There are currently no known outstanding effects for the The National Grid (Hinkley Point C Connection Project) Order 2016.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
20.Compulsory acquisition of land – incorporation of the mineral code
21.Time limit for exercise of authority to acquire land compulsorily
24.Extinguishment of private rights and restrictive covenants relating to apparatus belonging to National Grid or WPD removed from land subject to temporary possession
25.Application of the Compulsory Purchase (Vesting Declarations) Act 1981
31.Temporary use of land for maintaining the authorised development
SCHEDULES
A nationally significant infrastructure project as defined in sections 14...
In the District of Sedgemoor
Work No. 1A — Bridgwater Tee
Works to construct a 400kV Teed circuit commencing on Works...
In the District of Sedgemoor
Work No. 1B — ZGA route
The construction and installation of a 400kV overhead electric line,...
In the District of Sedgemoor
Work No. 1C — Huntspill
Works to construct temporary sections of a 400kV overhead electric...
In the District of Sedgemoor
Work No. 1D — LD route Puriton to South Mendips...
Works to construct a 400kV overhead electric line 12.8km in...
The works include installation and construction of a temporary site...
In the District of North Somerset
Work No. 1E — LD route Sandford Substation to M5...
Works to construct a 400kV overhead electric line between full...
The route commences at gantry structures LD39A and LD39B on...
The overhead electric line between FLT gantry structures LD39A and...
In the District of North Somerset
Work No. 1F — LD route M5 to south of...
Works to construct a 400kV overhead electric line between pylons...
In the District of North Somerset, the City of Bristol...
Work No. 1G — LD route south of River Avon...
Works to construct a 400kV overhead electric line, between pylon...
The works include installation and construction of a temporary site...
In the District of Sedgemoor
Work No. 2A — Bridgwater tee
Works to construct a 400kV Teed circuit at the location...
The works include the construction of a permanent vehicular access...
In the District of Sedgemoor and the District of North...
Work No. 2B — Mendips underground cable and cable crossing...
Works to construct a 400kV underground electric cable route comprising—...
The works include the installation and construction of 4 temporary...
Work No. 2C — South Mendips cable sealing end compound...
Works to construct the South Mendips cable sealing end (CSE)...
In the District of Sedgemoor
Work No. 2D — Temporary project office compound
Works to construct a temporary project office compound, at the...
In the District of North Somerset
Work No. 3A — Sandford Substation
Works to construct the Sandford 400/132kV Substation as shown on...
In the District of North Somerset
Work No. 3B — Temporary project office compound
Works to construct a temporary project office compound, at the...
In the District of North Somerset
Work No. 4A — AT connection
Works to connect Sandford 132kV Substation to the existing 132kV...
The works include a temporary site compound as shown on...
In the District of Sedgemoor and the District of North...
Work No. 4B — F route removal
The removal of 47.8km of the F Route 132kV overhead...
In the District of North Somerset
Work No. 4C — N route connection
Works to connect Sandford 400/132kV Substation to the existing 132kV...
In the District of North Somerset
Work No. 4D — W route removal and undergrounding
Works to allow the removal of part of the 132kV...
In the District of North Somerset
Work No. 4E — Portishead 132kV substation
The installation of cables and cable sealing ends within Portishead...
In the District of North Somerset
Work No. 4F — Churchill 132kV Substation
Works to allow the continued operation of Churchill 132kV Substation...
The works include construction and installation of a temporary site...
In the District of North Somerset and the City of...
Work No. 4G — G route removal (Portishead to Avonmouth)...
The removal of 5.4km of the G Route 132kV overhead...
In the City of Bristol
Work No. 4H — G route removal (Avonmouth to Pylon...
The removal of 2.1km of the G Route 132kV overhead...
In the City of Bristol
Work No. 4I — G route undergrounding
The installation of 2.3km of underground 132kV electric cables and...
The works include construction and installation of a temporary site...
In the City of Bristol
Work No. 4J — G route
The construction and installation of a cable sealing end pylon...
In the City of Bristol
Work No. 4K — Avonmouth 132kV Substation
The installation of electric cables and fibre optic cable, cable...
In the City of Bristol and the District of South...
Work No. 4L — Seabank DA route
Works as shown on Works Plan section G, sheet 7...
The works include a temporary site compound for the combined...
In the City of Bristol
Work No. 4M — Seabank BW route
Works as shown on Works Plan section G, sheet 7...
The works include a temporary site compound for the combined...
In the City of Bristol
Work No. 4N — Seabank G route
Works as shown on Works Plan section G, sheet 7...
The works include a temporary site compound for the combined...
In the City of Bristol
Work No. 4O — Seabank 132kV Substation
Work on the existing Seabank 132kV Substation compound to extend...
In the District of North Somerset
Work No. 4P — BW Route undergrounding south of the...
Works as shown on Works Plan section F, sheets 3...
The works include a temporary site compound as shown on...
In the City of Bristol
Work No. 5 — extension of Seabank 400kV Substation
Works to extend the existing Seabank 400kV Substation (shown on...
Works to reconfigure 400kV overhead electric lines consisting of—
In the District of West Somerset
Work No. 6A
The construction and installation of a 400kV overhead electric line...
In the District of West Somerset
Work No. 6B
The removal of 1.4km of overhead electric line to include...
In the District of West Somerset
Work No. 6C
The construction and installation of a 400kV overhead electric line...
In the District of West Somerset
Work No. 6D
The removal of 900m of overhead electric line to include...
In the District of West Somerset
Work No. 6E
The construction and installation of a 400kV overhead electric line...
Such associated development not listed above, within the Order limits,...
STREETS OR PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP
6.For such of the licensable marine activities that involve the...
9.The licence holder must inform the MMO and Environment Agency...
11.The licence holder must inform the MMO Local Office in...
12.The licence holder must inform the relevant harbour authorities in...
15.The licence holder must ensure that any coatings and treatments...
16.The licence holder must ensure suitable bunding or storage facilities...
18.Any construction materials that are misplaced below mean high water...
19.The licence holder must ensure that the MMO Local Office...
20.The licence holder must ensure that any equipment, temporary structures,...
21.(1) The licence holder must ensure that if maintenance is...
MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
2.(1) Without limitation on the scope of paragraph (1), the...
4.For section 7 of the 1965 Act (measure of compensation)...
6.The following provisions of the 1965 Act (which state the...
8.Section 20 of the 1965 Act (protection for interests of...
9.Section 22 of the 1965 Act (protection of acquiring authority’s...
PART 1 PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
1.The provisions of this Part have effect for the protection...
2.In this Part— “alternative apparatus” means alternative apparatus adequate to...
4.Despite any provision in this Order or anything shown on...
6.(1) Not less than 28 days before starting the execution...
7.(1) Subject to the following provisions of this paragraph, the...
PART 2 PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
PART 3 PROTECTION FOR HIGHWAYS AND TRAFFIC
13.The provisions of this Part have effect unless otherwise agreed...
14.(1) In this Part— “approved”, in relation to plans, means...
15.In exercising the powers conferred by this Order in relation...
16.(1) The undertaker must not, without the consent of the...
17.The undertaker must not under the powers conferred by or...
18.(1) Before commencing the construction of, or the carrying out...
19.Any officer of the relevant highway authority duly appointed for...
21.The undertaker must not remove any soil or material from...
22.(1) If the relevant highway authority, after giving to the...
23.(1) The undertaker must not, except with the consent of...
24.The undertaker must not, except with the consent of the...
25.The undertaker must, if reasonably so required by the relevant...
29.Any difference arising between the undertaker and the relevant highway...
PART 4 PROTECTION FOR RAILWAY INTERESTS
30.The provisions of this Part have effect unless otherwise agreed...
31.In this Part— “construction” includes execution, placing, alteration and reconstruction...
33.(1) The undertaker must before commencing construction of any specified...
35.The undertaker must— (a) at all times afford reasonable facilities...
36.Network Rail must at all times afford reasonable facilities to...
37.(1) If any permanent or temporary alterations or additions to...
38.The undertaker must pay to Network Rail all reasonable fees,...
39.(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
41.The undertaker must not provide any illumination or illuminated sign...
42.Any additional expenses which Network Rail may reasonably incur in...
46.The undertaker and Network Rail may, subject in the case...
47.Nothing in this Order, or in any enactment incorporated with...
PART 5 PROTECTION FOR FIRST CORPORATE SHIPPING LIMITED
49.The provisions of this Part have effect unless otherwise agreed...
55.Use of land and execution, maintenance and use of the authorised development
56.The undertaker must before commencing the construction of any ancillary...
57.(1) Neither National Grid nor WPD must exercise any powers...
58.(1) Neither National Grid nor WPD must exercise any powers...
59.(1) Unless BPC agrees otherwise, National Grid and WPD must...
60.In the execution and maintenance of the authorised development under...
PART 7 PROTECTION FOR THE ENVIRONMENT AGENCY
70.The provisions of this Part have effect unless otherwise agreed...
71.(1) In this Part— “Agency” means the Environment Agency; “Byelaws”...
72.The undertaker must not open or close or interfere with...
74.(1) The undertaker must give at least 28 days’ written...
76.Unless otherwise agreed, any dispute or difference arising between the...
PART 8 PROTECTION FOR RWE GENERATION UK PLC
77.The provisions of this Part have effect unless otherwise agreed...
78.In this Part— “apparatus” means any of the following apparatus...
79.Despite any provision of this Order or anything shown on...
81.(1) Not less than 56 days before starting the execution...
82.The undertaker must pay to RWE the proper and reasonable...
PART 9 PROTECTION FOR CLH PIPELINE
84.The provisions of this Part have effect for the protection...
85.In this Part— “alternative apparatus” means alternative apparatus adequate to...
86.Despite any provision of this Order or anything shown on...
88.(1) Not less than 28 days before starting the execution...
89.(1) Subject to the following provisions of this paragraph, the...
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys
Mae'r data ar y dudalen hon ar gael yn y fformatau data amgen a restrir: