Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Article 27(2)
Commencement Information
I1Sch. 8 in force at 11.6.2020, see art. 1
(1) Plot Reference Number shown on Land Plans | (2) Purpose for which rights over land may be acquired |
---|---|
Land Plans – Sheet 2 | |
2/2c, 2/3c | To construct, operate, access and maintain a diversion to an existing local high pressure gas main (Work No. 55). |
2/3o, 2/10c, 2/29, 2/30 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 3). |
2/3u, 2/3ah | To construct, operate, access and maintain diversion to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62). |
To construct, operate, access and maintain a reinforced cover slab for an existing fuel pipeline (Work No. 66) and to maintain access to the pipeline. | |
2/3aa | To access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33). |
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62). | |
Land Plans – Sheet 3 | |
3/4b | To access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33). |
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62). | |
3/4f | To access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33). |
3/22a, 3/22b | To access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI - Shadowbrook Meadows unit (Work No.76). |
3/23, 3/73d, 3/73f | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). |
3/25 | To access land to be used for the provision, maintenance and retention of mitigation in connection with Bickenhill Meadows site of special scientific interest (works associated with the authorised development). |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
3/87a | To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). |
Land Plans – Sheet 4 | |
4/1c, 4/1bf, 4/3b, 4/3c, 4/3s, 4/3x, 4/3ai, 4/3aj, 4/6n, 4/6p, 4/9, 4/10, 4/158, 4/159 | To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59). |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/1d, 4/25a | To access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20). |
4/1f | To access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). |
To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24). | |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/1g | To take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20). |
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). | |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/1h, 4/1m, 4/1q, 4/1s, 4/1t, 4/1u, 4/1v, 4/1w, 4/1x, 4/1am, 4/1ap, 4/1as, 4/1bb, 4/3e. 4/3f, 4/3g, 4/3h, 4/3j, 4/3k, 4/3m, 4/3ab, 4/3ae, 4/4g, 4/4n, 4/4v, 4/4x, 4/6b, 4/6e, 4/6f, 4/6g, 4/6h, 4/7a, 4/11a, 4/25b, 4/25d, 4/25e, 4/25g, 4/25i, , 4/25l, 4/25m, 4/25s, 4/62, 4/66, 4/69, 4/71, 4/73, 4/76, 4/80, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/147, 4/150, 4/151, 4/152, 4/153, 4/155 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). |
4/1k | To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60). |
4/25o, 4/25j, 4/25p, 4/25n | To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39 and the installation of a new gantry (Work No. 2)). |
4/1n, 4/1r, 4/82 | To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39). |
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60). | |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/lz | To take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20). |
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). | |
4/1ab, 4/1ac | To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). |
4/1aq, 4/1bc | To construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development). |
4/1az, 4/1ba | To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63). |
4/2a, 4/3af | To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). |
4/3d | To take access to and over land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20). |
To take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22). | |
To take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24). | |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/3i, 4/3l | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Works Nos. 2 and 20). |
4/3o, 4/3p | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 2). |
4/3y | To access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20). |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21). | |
4/3ah, 4/4k, 4/4u, 4/4w, 4/25q, 4/25u, 4/149, 4/160 | To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63). |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/6a, 4/156 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21). |
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59). | |
To construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63). | |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). | |
4/6d | To access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39). |
To construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60). | |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (Works Nos. 56, 64 and 65). | |
4/25f | To construct, operate, access and maintain a gantry forming part of Work No. 2a |
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). | |
4/59 | To construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development). |
To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with authorised development). | |
Land Plans – Sheet 5 | |
5/1b, 5/29h, | To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). |
5/29c, 5/2h and 5/29u | Required for access to and construction of a new free flow single carriageway (Work No.26). |
To construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65). | |
5/7 | To construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development). |
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: