. Protein and tallow shall be stored separately.

Records

5.  All records shall be kept for one year.

METHOD 3Added Fat Batch Atmospheric (30 mm Particle Size)

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 30 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Cooking

3.  Crushed material shall then be heated with added tallow in a steam jacketed vessel to remove the inherent moisture at atmospheric pressure. The times and temperatures achieved during the cooking process must be recorded on a permanent recording system. During the course of cooking, the material shall be maintained at a temperature in excess of 100°C for at least 16 minutes, a temperature in excess of 110°C for at least 13 minutes, at a temperature in excess of 120°C for at least 8 minutes and at a temperature in excess of 130°C for at least 3 minutes. Material may be cooked so that two or more time/temperature requirements are carried out at the same time.

Separation and storage of final products

4.  After cooking, the material shall be discharged from the cookers and separated into its tallow and protein components. Protein and tallow shall be stored separately.

Records

5.  All records shall be kept for one year.

METHOD 4Natural Fat Batch (Batch Pressure)

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 50 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Cooking

3.  Crushed material should then be heated in a steam jacketed vessel. After all air in the vessel has been displaced by steam, the vessel shall be sealed and heating continued until the pressure reaches 3 bar and the temperature reaches at least 133°C. This state should be held for at least 20 minutes, after which the pressure should be lowered back to atmospheric pressure. The product should then be dried to remove all of its inherent moisture. The times, temperatures and pressures achieved during the cooking process must be recorded on a permanent recording system.

Separation and storage of final products

4.  After cooking, the material shall be discharged from the cookers and separated into its tallow and protein fractions. Protein and tallow shall be stored separately.

Records

5.  All records shall be kept for one year.

METHOD 5Natural Fat Continuous Atmospheric

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 30 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Cooking

3.  The material shall be passed into a steam heated vessel. Passage of the raw material through the vessel shall be controlled by means of displacement and mechanical restrictions to ensure that the cooked dried material is discharged with all of its residual moisture removed as water vapour. The maximum feed rate for raw material and the minimum discharge temperature will be set for the vessel in the approval for the premises granted under this Order. The material shall be maintained at a temperature in excess of 100°C for at least 95 minutes, a temperature in excess of 110°C for at least 55 minutes and a temperature in excess of 120°C for at least 13 minutes. Material may be cooked so that two or more time/temperature requirements are carried out at the same time. The times and temperatures achieved during the cooking process must be recorded on a permanent recording system.

Separation and storage of final products

4.  After cooking, the material shall be discharged from the cookers and separated into its tallow and protein components. Protein and tallow shall be stored separately.

Records

5.  All records shall be kept for one year.

METHOD 6Added Fat Continuous Atmospheric

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 30 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Cooking

3.  The material shall be passed into a steam heated vessel where a consistent level of hot liquid tallow is maintained by recycling tallow as appropriate. Passage of the raw material through the vessel shall be controlled by means of displacement and mechanical restrictions to ensure that the cooked dried material is discharged with all of its residual moisture removed as water vapour. The maximum feed rate for raw material, the maximum tallow recycle rate, and the minimum discharge temperature will be set for the vessel in the approval for the premises granted under this Order. The material shall be maintained at a temperature in excess of 100°C for at least 16 minutes, a temperature in excess of 110°C for at least 13 minutes, a temperature in excess of 120°C for at least 8 minutes and a temperature in excess of 130°C for at least 3 minutes. Material may be cooked so that two or more time/temperature requirements are carried out at the same time. The times and temperatures achieved during the cooking process must be recorded on a permanent recording system.

Separation and storage of final products

4.  On discharge from the vessel, any surplus tallow not required to maintain the vessel’s operating level shall be removed, and the material separated into its tallow and protein components. Protein and tallow shall be stored separately.

Records

5.  All records shall be kept for one year.

METHOD 7Defatted Continuous Atmospheric

Equipment

1.  The premises shall be equipped with apparatus to crush specified risk material to the appropriate particle size, at least one cooker to cook the specified risk material, sufficient capacity of hot water and steam production to render specified risk material in accordance with this method, and equipment to separate protein from tallow and store those products.

Crushing

2.  The raw material shall be reduced in size by crushing so that the particle size does not exceed 20 mm. Final reduction equipment shall be checked daily and its condition recorded. Any broken equipment shall be repaired without delay to ensure that the final particle size is achieved.

Pre-heating

3.  The crushed material shall then be passed to a pre-heater. Passage of the raw material through the pre-heater shall be controlled by means of displacement and mechanical restrictions to ensure that the cooked material is discharged at a temperature of at least 80°C and in a form in which water and tallow can be removed from the protein residue.

Pressing

4.  The material discharged from the pre-heater must be passed through a screw press so adjusted that all water and tallow are removed from the protein residue.

Drying

5.  The protein residue shall be passed into a steam heated vessel. Passage of the protein residue through the vessel shall be controlled by means of displacement and mechanical restrictions to ensure that the cooked dried protein is discharged with all of its residual moisture removed as water vapour. A maximum feed rate for protein residue and a minimum discharge temperature will be set for the vessel by an officer of the Minister. The material shall be maintained at a temperature in excess of 80°C for at least 120 minutes and a temperature in excess of 100°C for at least 60 minutes. Material may be cooked so that both time/temperature requirements are carried out at the same time. The times and temperatures achieved during the cooking process must be recorded on a permanent recording system.

Storage of final products

6.  Protein and tallow shall be stored separately.

Records

7.  All records shall be kept for one year.

Regulation 2(3)

SCHEDULE 2APPLICATION OF THE ORDER TO SCHEME ANIMALS

Provision of the RegulationsExtent to which provision applies to scheme animals
Regulation 5(3)(b)Not applicable
Regulation 8Not applicable
Regulation 9Not applicable
Regulation 10(3)Subject to the modification that the tongue may not be removed
Regulation 10(4)Subject to the modification that from the point at which specified bovine material derived from a scheme animal is removed from the slaughterhouse, it may come into contact with any other animal material from such an animal
Regulation 11Not applicable
Regulation 21(1)(e)Not applicable
Regulation 24(4)Subject to the modification that specified risk material may come into contact with any animal material from a scheme animal
Regulation 24(6)Subject to the modification that equipment used for processing specified risk material may be used for processing any part of a scheme animal
Regulation 24(9)Subject to the modification that protein and tallow produced from specified risk material of scheme animals shall be disposed of by burning by means which have been licensed under the Environmental Protection Act 1990
Regulation 27(1)Subject to the modification that the impervious container or part of the vehicle (as the case may be) may also contain animal material from scheme animals
Paragraph 1 of Schedule 1Subject to the modification that specified risk material need not be stored, handled and processed separately from animal material from scheme animals

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill