Chwilio Deddfwriaeth

The Lake Lothing (Lowestoft) Third Crossing Order 2020

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

PART 1SPEED LIMITS AND RESTRICTED ROADS

Note 1: Where roads are to become restricted roads as indicated in this Schedule (Part 1) and as shown on the plans relating to this Schedule (the traffic regulation measures plans (speed limits and restricted roads)), speed limits are to apply in accordance with the provision of the 1984 Act (which defines speed limits of 30mph on ‘restricted’ roads by reference to street lighting).

Note 2: Where existing speed limits (to be retained) are shown on the traffic regulation measures plans (speed limits and restricted roads) (sheets 1 and 2) which relate to Part 1 of this Schedule, this is for information only and such speed limits are not subject to this Order.

(1)

Area

(2)

Road name number and length

(3)

Speed limit and restricted roads status

The traffic regulation measures (speed limits and restricted roads) plans – sheet 1
In the administrative area of East Suffolk Council

A12 Lake Lothing Third Crossing

A length of new highway from a point on the existing C970 Peto Way 135 metres to the east of the existing roundabout junction of Rotterdam Road and Denmark Road in a south easterly direction to a point where it joins the A12 Lake Lothing Third Crossing Northern Roundabout along both the northbound and southbound carriageways.

Restricted road

A12 Lake Lothing Third Crossing Northern Roundabout

A length of new highway comprising the A12 Lake Lothing Third Crossing Northern Roundabout along the entire length of the circulatory carriageway.

Restricted road

A12 Lake Lothing Third Crossing

A length of new highway from a point where it departs from the new A12 Lake Lothing Third Crossing Northern Roundabout to a point where it joins the existing roundabout junction of Rotterdam Road and Denmark Road along both the northbound and southbound carriageways.

Restricted road
The traffic regulation measures (speed limits and restricted roads) plans – sheets 1 and 2
In the administrative area of East Suffolk Council

A12 Lake Lothing Third Crossing

A length of new highway from a point where it departs from the new A12 Lake Lothing Third Crossing Northern Roundabout in a generally southerly direction for a distance of 604 metres to a point where it joins the new A12 Lake Lothing Third Crossing Southern Roundabout along both the northbound and southbound carriageways.

Restricted road
The traffic regulation measures (speed limits and restricted roads) plans – sheet 2
In the administrative area of East Suffolk Council

A12 Lake Lothing Third Crossing Southern Roundabout

A length of improved highway comprising the Lake Lothing Third Crossing Southern Roundabout along the entire length of the circulatory carriageway.

Restricted road

B1531 Waveney Drive

A length of improved carriageway comprising the western spur of the new Lake Lothing Third Crossing Southern Roundabout in a westerly direction for a distance of 43 metres along both the westbound and eastbound carriageways.

Restricted road

A12 Lake Lothing Third Crossing

A length of improved carriageway comprising the eastern spur of the new Lake Lothing Third Crossing Southern Roundabout in an easterly direction for a distance of 33 metres, along both the westbound and eastbound carriageways.

Restricted road

New Access Road from Waveney Drive to Riverside Road

A length of new highway from a point on Waveney Drive 95 metres east of its junction with Waveney Crescent west, in a generally northerly direction for a distance of 236 metres and then in a generally easterly direction towards Riverside Road, for a distance of 158 metres.

Restricted road

Canning Road

A length of new highway from a point on the existing Riverside Road 37 metres east of the entrance to premises known as Riverside (4 Canning Road), in a generally southerly direction for a distance of 90 metres to its junction with the improved Canning Road along both the northbound and southbound carriageways.

Restricted road

Canning Road Roundabout

A length of improved highway on the existing Canning Road, comprising a new roundabout and improved access to premises known as Riverside (4 Canning Road) along the entire length of the circulatory carriageway and access.

Restricted road

New Access Road to Control Tower and Nexen Group premises

A length of new highway from a point on the existing Riverside Road 55 metres east of the northern entrance to premises known as Riverside (4 Canning Road), in a generally north-easterly direction and forming a turning head for the Control Tower and providing new highway access to land on the east side of the new bridge southern approach (being premises occupied by Nexen), for a distance of 50 metres on the northbound and southbound carriageways.

Proposed 30mph Speed Limit

Yn ôl i’r brig

Options/Cymorth

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill