Chwilio Deddfwriaeth

The M42 Junction 6 Development Consent Order 2020

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: SCHEDULE 8

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The M42 Junction 6 Development Consent Order 2020, SCHEDULE 8. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 27(2)

SCHEDULE 8E+WLAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Commencement Information

I1Sch. 8 in force at 11.6.2020, see art. 1

(1)

Plot Reference Number shown on Land Plans

(2)

Purpose for which rights over land may be acquired

Land Plans – Sheet 2
2/2c, 2/3cTo construct, operate, access and maintain a diversion to an existing local high pressure gas main (Work No. 55).
2/3o, 2/10c, 2/29, 2/30To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 3).
2/3u, 2/3ahTo construct, operate, access and maintain diversion to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).
To construct, operate, access and maintain a reinforced cover slab for an existing fuel pipeline (Work No. 66) and to maintain access to the pipeline.
2/3aaTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).
Land Plans – Sheet 3
3/4bTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).
3/4fTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).
3/22a, 3/22bTo access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI - Shadowbrook Meadows unit (Work No.76).
3/23, 3/73d, 3/73fTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
3/25To access land to be used for the provision, maintenance and retention of mitigation in connection with Bickenhill Meadows site of special scientific interest (works associated with the authorised development).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
3/87aTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
Land Plans – Sheet 4
4/1c, 4/1bf, 4/3b, 4/3c, 4/3s, 4/3x, 4/3ai, 4/3aj, 4/6n, 4/6p, 4/9, 4/10, 4/158, 4/159To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1d, 4/25aTo access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).
4/1fTo access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1gTo take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20).
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1h, 4/1m, 4/1q, 4/1s, 4/1t, 4/1u, 4/1v, 4/1w, 4/1x, 4/1am, 4/1ap, 4/1as, 4/1bb, 4/3e. 4/3f, 4/3g, 4/3h, 4/3j, 4/3k, 4/3m, 4/3ab, 4/3ae, 4/4g, 4/4n, 4/4v, 4/4x, 4/6b, 4/6e, 4/6f, 4/6g, 4/6h, 4/7a, 4/11a, 4/25b, 4/25d, 4/25e, 4/25g, 4/25i, , 4/25l, 4/25m, 4/25s, 4/62, 4/66, 4/69, 4/71, 4/73, 4/76, 4/80, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/147, 4/150, 4/151, 4/152, 4/153, 4/155To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/1kTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).
4/25o, 4/25j, 4/25p, 4/25nTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39 and the installation of a new gantry (Work No. 2)).
4/1n, 4/1r, 4/82To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39).
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/lzTo take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20).
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
4/1ab, 4/1acTo take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
4/1aq, 4/1bcTo construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development).
4/1az, 4/1baTo construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).
4/2a, 4/3afTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
4/3dTo take access to and over land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).
To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/3i, 4/3lTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Works Nos. 2 and 20).
4/3o, 4/3pTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 2).
4/3yTo access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21).
4/3ah, 4/4k, 4/4u, 4/4w, 4/25q, 4/25u, 4/149, 4/160To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/6a, 4/156To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21).
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59).
To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).
4/6dTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39).
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (Works Nos. 56, 64 and 65).
4/25fTo construct, operate, access and maintain a gantry forming part of Work No. 2a
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
4/59To construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development).
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with authorised development).
Land Plans – Sheet 5
5/1b, 5/29h,To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
5/29c, 5/2h and 5/29uRequired for access to and construction of a new free flow single carriageway (Work No.26).
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).
5/7To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill