The Reservoirs Act 1975 (Capacity, Registration, Prescribed Forms, etc.) (England) Regulations 2013

Changes over time for: The Reservoirs Act 1975 (Capacity, Registration, Prescribed Forms, etc.) (England) Regulations 2013 (without Schedules)

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Reservoirs Act 1975 (Capacity, Registration, Prescribed Forms, etc.) (England) Regulations 2013. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to :

Citation, commencement, extent and applicationE+W

1.  These Regulations—

(a)may be cited as the Reservoirs Act 1975 (Capacity, Registration, Prescribed Forms, etc.) (England) Regulations 2013;

(b)come into force on 30th July 2013;

(c)extend to England and Wales; and

(d)apply in relation to reservoirs in England.

Commencement Information

I1Reg. 1 in force at 30.7.2013, see reg. 1(b)

InterpretationE+W

2.—(1) In these Regulations—

“the 1930 Act” means the Reservoirs (Safety Provisions) Act 1930(1);

“the 1975 Act” means the Reservoirs Act 1975;

“Agency” means the Environment Agency;

“English register” means the register required to be established and maintained by the Agency under section 2(2) of the 1975 Act;

“lowest natural level of any part of the surrounding land” includes the lowest bed level of any watercourse;

“natural level” is the level of the natural land remaining after the construction or any alteration of a large raised reservoir;

“panel” means a panel of civil engineers constituted under section 4 of the 1975 Act(2);

“structure” means a dam, reservoir wall or embankment;

“surrounding land” means the land adjacent to a large raised reservoir;

“toe” means the point on the downstream side of a structure forming part of the reservoir where its base meets the lowest natural level of any part of the surrounding land;

“top water level” means—

(a)

in the case of a reservoir with a fixed overflow sill, the lowest crest level of that sill;

(b)

in the case of a reservoir the overflow from which is controlled wholly or partly by moveable gates, syphons or otherwise, the maximum level to which water may be stored exclusive of any provision for flood storage; or

(c)

in the case of a reservoir designed for the purposes of holding back floodwater, the maximum level to which floodwater may be stored during any flood event exclusive of any provision for overflow.

(2) In these Regulations—

(a)any information required or notification given must be in writing;

(b)a reference to any document or information includes that document or information in electronic form;

(c)any document or information communicated by electronic means shall be deemed—

(i)to have been sent where the sender can produce a copy of the electronic communication which—

(aa)contained the document or information;

(bb)shows the time and date the message was sent; and

(cc)shows that the document was sent to the recipient.

(ii)to have been sent by the person from whom it purports to originate; and

(iii)not to have been tampered with or otherwise modified;

(d)any requirement for a signature in a report, certificate or directions to which these Regulations apply may be satisfied by an electronic signature incorporated into the document;

(e)“electronic signature” means data in electronic form which are attached to or logically associated with other electronic data and which serve as a method of authentication.

Commencement Information

I2Reg. 2 in force at 30.7.2013, see reg. 1(b)

Calculation of capacity of a large raised reservoirE+W

3.—(1) An undertaker must calculate the capacity of a large raised reservoir by measuring the maximum volume of water in cubic metres capable of being stored in the reservoir—

(a)above the bed of the reservoir; and

(b)between the toe of the reservoir and its top water level.

(2) The calculation of the capacity of the reservoir must be completed by the earlier of—

(a)the date on which a final certificate is given for any purpose of the 1975 Act; and

(b)the date on which a certificate is given for the purposes of section 13(2) of the 1975 Act(3).

(3) Water not capable of flowing out of the reservoir over natural ground in the event of an uncontrolled release of water shall not be included in the calculation.

(4) In this regulation “bed of the reservoir” includes any silt or other material that is judged by the engineer giving a final certificate, or giving a certificate under section 13(2) of the 1975 Act, to be incapable of flowing out of the reservoir over natural ground in the event of an uncontrolled release of water from the reservoir.

Commencement Information

I3Reg. 3 in force at 30.7.2013, see reg. 1(b)

Registration requirementsE+W

4.—(1) An undertaker must register a large raised reservoir with the Agency by providing the information described in Schedule 1, paragraphs 1 to 7.

(2) The information must be registered before the end of the period of 28 days beginning with the day of the issue of a final certificate given in accordance with section 7 of the 1975 Act(4) in relation to—

(a)the construction of a new reservoir;

(b)the alteration of an existing structure of a reservoir that prior to its alteration was not a large raised reservoir; or

(c)the alteration of the area of a reservoir that prior to its alteration was not a large raised reservoir.

Commencement Information

I4Reg. 4 in force at 30.7.2013, see reg. 1(b)

Notification of changes to the English registerE+W

5.—(1) Where there has been a change or addition to any of the information registered in accordance with regulation 4, the undertaker must provide the Agency with the relevant up to date information within 28 days beginning with—

(a)the date on which the event leading to the change or addition to the information occurred; or, if later,

(b)the date on which it becomes apparent to the undertaker that the event leading to the change or addition to the information occurred.

(2) The Agency may request confirmation from the undertaker that any or all of the information given by that undertaker for the purposes of the English register is up to date or complete.

(3) Where paragraph (2) applies, without prejudice to paragraphs (4), (6) and (8), the undertaker must within 28 days beginning with the day on which the Agency requests such confirmation—

(a)confirm that the relevant information is up to date or, where any of that information is not up to date, provide the up to date information; and

(b)where any of the information is not complete or is missing, provide the complete or missing information.

(4) Where an alteration so as to increase or decrease the capacity of a large raised reservoir is proposed to be carried out, the undertaker must notify the Agency not less than 28 days before the date of of any such alteration.

(5) A notification referred to in paragraph (4) must contain the following information—

(a)the date of the proposed commencement of the alteration;

(b)details necessary for the Agency to understand the nature and extent of the proposed work to the reservoir.

(6) Where it is proposed that the use of a large raised reservoir be abandoned under section 14 of the 1975 Act(5), the undertaker must notify the Agency not less than 28 days before any such proposed abandonment of use.

(7) A notification referred to in paragraph (6) must include the proposed commencement date of the abandonment of use.

(8) Where a construction, supervising or inspecting engineer is appointed, the undertaker must within 28 days beginning with the date of the appointment notify the Agency and inform it of the date of the appointment.

(9) The undertaker must notify the Agency within 28 days of the date on which an engineer ceases to be—

(a)the construction engineer before that engineer has issued a final certificate, or

(b)the supervising engineer.

(10) An undertaker who intends to cease being an undertaker must notify the Agency of—

(a)the date on which the undertaker intends to cease being the undertaker;

(b)the name and address of the person who is intended to be the new undertaker;

(c)the date on which that person is intended to become the new undertaker.

(11) Paragraphs (8) and (9) apply where a construction engineer is appointed to design and supervise any alteration to a large raised reservoir under section 6 of the 1975 Act(6).

Commencement Information

I5Reg. 5 in force at 30.7.2013, see reg. 1(b)

Keeping and inspection of the English registerE+W

6.—(1) The English register and copies of that register must be kept at the principal office of the Agency’s reservoir safety enforcement team(7).

(2) The Agency must ensure that the English register contains the information described in Schedule 1, paragraphs 8 to 10 for each large raised reservoir.

Commencement Information

I6Reg. 6 in force at 30.7.2013, see reg. 1(b)

The English register: transitional arrangementsE+W

7.—(1) Where information about a large raised reservoir appeared in the English register immediately before 30th July 2013, that information shall be taken to have been provided by the undertaker in compliance with the obligation in section 2(2B) of the 1975 Act.

(2) Subject to paragraph (3), where any calculation of capacity of a large raised reservoir has been made for the purposes of the English register required to be kept immediately before the 30 July, that calculation shall be taken to have been provided for the purposes of registration.

(3) Paragraph (2) shall no longer apply from the earliest of—

(a)the date on which a final certificate is given by a construction engineer for any purpose of the 1975 Act; and

(b)the date on which a certificate is given for the purposes of section 13(2) of the 1975 Act.

Commencement Information

I7Reg. 7 in force at 30.7.2013, see reg. 1(b)

Reports by the Agency to the Secretary of StateE+W

8.—(1) The Agency must make reports to the Secretary of State under section 3(1) of the 1975 Act—

(a)on or before 1st April 2015; and

(b)on or before the date which is two years following the date by which the last report was due.

(2) The reports must give the following information—

(a)the number of large raised reservoirs that have been registered;

(b)the steps (if any) that the Agency has taken in respect of any large raised reservoir to secure that the undertakers of that reservoir have observed and complied with the requirements of the 1975 Act; and

(c)if the Agency is the undertaker for any large raised reservoir, a statement as to—

(i)whether it has been required to take steps to observe and comply with the 1975 Act;

(ii)any steps it has taken in accordance with paragraph (i); and

(iii)the number of large raised reservoirs for which it is the undertaker.

Commencement Information

I8Reg. 8 in force at 30.7.2013, see reg. 1(b)

Records of water levels etc.E+W

9.—(1) For the purposes of section 11(1) of the 1975 Act, the form of record to be kept for every high-risk reservoir must be the form prescribed in Schedule 2.

(2) In addition to the matters specified in section 11(1)(a) and (b) of the 1975 Act, the record must include the matters set out in Schedule 3.

(3) The information which is to be given about those matters which are specified in section 11(1)(a) and (b) of the 1975 Act must be that described in Parts 1 and 2 of the form of record in Schedule 2 and the information which is to be given about the additional matters set out in Schedule 3 must be that described in Parts 3 to 16 of that form.

Commencement Information

I9Reg. 9 in force at 30.7.2013, see reg. 1(b)

Forms of certificates of engineersE+W

10.—(1) For the purposes of section 20(1) of the 1975 Act, a certificate must be in the form prescribed in Schedule 4.

(2) A certificate referred to in paragraph (1) is—

(a)a preliminary certificate given under section 7(1) of the 1975 Act;

(b)an interim certificate given under section 7(2) of the 1975 Act;

(c)a final certificate given under section 7(3) of the 1975 Act;

(d)a certificate of efficient execution of works given under section 7(6) or 8(7) of the 1975 Act(8);

(e)a certificate given under section 10(5)(9) of the 1975 Act as to the report of an inspecting engineer;

(f)a certificate given under section 10(6) of the 1975 Act as to the carrying into effect of safety recommendations;

(g)a certificate given under section 12AA(3) of the 1975 Act(10) as to the satisfaction of the requirements of a direction to prepare a flood plan;

(h)an interim certificate given under section 13(1A) of the 1975 Act;

(i)a certificate given under section 13(2) of the 1975 Act as to the completion and efficient execution of an alteration so as to discontinue a large raised reservoir;

(j)a certificate given under section 14(3) of the 1975 Act as to an engineer’s report’s safety recommendations on abandonment;

(k)a certificate given under section 15(2) of the 1975 Act(11) as to the carrying into effect of safety recommendations; or

(l)a referee’s certificate given under section 19(4) of the 1975 Act(12).

Commencement Information

I10Reg. 10 in force at 30.7.2013, see reg. 1(b)

Forms of reports of engineersE+W

11.—(1) For the purposes of section 20(1) of the 1975 Act, a report must be given in the form prescribed in Schedule 5.

(2) A report referred to in paragraph (1) is—

(a)a report under section 8(2) of the 1975 Act of an engineer made on the construction or alteration of a large raised reservoir;

(b)a report under section 9(1) of the 1975 Act of an engineer made before the re-use of an abandoned large raised reservoir;

(c)a report under section 10(1) of the 1975 Act made following an engineer’s inspection of a high-risk reservoir;

(d)a report under section 14(1) of the 1975 Act of an engineer’s safety recommendations made on abandonment of a large raised reservoir.

Commencement Information

I11Reg. 11 in force at 30.7.2013, see reg. 1(b)

Forms of directions of engineersE+W

12.—(1) For the purposes of section 20(1) of the 1975 Act, a direction of an engineer must be given in the form prescribed in Schedule 6.

(2) A direction referred to in paragraph (1) is—

(a)a direction made under section 11(2) of the 1975 Act (recording of water levels etc);

(b)a direction made under section 12(6) of the 1975 Act(13) (supervision of reservoirs: visual inspection by undertaker);

(c)a direction made under section 12AA(4) of the 1975 Act (flood plans: testing);

(d)a direction made under section 12AA(7) of the 1975 Act (flood plans: revision); or

(e)a direction made under section 19(4A) of the 1975 Act (reference of disputed recommendations to a referee: direction to engineer to issue a certificate).

Commencement Information

I12Reg. 12 in force at 30.7.2013, see reg. 1(b)

Prescribed information under section 21(1) to be provided by undertakers when intending to construct or bring back into use a large raised reservoirE+W

13.  In a notice served under section 21(1) of the 1975 Act, the undertakers must give the Agency the information prescribed in Schedule 7.

Commencement Information

I13Reg. 13 in force at 30.7.2013, see reg. 1(b)

Reports to the AgencyE+W

14.—(1) This regulation applies in relation to any incident—

(a)which results, or could result, in the uncontrolled release of water from a large raised reservoir; and

(b)in respect of which emergency measures have been taken to prevent any or any further uncontrolled release of water and to minimise the danger to human life.

(2) Where this regulation applies, the undertaker must send to the Agency—

(a)a preliminary report of the incident as soon as practicable after the commencement of the emergency measures referred to in paragraph (1)(b); and

(b)a final report of the incident within one year beginning with the day after the day on which the emergency measures were commenced.

(3) The preliminary report referred to in paragraph (2)(a) must contain sufficient particulars to enable the Agency to ascertain the date and time of the incident, the location of the reservoir and immediately observable facts.

(4) The final report of the incident referred to in paragraph (2)(b) must contain sufficient—

(a)information about the facts relating to it;

(b)analysis of its circumstances;

(c)particulars to demonstrate the conclusions that can be drawn from it;

(d)particulars to demonstrate the lessons learned from it.

(5) The Agency may direct an undertaker to prepare a revision to the final report in relation to such matters as the Agency notifies to the undertaker provided the Agency has—

(a)explained to the undertaker why it believes each revision to the report is necessary, and

(b)specified a period, not less than three months, within which the undertaker must make the revisions.

(6) Revisions to the final report shall not be effective unless—

(a)the undertaker has sent a version of the report to the Agency which incorporates the revisions notified by the Agency, and

(b)the Agency has accepted the revisions.

Commencement Information

I14Reg. 14 in force at 30.7.2013, see reg. 1(b)

ReviewE+W

15.—(1) The Secretary of State must from time to time—

(a)carry out a review of these Regulations;

(b)set out the conclusions of the review in a report; and

(c)publish the report.

(2) The report must in particular—

(a)set out the objectives intended to be achieved by these Regulations;

(b)assess the extent to which those objectives are achieved; and

(c)assess whether those objectives remain appropriate and, if so, the extent to which they could be achieved with a system that imposes less regulation.

(3) The first report under this regulation must be published before the end of the period of 5 years beginning on the day on which these Regulations come into force.

(4) Reports under this regulation must afterwards be published at intervals not exceeding 5 years.

Commencement Information

I15Reg. 15 in force at 30.7.2013, see reg. 1(b)

RevocationsE+W

16.  The following Regulations are revoked—

(a)the Reservoirs Act 1975 (Registers, Reports and Records) Regulations 1985(14);

(b)the Reservoirs Act 1975 (Registers, Reports and Records) (Amendment) Regulations 1985(15);

(c)the Reservoirs Act 1975 (Certificates, Reports and Prescribed Information) Regulations 1986(16).

Commencement Information

I16Reg. 16 in force at 30.7.2013, see reg. 1(b)

de Mauley

Parliamentary Under Secretary of State

Department for Environment, Food and Rural Affairs

3rd July 2013

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Asesiadau Effaith

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill