Chwilio Deddfwriaeth

The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017

Changes over time for: The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017 (Schedules only)

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Offshore Petroleum Production and Pipe-lines (Environmental Impact Assessment and other Miscellaneous Provisions) (Amendment) Regulations 2017. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to :

Regulation 20

SCHEDULE 1U.K.

Commencement Information

I1Sch. 1 in force at 16.5.2017, see reg. 1

Regulations 3, 5, 6 and 11

SCHEDULE 1U.K.MATTERS TO BE TAKEN INTO ACCOUNT IN DECIDING WHETHER RELEVANT PROJECT LIKELY TO HAVE A SIGNIFICANT EFFECT ON THE ENVIRONMENT

Characteristics of the project

1.  The characteristics of the relevant project having regard, in particular, to—

(a)the size and design of the project;

(b)the cumulation with other existing or approved projects;

(c)the use of natural resources in particular land, soil, water and biodiversity;

(d)the production of waste, pollution and nuisances;

(e)the risk of major accidents or disasters which are relevant to the project concerned including those caused by climate change, in accordance with scientific knowledge; and

(f)the risks to human health (for example, due to water contamination or air pollution).

Location of the project

2.  The environmental sensitivity of geographical areas likely to be affected by the relevant project having regard, in particular, to—

(a)the existing and approved land use;

(b)the relative abundance, availability, quality and regenerative capacity of natural resources (including soil, land, water and biodiversity) in the area and its underground;

(c)the absorption capacity of the natural environment, paying particular attention to the following areas—

(i)wetlands, riparian areas, river mouths;

(ii)coastal zones and the marine environment;

(iii)mountain and forest areas;

(iv)nature reserves and parks;

(v)areas classified or protected under national legislation, Natura 2000 areas designated by member states pursuant to Directive 92/43/EEC(1) or Directive 2009/147/EC(2);

(vi)areas in which there has already been a failure to meet the environmental quality standards laid down in EU legislation and relevant to the project or in which it is considered that there is such a failure;

(vii)densely populated areas; and

(viii)landscapes and sites of historical, cultural or archaeological significance.

Type and characteristics of the potential impact

3.  The likely significant effects of the relevant project on the environment in relation to the criteria set out under paragraphs 1 and 2, and having regard in particular to the impact of the project on the factors specified in Article 3(1) of the Directive, taking into account—

(a)the magnitude and spatial extent of the impact (for example geographical area and size of the population likely to be affected);

(b)the nature of the impact;

(c)the transboundary nature of the impact;

(d)the intensity and complexity of the impact;

(e)the probability of the impact;

(f)the expected onset, duration, frequency and reversibility of the impact;

(g)the cumulation of the impact with the impact of other existing or approved projects; and

(h)the possibility of effectively reducing the impact.

Regulation 21

SCHEDULE 2U.K.

Commencement Information

I2Sch. 2 in force at 16.5.2017, see reg. 1

Regulation 3B

SCHEDULE 2U.K.Information for the Environmental Statement

1.  A description of the relevant project, including in particular:

(a)a description of the location of the project;

(b)a description of the physical characteristics of the whole project, including, where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases;

(c)a description of the main characteristics of the operational phase of the project (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used; and

(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) and quantities and types of waste produced during the construction and operation phases.

2.  A description of the reasonable alternatives (for example in terms of project design, technology, location, size and scale) studied by the undertaker, which are relevant to the relevant project and its specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.

3.  A description of the relevant aspects of the current state of the environment (baseline scenario) and an outline of the likely evolution thereof without implementation of the project as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.

4.  A description of the factors set out in Article 3(1) of the Directive likely to be significantly affected by the project: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape.

5.  A description of the likely significant effects of the project on the environment resulting from, inter alia—

(a)the construction and existence of the project, including, where relevant, demolition works;

(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;

(c)the emission of pollutants, noise, vibration, light, heat and radiation, the creation of nuisances, and the disposal and recovery of waste;

(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);

(e)the cumulation of effects with other existing or approved projects, taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;

(f)the impact of the project on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the project to climate change;

(g)the technologies and the substances used, and

these descriptions of the likely significant effects on the factors set out in Article 3(1) of the Directive must cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the project and should take into account environmental protection objectives established at EU or at national level relevant to the project.

6.  A description of the forecasting methods or evidence, used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.

7.  A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis).

8.  The description in paragraph 7 should explain the extent to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases.

9.  A description of the expected significant adverse effects of the relevant project on the environment deriving from the vulnerability of the project to risks of major accidents or disasters which are relevant to the project.

10.  Relevant information available and obtained through risk assessments pursuant to EU legislation such as Directive 2012/18/EU of the European Parliament and of the Council on the control of major accident hazards involving dangerous substances(3) or Council Directive 2009/71/Euratom establishing a community framework for the nuclear safety of nuclear installations(4) or relevant assessments carried out pursuant to national legislation may be used for describing the matters in paragraph 9, provided that the requirements of the Directive are met.

11.  In describing the matters in paragraph 9, the undertaker should, where appropriate, include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.

12.  A non-technical summary of the information provided under paragraphs 1 to 11.

13.  A reference list detailing the sources used for the descriptions and assessments included in the environmental statement.

Regulation 41

SCHEDULE 3U.K.

Commencement Information

I3Sch. 3 in force at 16.5.2017, see reg. 1

Regulation 2B

SCHEDULE 1U.K.Information for the Environmental Statement

1.  A description of the proposed pipe-line works, including in particular:

(a)a description of the location of the works;

(b)a description of the physical characteristics of the whole works, including, where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases;

(c)a description of the main characteristics of the operational phase of the works (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used;

(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) and quantities and types of waste produced during the construction and operation phases.

2.  A description of the reasonable alternatives (for example in terms of project design, technology, location, size and scale) studied by the gas transporter, which are relevant to the proposed pipe-line works and their specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.

3.  A description of the relevant aspects of the current state of the environment (baseline scenario) and an outline of the likely evolution thereof without implementation of the proposed pipe-line works as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.

4.  A description of the factors set out in Article 3(1) of the Directive likely to be significantly affected by the proposed pipe-line works: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape.

5.  A description of the likely significant effects of the proposed pipe-line works on the environment resulting from, inter alia:

(a)the construction and existence of the works, including, where relevant, demolition works;

(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;

(c)the emission of pollutants, noise, vibration, light, heat and radiation, the creation of nuisances, and the disposal and recovery of waste;

(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);

(e)the cumulation of effects with other existing or approved pipe-line works, taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;

(f)the impact of the works on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the works to climate change;

(g)the technologies and the substances used, and

these descriptions of the likely significant effects on the factors set out in Article 3(1) of the Directive must cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the works and should take into account environmental protection objectives established at EU or at national level relevant to the works.

6.  A description of the forecasting methods or evidence, used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.

7.  A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis).

8.  The description in paragraph 7 should explain the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases.

9.  A description of the expected significant adverse effects of the proposed pipe-line works on the environment deriving from the vulnerability of the works to risks of major accidents or disasters which are relevant to the works concerned.

10.  Relevant information available and obtained through risk assessments pursuant to EU legislation such as Directive 2012/18/EU of the European Parliament and of the Council on the control of major accident hazards involving dangerous substances or Council Directive 2009/71/Euratom establishing a community framework for the nuclear safety of nuclear installations or relevant assessments carried out pursuant to national legislation may be used for describing the matters in paragraph 9, provided that the requirements of the Directive are met.

11.  In describing the matters in paragraph 9, the gas transporter should, where appropriate, include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.

12.  A non-technical summary of the information provided under paragraphs 1 to 11.

13.  A reference list detailing the sources used for the descriptions and assessments included in the environmental statement.

Regulation 42

SCHEDULE 4U.K.

Commencement Information

I4Sch. 4 in force at 16.5.2017, see reg. 1

Regulations 2(1) and 6(7)

SCHEDULE 2U.K.MATTERS TO BE TAKEN INTO ACCOUNT IN MAKING AN ENVIRONMENTAL DETERMINATION OR GIVING A DIRECTION UNDER REGULATION 3(3)

Characteristics of proposed pipe-line works

1.  The characteristics of the proposed pipe-line works having regard, in particular, to—

(a)the size and design of the proposed pipe-line works and of the proposed pipe-line;

(b)the cumulation with other existing or approved pipe-line works;

(c)the use of natural resources in particular land, soil, water and biodiversity;

(d)the production of waste, pollution and nuisances;

(e)the risk of major accidents or disasters which are relevant to the proposed pipe-line works or to the proposed pipe-line, including those caused by climate change, in accordance with scientific knowledge; and

(f)the risks to human health (for example, due to water contamination or air pollution).

Location of proposed pipe-line works

2.  The environmental sensitivity of geographical areas likely to be affected by the proposed pipe-line works, having regard, in particular, to—

(a)the existing and approved land use;

(b)the relative abundance, availability, quality and regenerative capacity of natural resources (including soil, land, water and biodiversity) in the area and its underground;

(c)the absorption capacity of the natural environment, paying particular attention to the following areas—

(i)wetlands, riparian areas, river mouths;

(ii)coastal zones and the marine environment;

(iii)mountain and forest areas;

(iv)nature reserves and parks;

(v)areas classified or protected under national legislation, Natura 2000 areas designated by member states pursuant to Directive 92/43/EEC(5) or Directive 2009/147/EC(6);

(vi)areas in which there has already been a failure to meet the environmental quality standards laid down in EU legislation and relevant to the works or in which it is considered that there is such a failure;

(vii)densely populated areas; and

(viii)landscapes and sites of historical, cultural or archaeological significance.

Type and characteristics of the potential impact

3.  The likely significant effects of the proposed pipe-line works on the environment in relation to the criteria set out under paragraphs 1 and 2, and having regard in particular to the impact of the works on the factors specified in Article 3(1) of the Directive, taking into account—

(a)the magnitude and spatial extent of the impact (for example geographical area and size of the population likely to be affected);

(b)the nature of the impact;

(c)the transboundary nature of the impact;

(d)the intensity and complexity of the impact;

(e)the probability of the impact;

(f)the expected onset, duration, frequency and reversibility of the impact;

(g)the cumulation of the impact with the impact of other existing or approved pipe-line works; and

(h)the possibility of effectively reducing the impact.

Regulation 56

SCHEDULE 5U.K.

Commencement Information

I5Sch. 5 in force at 16.5.2017, see reg. 1

Regulation 2B

SCHEDULE 1U.K.Information for the Environmental Statement

1.  A description of the relevant pipe-line works, including in particular:

(a)a description of the location of the works;

(b)a description of the physical characteristics of the whole works, including, where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases;

(c)a description of the main characteristics of the operational phase of the works (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used;

(d)an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) and quantities and types of waste produced during the construction and operation phases.

2.  A description of the reasonable alternatives (for example in terms of project design, technology, location, size and scale) studied by the prospective applicant, which are relevant to the relevant pipe-line works and their specific characteristics, and an indication of the main reasons for selecting the chosen option, including a comparison of the environmental effects.

3.  A description of the relevant aspects of the current state of the environment (baseline scenario) and an outline of the likely evolution thereof without implementation of the relevant pipe-line works as far as natural changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of environmental information and scientific knowledge.

4.  A description of the factors set out in Article 3(1) of the Directive likely to be significantly affected by the relevant pipe-line works: population, human health, biodiversity (for example fauna and flora), land (for example land take), soil (for example organic matter, erosion, compaction, sealing), water (for example hydromorphological changes, quantity and quality), air, climate (for example greenhouse gas emissions, impacts relevant to adaptation), material assets, cultural heritage, including architectural and archaeological aspects, and landscape.

5.  A description of the likely significant effects of the relevant pipe-line works on the environment resulting from, inter alia:

(a)the construction and existence of the works, including, where relevant, demolition works;

(b)the use of natural resources, in particular land, soil, water and biodiversity, considering as far as possible the sustainable availability of these resources;

(c)the emission of pollutants, noise, vibration, light, heat and radiation, the creation of nuisances, and the disposal and recovery of waste;

(d)the risks to human health, cultural heritage or the environment (for example due to accidents or disasters);

(e)the cumulation of effects with other existing or approved pipe-line works, taking into account any existing environmental problems relating to areas of particular environmental importance likely to be affected or the use of natural resources;

(f)the impact of the works on climate (for example the nature and magnitude of greenhouse gas emissions) and the vulnerability of the works to climate change;

(g)the technologies and the substances used, and

these descriptions of the likely significant effects on the factors set out in Article 3(1) of the Directive must cover the direct effects and any indirect, secondary, cumulative, transboundary, short-term, medium-term and long-term, permanent and temporary, positive and negative effects of the works and should take into account environmental protection objectives established at EU or at national level relevant to the works.

6.  A description of the forecasting methods or evidence, used to identify and assess the significant effects on the environment, including details of difficulties (for example technical deficiencies or lack of knowledge) encountered compiling the required information and the main uncertainties involved.

7.  A description of the measures envisaged to avoid, prevent, reduce or, if possible, offset any identified significant adverse effects on the environment and, where appropriate, of any proposed monitoring arrangements (for example the preparation of a post-project analysis).

8.  The description in paragraph 7 should explain the extent, to which significant adverse effects on the environment are avoided, prevented, reduced or offset, and should cover both the construction and operational phases.

9.  A description of the expected significant adverse effects of the relevant pipe-line works on the environment deriving from the vulnerability of the works to risks of major accidents or disasters which are relevant to the works concerned.

10.  Relevant information available and obtained through risk assessments pursuant to EU legislation such as Directive 2012/18/EU of the European Parliament and of the Council on the control of major accident hazards involving dangerous substances(7) or Council Directive 2009/71/Euratom establishing a community framework for the nuclear safety of nuclear installations(8) or relevant assessments carried out pursuant to national legislation may be used for describing the matters in paragraph 9, provided that the requirements of the Directive are met.

11.  In describing the matters in paragraph 9, the applicant should, where appropriate, include measures envisaged to prevent or mitigate the significant adverse effects of such events on the environment and details of the preparedness for and proposed response to such emergencies.

12.  A non-technical summary of the information provided under paragraphs 1 to 11.

13.  A reference list detailing the sources used for the descriptions and assessments included in the environmental statement.

Regulation 57

SCHEDULE 6U.K.

Commencement Information

I6Sch. 6 in force at 16.5.2017, see reg. 1

Regulations 2 and 4

SCHEDULE 2U.K.MATTERS TO BE TAKEN INTO ACCOUNT IN GIVING A DIRECTION UNDER REGULATION 4(2)

Characteristics of relevant pipe-line works

1.  The characteristics of the relevant pipe-line works having regard, in particular, to—

(a)the size and design of the relevant pipe-line works and of the pipe-line;

(b)the cumulation with other existing or approved pipe-line works;

(c)the use of natural resources in particular land, soil, water and biodiversity;

(d)the production of waste, pollution and nuisances;

(e)the risk of major accidents or disasters which are relevant to the relevant pipe-line works or to the pipe-line, including those caused by climate change, in accordance with scientific knowledge; and

(f)the risks to human health (for example, due to water contamination or air pollution).

Location of relevant pipe-line works

2.  The environmental sensitivity of geographical areas likely to be affected by the relevant pipe-line works, having regard in particular, to—

(a)the existing and approved land use;

(b)the relative abundance, availability, quality and regenerative capacity of natural resources (including soil, land, water and biodiversity) in the area and its underground;

(c)the absorption capacity of the natural environment, paying particular attention to the following areas—

(i)wetlands, riparian areas, river mouths;

(ii)coastal zones and the marine environment;

(iii)mountain and forest areas;

(iv)nature reserves and parks;

(v)areas classified or protected under national legislation, Natura 2000 areas designated by member states pursuant to Directive 92/43/EEC or Directive 2009/147/EC;

(vi)areas in which there has already been a failure to meet the environmental quality standards laid down in EU legislation and relevant to the project or in which it is considered that there is such a failure;

(vii)densely populated areas; and

(viii)landscapes and sites of historical, cultural or archaeological significance.

Type and characteristics of the potential impact

3.  The likely significant effects of the relevant pipe-line works on the environment in relation to the criteria set out under paragraphs 1 and 2, and having regard in particular to the impact of the works on the factors specified in Article 3(1) of the Directive, taking into account—

(a)the magnitude and spatial extent of the impact (for example geographical area and size of the population likely to be affected);

(b)the nature of the impact;

(c)the transboundary nature of the impact;

(d)the intensity and complexity of the impact;

(e)the probability of the impact;

(f)the expected onset, duration, frequency and reversibility of the impact;

(g)the cumulation of the impact with the impact of other existing or approved developments; and

(h)the possibility of effectively reducing the impact.

(1)

OJ L 206 22.7.92 p.7.

(2)

OJ L 20 26.1.2010. p.7.

(3)

OJ L 197 24.7.2012. p.1

(4)

OJ L 172 2.7.2009. p.18.

(5)

OJ L 206 22.7.92 p.7

(6)

OJ L 20 26.1.2010. p.7.

(7)

OJ L 197 24.7.2012. p.1.

(8)

OJ L 172 2.7.2009. p.18.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill