Detailed design

3.—(1) The authorised development must be carried out in accordance with—

(a)the approved plans listed in Table 1 below inclusive of any limits of deviation; and

(b)any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 19(1))—

Table 1

works plans

Submission document reference number 2.3

access rights of way plan

Submission document reference number 2.4

(2) The authorised development must not exceed the maximum parameters specified in Table 2 and Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 19(1))—

Table 2

(1)

Element of authorised development

(2)

Maximum height

(metres) above a site level of approximately 99 metres AOD

(3)

Maximum width

(metres)

(4)

Maximum length

(metres)

(5)

Other parameters

Gas turbine building (part of numbered work 1A)25 metres45 metres60 metresMaximum height 124m AOD
Each Heat Recovery Steam Generator Building (part of numbered work 1A)35 metres13 metres25 metresMaximum height AOD 134 metres
Each exhaust gas emission flue stack (part of numbered work 1A)50 metresMaximum height AOD 149 metres Maximum diameter 6.5 metres
Steam turbine building (part of numbered work 1A)21 metres26 metres45 metres
Air cooled condenser (part of numbered work 1A)26 metres48 metres48 metres
Switchgear room (part of numbered work 1A)5 metres10 metres15 metres
Raw/fire water storage tank (part of numbered work 1B)20 metresMaximum diameter 15 metres
Each water storage tank (part of numbered work 1B)20 metresMaximum diameter 5 metres
Water treatment system (part of numbered work 1B)10 metres25 metres20 metres
Workshop (part of numbered work 1B)10 metres20 metres30 metres
Natural gas pressure regulating installation (PRI) (part of numbered work 1B)5 metres25 metres35 metres
Administration/ control building (part of numbered work 1C)10 metres10 metres20 metres
Heat network interface building (part of numbered work 1C)15 metres20 metres30 metres
Each transformer compound (part of numbered work 1D)8 metres15 metres15 metres
132kV switchyard (part of work numbered 1D)10 metres42 metres72 metres
Perimeter fencing (part of numbered work 1E)2.5 metres770 metres

Table 3

(1)

Element of authorised development

(2)

Maximum height

(metres) above the existing site level

(3)

Maximum width

(metres)

(4)

Maximum length

(metres)

(5)

Other parameters

Above Ground Installation (numbered work 2A)2.5 metres13 metres13 metres
Pipeline inspection gauge facility (part of numbered work 2A)1.6 metres1 metre5.5 metres
Perimeter fencing (part of numbered work 2A)2.5 metres52 metres
Pipeline support plinth including crown of pipe (part of numbered work 2B)2 metres0.8 metres1.4 metres

(3) To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.

(4) Numbered works 1, 2 and 4 may not commence until, for that numbered work, written details have been submitted to and approved by the relevant planning authority (in consultation with the National Trust regarding the external appearance and the colour of all permanent buildings and structures) concerning—

(a)the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and

(b)the colour, materials and surface finishes of the pipeline and all permanent buildings and structures.

(5) The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill