Chwilio Deddfwriaeth

The Lake Lothing (Lowestoft) Third Crossing Order 2020

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

  1. Introductory Text

  2. PART 1 PRELIMINARY

    1. 1.Citation and commencement

    2. 2.Interpretation

    3. 3.Disapplication of legislation, etc.

  3. PART 2 WORKS PROVISIONS

    1. Principal powers

      1. 4.Development consent, etc., granted by the Order

      2. 5.Limits of deviation

    2. Streets

      1. 6.Street works

      2. 7.Application of the 1991 Act

      3. 8.Construction and maintenance of new, altered or diverted streets and other structures

      4. 9.Classification of roads, etc.

      5. 10.Permanent stopping up of streets and private means of access

      6. 11.Temporary stopping up and restriction of use of streets

      7. 12.Access to works

      8. 13.Agreements with street authorities

      9. 14.Use of private roads for construction

    3. Supplemental powers

      1. 15.Discharge of water

      2. 16.Protective works to buildings

      3. 17.Authority to survey and investigate land

      4. 18.Felling or lopping of trees

      5. 19.Trees subject to tree preservation orders

      6. 20.Temporary suspension of navigation within Lake Lothing in connection with the authorised development

      7. 21.Removal of vessels

  4. PART 3 POWERS OF ACQUISITION AND POSSESSION OF LAND

    1. Powers of acquisition

      1. 22.Compulsory acquisition of land

      2. 23.Crown land

      3. 24.Compulsory acquisition of land – incorporation of the mineral code

      4. 25.Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily

      5. 26.Compulsory acquisition of rights, etc.

      6. 27.Acquisition of subsoil and airspace only

      7. 28.Private rights over land

      8. 29.Power to override easements and other rights

      9. 30.Rights over or under streets

      10. 31.Application of the 1981 Act

      11. 32.Modification of the 1965 Act

    2. Temporary possession of land

      1. 33.Temporary use of land for carrying out the authorised development

      2. 34.Temporary use of land for maintaining the authorised development

    3. Supplementary

      1. 35.Statutory undertakers and utilities

      2. 36.Apparatus and rights of statutory undertakers and utilities in stopped up streets

      3. 37.Recovery of costs of new connection

    4. Compensation

      1. 38.Disregard of certain interests and improvements

      2. 39.Set-off for enhancement in value of retained land

      3. 40.No double recovery

  5. PART 4 OPERATIONAL PROVISIONS

    1. 41.Operation of the new bridge

    2. 42.Extinguishment of right of navigation within Lake Lothing in connection with authorised development

    3. 43.Maintenance of authorised development

    4. 44.Subsidiary works and operations in Lake Lothing

    5. 45.Protection against dredging by the harbour authority

    6. 46.Byelaws

    7. 47.Fixed penalty notices

  6. PART 5 MISCELLANEOUS AND GENERAL

    1. 48.Benefit of Order

    2. 49.Transfer of benefit of Order, etc.

    3. 50.Planning permission

    4. 51.Saving for undertaker’s highway and planning functions

    5. 52.Application of landlord and tenant law

    6. 53.Traffic regulation measures

    7. 54.Clearways

    8. 55.Deemed marine licence

    9. 56.Defence to proceedings in respect of statutory nuisance

    10. 57.Crown rights

    11. 58.Protective provisions

    12. 59.Saving for Trinity House

    13. 60.Certification of documents

    14. 61.Service of notices

    15. 62.Arbitration

    16. 63.Consents, agreements, certifications and approvals

  7. Signature

  8. SCHEDULES

    1. SCHEDULE 1

      AUTHORISED DEVELOPMENT

      1. In the administrative area of East Suffolk Council

    2. SCHEDULE 2

      REQUIREMENTS

      1. PART 1 REQUIREMENTS

        1. 1.Interpretation

        2. 2.Time limit for commencement of the authorised development

        3. 3.Design of the authorised development

        4. 4.Code of construction practice

        5. 5.Landscaping scheme

        6. 6.Surface water drainage

        7. 7.Highways lighting

        8. 8.Contaminated land and groundwater

        9. 9.Mooring

        10. 10.Written schemes of investigation

        11. 11.Navigation risk assessment

        12. 12.Traffic mitigation

        13. 13.Piling works risk assessment

        14. 14.New bridge operating signals

        15. 15.Amendment to approved details

      2. PART 2 PROCEDURE FOR DISCHARGE OF REQUIREMENTS

        1. 16.Interpretation

        2. 17.Applications made under requirements

        3. 18.Further information regarding requirements

        4. 19.Appeals

        5. 20.Publication of requirements

        6. 21.Anticipatory steps towards compliance with any requirement

    3. SCHEDULE 3

      CLASSIFICATION OF ROADS, ETC

      1. PART 1 A12 AND A146

        1. 1.A12 Waveney Drive

        2. 2.A12 Lake Lothing Third Crossing Southern Roundabout

        3. 3.A12 Riverside Road

        4. 4.A12 Lake Lothing Third Crossing

        5. 5.A12 Lake Lothing Third Crossing Northern Roundabout

        6. 6.A12 Lake Lothing Third Crossing Northern Roundabout western arm (to and from Peto Way)

        7. 7.A12 Roundabout (existing junction of Peto Way (C970), Barnards Way and North Quay Retail Park)

        8. 8.A12 Peto Way

        9. 9.A12 Roundabout (existing junction of Peto Way (C970), Barnards Way and North Quay Retail Park)

        10. 10.A12 Peto Way

        11. 11.A12 Roundabout (existing junction of Peto Way (C970) and Peto Way (A1117) with Normanston Drive (A1117) and Normanston Drive (A1144))

        12. 12.A12 Peto Way

        13. 13.A12 Roundabout (existing junction of Oulton Road, Millennium Way and Peto Way)

        14. 14.A12 Millennium Way

        15. 15.A12 Roundabout (existing junction of Millennium Way, Bentley Drive and Park Meadows)

        16. 16.A12 Millennium Way

        17. 17.A146 Bridge Road

        18. 18.A146 Roundabout (existing junction of Saltwater Way (A1117), Bridge Road (A1117) and Victoria Road (B1531)

        19. 19.A146 Saltwater Way

        20. 20.A146 Bridge Road

        21. 21.A146 Roundabout (existing junction of Bridge Road (A1117) and Commodore Road)

        22. 22.A146 Bridge Road

        23. 23.A146 Roundabout (existing junction of Bridge Road (A1117), Gorleston Road (B1375) and Normanston Drive (A1117))

        24. 24.A146 Normanston Drive

      2. PART 2 OTHER ROADS

        1. 25.C970 Lake Lothing Third Crossing Northern Roundabout northern arm (to/from Denmark Road)

        2. 26.Canning Road

        3. 27.New Access Road

    4. SCHEDULE 4

      PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS AND PROVISION OF NEW HIGHWAYS AND PRIVATE MEANS OF ACCESS

      1. PART 1 HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED

      2. PART 2 PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED

      3. PART 3 PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

    5. SCHEDULE 5

      TREES SUBJECT TO TREE PRESERVATION ORDERS

    6. SCHEDULE 6

      LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED

      1. PART 1 LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED

      2. PART 2 RIGHTS FOR THE BENEFIT OF CADENT

    7. SCHEDULE 7

      MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS

      1. 1.Compensation enactments

      2. 2.(1) Without limitation on the scope of paragraph 1, the...

      3. 3.(1) Without limitation on the scope of paragraph 1, the...

      4. 4.Application of the 1965 Act

      5. 5.(1) The modifications referred to in paragraph 4(a) are as...

    8. SCHEDULE 8

      LAND IN WHICH ONLY AIRSPACE AND NEW RIGHTS MAY BE ACQUIRED

    9. SCHEDULE 9

      LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN

    10. SCHEDULE 10

      THE LOWESTOFT THIRD CROSSING BYELAWS 2020

      1. PART 1 PRELIMINARY

        1. 1.Citation and commencement

        2. 2.Interpretation

      2. PART 2 CONDUCT AND BEHAVIOUR

        1. 3.Smoking etc.

        2. 4.Unacceptable behaviour

      3. PART 3 ACCESS AND TRAFFIC

        1. 5.Unauthorised access and loitering

        2. 6.Traffic regulation

      4. PART 4 GENERAL

        1. 7.Saving for appointed persons

    11. SCHEDULE 11

      TRAFFIC REGULATION MEASURES

      1. PART 1 SPEED LIMITS AND RESTRICTED ROADS

      2. PART 2 TRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS)

      3. PART 3 REVOCATIONS AND VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS

    12. SCHEDULE 12

      DEEMED MARINE LICENCE

      1. PART 1 GENERAL

        1. 1.Interpretation

        2. 2.(1) Except where otherwise indicated, the main point of contact...

        3. 3.Details of licensed marine activities

      2. PART 2 CONDITIONS APPLYING TO CONSTRUCTION ACTIVITIES

        1. 4.Construction method statement

        2. 5.Post construction

      3. PART 3 CONDITIONS APPLYING TO MAINTENANCE DREDGING TO BE UNDERTAKEN POST CONSTRUCTION

        1. 6.Maintenance dredging method statement

      4. PART 4 CONDITIONS APPLYING TO ALL LICENSABLE ACTIVITIES INCLUDING CONSTRUCTION ACTIVITIES AND MAINTENANCE DREDGING ACTIVITIES

        1. 7.Notification of commencement and completion of construction activities only

        2. 8.Marine pollution contingency plan

        3. 9.Vessels

        4. 10.Concrete and cement

        5. 11.Coatings and treatments

        6. 12.Spills, etc.

        7. 13.Scheme-wide written scheme of investigation

        8. 14.Dropped objects

        9. 15.Disposal at sea

        10. 16.The licence holder must not dispose of any dredged materials...

        11. 17.The licence holder must inform the MMO of the location...

        12. 18.The material to be disposed of within the disposal site...

        13. 19.During the course of disposal at sea, material must be...

      5. PART 5 PROCEDURE FOR THE DISCHARGE OF CONDITIONS

        1. 20.Meaning of “application”

        2. 21.Further information regarding application

        3. 22.Determination of application

        4. 23.Notice of determination

    13. SCHEDULE 13

      PROTECTIVE PROVISIONS

      1. PART 1 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS

        1. 1.The provisions of this Part of this Schedule have effect...

        2. 2.In this Part of this Schedule— “alternative apparatus” means alternative...

        3. 3.This Part of this Schedule does not apply to apparatus...

        4. 4.(1) Regardless of the temporary stopping up, alteration or diversion...

        5. 5.Despite any provision in this Order or anything shown on...

        6. 6.(1) If, in the exercise of the powers conferred by...

        7. 7.(1) Where, in accordance with the provisions of this Part...

        8. 8.(1) Not less than 28 days before starting the carrying...

        9. 9.(1) Subject to the following provisions of this paragraph, the...

        10. 10.(1) Subject to sub-paragraphs (2) and (3), if by reason...

        11. 11.If in consequence of the exercise of the powers conferred...

      2. PART 2 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS

        1. 12.(1) For the protection of any operator, the following provisions...

        2. 13.The exercise of the powers of article 35 (statutory undertakers...

        3. 14.(1) Subject to sub-paragraphs (2) to (3), if as the...

        4. 15.Any difference arising between the undertaker and the operator under...

        5. 16.This Part of this Schedule does not apply to—

      3. PART 3 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY

        1. 17.The following provisions of this Part of this Schedule apply...

        2. 18.In this Part of this Schedule— “the Agency” means the...

        3. 19.(1) Before beginning to construct any specified work, the undertaker...

        4. 20.The undertaker must give to the Agency notice in writing...

        5. 21.(1) If any part of a specified work or any...

        6. 22.(1) Subject to sub-paragraph (6) the undertaker must from the...

        7. 23.Subject to paragraph 26, if by reason of the construction...

        8. 24.If by reason of construction of the specified work the...

        9. 25.(1) The undertaker must take all such measures as may...

        10. 26.(1) The undertaker must indemnify the Agency in respect of...

        11. 27.(1) The undertaker is responsible for and must indemnify the...

        12. 28.The Agency must give to the undertaker reasonable notice of...

        13. 29.The fact that any work or thing has been executed...

        14. 30.Any difference or dispute arising between the Agency and the...

      4. PART 4 FOR THE PROTECTION OF RAILWAY INTERESTS

        1. 31.The provisions of this Part of this Schedule have effect,...

        2. 32.In this Part of this Schedule— “construction” includes execution, placing,...

        3. 33.(1) Where under this Part of this Schedule Network Rail...

        4. 34.(1) The undertaker must not exercise the powers conferred by...

        5. 35.(1) The undertaker must before commencing construction of any specified...

        6. 36.(1) Any specified work and any protective works to be...

        7. 37.The undertaker must— (a) at all times afford reasonable facilities...

        8. 38.Network Rail must at all times afford reasonable facilities to...

        9. 39.(1) If any permanent or temporary alterations or additions to...

        10. 40.The undertaker must repay to Network Rail all reasonable fees,...

        11. 41.(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...

        12. 42.If at any time after the completion of a specified...

        13. 43.The undertaker must not provide any illumination or illuminated sign...

        14. 44.Any additional expenses which Network Rail may reasonably incur in...

        15. 45.(1) The undertaker must pay to Network Rail all reasonable...

        16. 46.Network Rail must, on receipt of a request from the...

        17. 47.In the assessment of any sums payable to Network Rail...

        18. 48.The undertaker and Network Rail may, subject in the case...

        19. 49.Nothing in this Order, or in any enactment incorporated with...

        20. 50.The undertaker must give written notice to Network Rail if...

        21. 51.The undertaker must no later than 28 days from the...

        22. 52.In relation to any dispute arising under this Part of...

      5. PART 5 FOR THE PROTECTION OF THE HARBOUR AUTHORITY

        1. 53.For the protection of the harbour authority the provisions of...

        2. 54.In this Part of this Schedule— “accumulation” means any accumulation...

        3. 55.(1) The undertaker must not, under the powers conferred by...

        4. 56.(1) At least 56 days before commencing the construction or...

        5. 57.The undertaker must at all reasonable times during construction of...

        6. 58.(1) After the purpose of any temporary works has been...

        7. 59.(1) If during the construction of a tidal work or...

        8. 60.The undertaker must pay to the harbour authority the reasonable...

        9. 61.The undertaker must, at or near a specified work, exhibit...

        10. 62.The undertaker must comply with any reasonable directions issued from...

        11. 63.(1) If any tidal work of which the undertaker is...

        12. 64.(1) Without limiting the other provisions of this Part, the...

        13. 65.The fact that any work or thing has been executed...

        14. 66.Save to the extent expressly provided for nothing in this...

        15. 67.With the exception of any duty owed by the harbour...

        16. 68.Any difference or dispute arising under this Part must, unless...

      6. PART 6 FOR THE PROTECTION OF ANGLIAN WATER

        1. 69.The following provisions of this Part of this Schedule have...

        2. 70.In this Part of this Schedule— “alternative apparatus” means alternative...

        3. 71.The undertaker must not interfere with, build over or near...

        4. 72.The alteration, extension, removal or re-location of any apparatus must...

        5. 73.In the situation, where in exercise of the powers conferred...

        6. 74.Regardless of any provision in this Order or anything shown...

        7. 75.If in consequence of the exercise of the powers conferred...

        8. 76.If in consequence of the exercise of the powers conferred...

        9. 77.If for any reason or in consequence of the construction...

      7. PART 7 FOR THE PROTECTION OF CADENT GAS LIMITED

        1. 78.Application

        2. 79.Interpretation

        3. 80.On Street Apparatus

        4. 81.Apparatus of Cadent in stopped up streets

        5. 82.Protective works to buildings

        6. 83.Acquisition of land

        7. 84.Removal of apparatus

        8. 85.Facilities and rights for alternative apparatus

        9. 86.Retained apparatus: protection

        10. 87.Expenses

        11. 88.Indemnity

        12. 89.Enactments and agreements

        13. 90.Co-operation

        14. 91.Access

        15. 92.Arbitration

    14. SCHEDULE 14

      DOCUMENTS TO BE CERTIFIED

  9. Explanatory Note

Yn ôl i’r brig

Options/Cymorth

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill