This
adran has no associated
Memorandwm Esboniadol
1. In this Schedule—
“environmental statement” means the statement submitted under regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009(1), together with the shadow Habitats Regulations Assessment report, statements of common ground concluded with Natural England, the MMO and the Environment Agency and the following documents submitted by the undertaker and certified under article 55 (certification of plans etc)—
Reference | Title |
---|---|
EX 3.1 | Able Humber Port Northern Area Planning Committee Meeting Notes Feb 2012 |
EX 7.7 | AMEP Material Management Plan |
EX 7.8 | Able Marine Energy Park Dredging Strategy |
EX 8.5 | Validation of 3D Flow and Sediment Models used for Assessment of Impacts of AMEP on Fine Sediment Transport |
EX 8.6 | Maintenance Dredge Variability |
EX 8.7A | Modelling of Final Quay Design (Supplement to Annex 8.1 of the ES) |
EX 8.8 | Update to Longer Term Morphology Predictions in the Region of the Centrica and E.ON intakes and outfalls |
EX 8.9 | Historical Review of Morphological Change North of HIT (2001–2010) |
EX 8.10 | Long-term Morphological Change at Embayment South of Quay |
EX 8.11 | Water Framework Directive – Compensation Site |
EX 8.12 | Water Framework Directive – Project Wide |
EX 8.12A | Water Framework Directive |
EX 8.13 | IOTA Dredge Appropriate Assessment |
EX 8.14 | Hydraulic & Sediment Regime – Piled Structures |
EX 8.15 | Effect of Moored Vessels on Flows |
EX 8.16 | Chapter 8 Signposting Document |
EX 9.7 | Assessment of the effects of relocations of the E.ON and Centrica outfalls on thermal recirculation |
EX 10.4 | Effect of Dredged Material Disposal on 1) Subtidal and Intertidal Features and 2) Aquatic Ecology |
EX 10.5 | Supporting Information on Harbour Porpoises in the Humber Estuary |
EX 10.6 | Impact of Berthing Pocket Construction |
EX 10.7 | Soft Start and Seals |
EX 10.8 | Disposal Site Characterisation and Impact Assessment |
EX 10.9 | Environmental Management and Monitoring Plan: 1. Marine Works (Draft) |
EX 11.14 | Biotopes of the Intertidal and Subtidal Sediments around the AMEP site, in the Humber Estuary |
EX 11.16 | Assessment Update for Breeding Birds |
EX 11.17 | AMEP Vascular Plant Surveys |
EX 11.18 | Sensitive Months for Birds Using Intertidal |
EX 11.19 | AMEP Bat Surveys Supplementary Note |
EX 11.20 | Draft Great Crested Newts Licence Application – acknowledgement of receipt |
EX 11.22 | The Impact of SPMTs and Cranes on the Operational Buffer |
EX 11.23 | Immediate Habitat Losses Within the Designated Site |
EX 11.24 | Medium and Long Term Losses Within the Designated Site |
EX 11.26 | Pumping Station |
EX 11.26A | Water Vole Mitigation |
EX 11.27 | Killingholme Phase 2 Survey |
EX 11.27A | Breeding Bird Mitigation |
EX 11.28 | Great Crested Newt Survey (2006) |
EX 11.29 | Water Vole Survey (2009) |
EX 11.30 | Location of Replacement Ponds for Great Crested Newts |
EX 11.31 | M456 Invertebrate Survey |
EX 11.32 | Draft Environmental Monitoring and Management Plan: 2. Terrestrial Habitat – Killingholme |
EX 11.33 | In combination Effects on Curlew |
EX 13.2 | Addendum to Flood Risk Assessment |
EX 14.4 | Simulation Videos and Stills |
EX 15.3 | A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit |
EX 15.4 | A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit Designer’s Response |
EX 15.5 | Additional Junction RSA |
EX 19.1 | Lighting Lux Plans |
EX 20.3 | Additional Landscape Masterplan |
EX 28.1 | Compensation Site Interim Report on Detailed Design |
EX 28.2 | Old Little Humber Farm: Wet Grassland Creation, Management and Monitoring Plan |
EX 28.3 | Final Compensation Proposals, Parts 1–10 |
EX 31.5 | Re-Use of In Situ Material at CCS (Inc. Cherry Cobb Sands Phase 2 Site Investigation) |
EX 31.5A | Factual Report on Geo–Environmental Ground Investigation, Cherry Cobb Sands |
EX 34.2 | An Assessment of Temporal Variation of Benthic Invertebrate Communities in the Humber Estuary |
EX 35.12 | Farmland Disturbance at Cherry Cobb Sands |
EX 35.13 | Badger Bait–Marking Survey |
EX 35.14 | Cherry Cobb Sands Compensation Site: Bird Survey Results August 2010 to April 2011 |
EX 36.2 | North Bank Flood Defence Crest Height |
EX 36.3 | Residual Flood Risk to Property on North Bank |
EX 36.4 | Embankment Inspection and Maintenance Report |
EX 44.1 | Supplementary In-Combination Assessment |
EX 44.2 | Addendum to EX 44.1 |
; and
“the water framework directive” means Directive 2000/60/EC of the European Parliament and of the Council of 23rd October 2010 establishing a framework for Community action in the field of water policy(2).
(1)
(2)
O.J. No L327, 22.12.2000, p. 1-73.