Detailed design

3.—(1) The authorised development must be carried out in accordance with—

(a)the approved plans listed in Table 1 below inclusive of any limits of deviation; and

(b)any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 19(1))—

Table 1

works plans

Submission document reference number 2.3

access rights of way plan

Submission document reference number 2.4

(2) The authorised development must not exceed the maximum parameters specified in Table 2 and Table 3 below (as the same may be amended by approval of the relevant planning authority under requirement 19(1))—

Table 2

(1)

Element of authorised development

(2)

Maximum height

(metres) above a site level of approximately 99 metres AOD

(3)

Maximum width

(metres)

(4)

Maximum length

(metres)

(5)

Other parameters

Gas turbine building (part of numbered work 1A)25 metres45 metres60 metresMaximum height 124m AOD
Each Heat Recovery Steam Generator Building (part of numbered work 1A)35 metres13 metres25 metresMaximum height AOD 134 metres
Each exhaust gas emission flue stack (part of numbered work 1A)50 metresMaximum height AOD 149 metres Maximum diameter 6.5 metres
Steam turbine building (part of numbered work 1A)21 metres26 metres45 metres
Air cooled condenser (part of numbered work 1A)26 metres48 metres48 metres
Switchgear room (part of numbered work 1A)5 metres10 metres15 metres
Raw/fire water storage tank (part of numbered work 1B)20 metresMaximum diameter 15 metres
Each water storage tank (part of numbered work 1B)20 metresMaximum diameter 5 metres
Water treatment system (part of numbered work 1B)10 metres25 metres20 metres
Workshop (part of numbered work 1B)10 metres20 metres30 metres
Natural gas pressure regulating installation (PRI) (part of numbered work 1B)5 metres25 metres35 metres
Administration/ control building (part of numbered work 1C)10 metres10 metres20 metres
Heat network interface building (part of numbered work 1C)15 metres20 metres30 metres
Each transformer compound (part of numbered work 1D)8 metres15 metres15 metres
132kV switchyard (part of work numbered 1D)10 metres42 metres72 metres
Perimeter fencing (part of numbered work 1E)2.5 metres770 metres

Table 3

(1)

Element of authorised development

(2)

Maximum height

(metres) above the existing site level

(3)

Maximum width

(metres)

(4)

Maximum length

(metres)

(5)

Other parameters

Above Ground Installation (numbered work 2A)2.5 metres13 metres13 metres
Pipeline inspection gauge facility (part of numbered work 2A)1.6 metres1 metre5.5 metres
Perimeter fencing (part of numbered work 2A)2.5 metres52 metres
Pipeline support plinth including crown of pipe (part of numbered work 2B)2 metres0.8 metres1.4 metres

(3) To the extent that design objectives relating to any numbered work are set out in the design objectives statement, that numbered work must be designed substantially in accordance with the relevant design objective set out therein.

(4) Numbered works 1, 2 and 4 may not commence until, for that numbered work, written details have been submitted to and approved by the relevant planning authority (in consultation with the National Trust regarding the external appearance and the colour of all permanent buildings and structures) concerning—

(a)the siting, design, external appearance, dimensions and floor levels of all permanent buildings and structures; and

(b)the colour, materials and surface finishes of the pipeline and all permanent buildings and structures.

(5) The details to be submitted for approval under sub-paragraph (4) must include appropriately scaled plans and sectional drawings.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources