The Thurrock Flexible Generation Plant Development Consent Order 2022

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol).

PART 1PRELIMINARY

Citation and commencement

1.  This Order may be cited as the Thurrock Flexible Generation Plant Development Consent Order 2022 and comes into force on 10th March 2022.

Interpretation

2.—(1) In this Order except where provided otherwise—

“1961 Act” means the Land Compensation Act 1961(1);

“1965 Act” means the Compulsory Purchase Act 1965(2);

“1980 Act” means the Highways Act 1980(3);

“1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981(4);

“1984 Act” means the Road Traffic Regulation Act 1984(5);

“1990 Act” means the Town and Country Planning Act 1990(6);

“1991 Act” means the New Roads and Street Works Act 1991(7);

“2008 Act” means the Planning Act 2008(8);

“address” includes any number or address used for the purposes of electronic transmission;

“the access, rights of way and traffic management plans” means the plans certified as such by the Secretary of State for the purposes of this Order under article 38;

“apparatus” has the same meaning as in section 105(1) of the 1991 Act;

“authorised development” means the development and associated development described in Schedule 1 (authorised development), which is development within the meaning of section 32 of the 2008 Act;

“book of reference” means the document approved in accordance with requirement 30 and certified by the Secretary of State as the book of reference for the purposes of the Order;

“building” includes any structure or erection or any part of a building, structure or erection;

“carriageway” has the same meaning as in the 1980 Act;

“commence” means carry out a material operation, as defined in section 155 of the 2008 Act (which explains when development begins), comprised in or for the purposes of the authorised development other than the permitted preliminary works and “commencement”, “commenced” and cognate expressions are to be construed accordingly;

“completion” means the date on which the authorised development commences operation by generating power on a commercial basis, but excluding the generation of power during commissioning, and “complete” and “completed” and cognate expressions are to be construed accordingly;

“conceptual drainage strategy” means the document certified as such by the Secretary of State for the purposes of this Order;

“design principles statement” means the document certified by the Secretary of State as the design principles statement for the purposes of this Order;

“electronic transmission” means a communication transmitted—

(a)

by means of an electronic communications network; or

(b)

by other means but while in electronic form;

“environmental statement” means the documents certified by the Secretary of State as the environmental statement for the purposes of this Order;

“highway authority” means Thurrock Borough Council;

“Highways England” means Highways England Company Limited (company number 09346363), whose registered office is at Bridge House, Walnut Tree Close, Guildford, GU1 4LZ;

“the illustrative cross section plans” means the document certified as the illustrative cross section plans by the Secretary of State for the purposes of the Order;

“the illustrative landscape plan” means the document certified as the illustrative landscape plan by the Secretary of State for the purposes of the Order;

“the land plans and special category land plans” means the document approved under requirement 30 and certified as the land plans and special category land plans by the Secretary of State for the purposes of this Order;

“maintain” includes inspect, repair, adjust or alter the authorised development, and remove, reconstruct or replace any part, provided that such works do not give rise to any materially new or materially different environmental effects to those identified in the environmental statement; and any derivative of “maintain” is to be construed accordingly;

“NGET” means National Grid Electricity Transmission Plc (company number 02366977), whose registered office is at 1 to 3 Strand, London, WC2N 5EH;

“NGG” means National Grid Gas Plc (company number 02006000), whose registered offices is at 1 to 3 Strand, London, WC2N 5EH;

“Order land” means the land which is required for the authorised development shown on the land plans and described in the book of reference;

“Order limits” means the limits shown on the works plans within which the authorised development may be carried out;

“outline code of construction practice” means the document certified as the outline code of construction practice by the Secretary of State for the purposes of the Order;

“outline construction traffic management plan” means the document certified as the outline construction traffic management plan by the Secretary of State for the purposes of the Order;

“outline construction worker travel plan” means the document certified as the outline construction worker travel plan by the Secretary of State for the purposes of the Order;

“outline ecological management plan” means the document certified as the outline ecological management plan by the Secretary of State for the purposes of the Order;

“outline employment and skills strategy” means the document certified as the outline local employment and skills strategy by the Secretary of State for the purposes of the Order;

“outline written scheme of archaeological investigation” means the document certified as the outline written scheme of archaeological investigation by the Secretary of State for the purposes of the Order;

“owner” in relation to land, has the same meaning as in section 7 of the Acquisition of Land Act 1981(9);

“permitted preliminary works” means all or any of—

(a)

environmental surveys, geotechnical surveys, intrusive archaeological surveys and other investigations;

(b)

above ground site preparation for temporary facilities for the use of contractors;

(c)

the provision of temporary means of enclosure and site security for construction;

(d)

the temporary display of site notices or advertisements;

(e)

protected species relocation in accordance with a relevant licence;

(f)

infilling of ditches and creation of new ditches; and

(g)

site clearance (including vegetation removal, vegetation management to create or enhance habitat);

“plot” means the plots listed in the book of reference and shown on the land plans;

“the port” means

(a)

any land (including land covered by water) within the Port of Tilbury which is owned or used by Port of Tilbury London Limited for the purposes of its statutory undertaking; as at the date of the Order;

(b)

the Work no. 15 land; and

(c)

any land within the limits of deviation of Work nos. 12(a), 12(c), 12(d) and 12(e), and any land comprised in plots 01/09, 01/10 and 01/15 shown on the land plans and special category land plans, in which Port of Tilbury London Limited holds an interest,

together with any quays, jetties, docks, river walls and other land (including land covered by water) or works held in connection with that undertaking;

“Port of Tilbury London Limited” means the statutory harbour authority for and operator of the Port of Tilbury, London;

“relevant planning authority” means Thurrock Borough Council;

“replacement land” means the land forming plot 01/07 listed in the book of reference and shown on the special category land plan of the land plans as replacement common land;

“requirement” means those matters set out in Schedule 2 (requirements) and a reference to a numbered requirement is a reference to the requirement set out in the paragraph of that Schedule with the same number;

“RWE” means RWE Generation UK Plc, company number 03892782, whose registered office is at Windmill Hill Business Park, Whitehill Way, Swindon, Wiltshire SN5 6PB;

“special category land” means the land registered as common land under the Commons Registration Act 1965 and shown on the special category land plan of the land plans;

“statutory undertaker” has the same meaning as set out in section 127(8) of the 2008 Act and a public communications provider as defined in section 151 of the Communications Act 2003(10);

“street” means a street within the meaning of section 48 of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes any footpath and any part of a street;

“street authority” in relation to street, has the same meaning as in part 3 of the 1991 Act;

“the tribunal” means the Lands Chamber of the Upper Tribunal;

“the undertaker” means Thurrock Power Limited, company number 10917470, whose registered office is at 1st Floor, 145 Kensington Church Street, London, W8 7LP;

“watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain;

“work” means a work set out in Schedule 1; and a reference to a work designated by a number, or by a combination of letters and numbers, is a reference to the work so designated in that Schedule;

“working day” means any day other than a Saturday, Sunday, or English bank or public holiday;

“Work no.15 land” means the land within the limits of deviation of Work no. 15 owned by Port of Tilbury London Limited; and

“works plans” means the plans certified by the Secretary of State as the works plans for the purposes of this Order.

(2) Reference in this Order to rights over land include references to rights to do or to place and maintain anything in, on, or under land, or in the airspace above its surface, and to any trusts or incidents (including restrictive covenants) to which the land is subject, and references in this Order to the creation or acquisition of new rights include the imposition of restrictive covenants which interfere with the interests or rights of another and are for the benefit of the land which is acquired under this Order or is otherwise comprised in the Order.

(3) All distances, directions and lengths referred to in this Order are approximate and distances between points on a work are taken to be measured along that work.

(4) In this Order “includes” must be construed without limitation.

(5) References in this Order to any statutory body include that body’s successor bodies as from time to time have jurisdiction in relation to the authorised development.

(6) All areas described in square metres in the book of reference are approximate.

PART 2PRINCIPAL POWERS

Development consent etc. granted by the Order

3.  Subject to the provisions of this Order, including the requirements, the undertaker is granted development consent for the authorised development to be carried out within the Order limits.

Limits of deviation

4.—(1) The undertaker must construct the authorised development within the Order limits shown on the works plans.

(2) In constructing or maintaining the authorised development, the undertaker may deviate laterally from the indicative centrelines or situations of the authorised development shown on the works plans to the extent of the limits of deviation for each work shown on those plans and vertically from the levels of the authorised development shown on the illustrative cross section plans—

(a)upwards only within the parameters for the relevant work set out in table 1 in requirement 4; or

(b)downwards to any distance.

Maintenance of authorised development

5.—(1) Subject to sub-paragraph (2), the undertaker may at any time maintain the authorised development, except to the extent that this Order, or an agreement made under this Order, provides otherwise.

(2) This article only authorises the carrying out of maintenance works within the Order limits.

Operation of generating station

6.—(1) The undertaker is authorised to use and operate the authorised development for which development consent is granted by this Order.

(2) Paragraph (1) does not relieve the undertaker of any requirement to obtain any permit or licence under any legislation that may be required from time to time to authorise the operation of the authorised development.

Benefit of Order

7.—(1) Subject to article 8 (consent to transfer benefit of order), the provisions of this Order conferring powers on the undertaker have effect solely for the benefit of the undertaker.

(2) Paragraph (1) does not apply to—

(a)Work no. 3 in relation to which this Order has effect for the benefit of the undertaker and NGET; and

(b)Work nos. 4 and 5 in relation to which this Order has effect for the benefit of the undertaker and NGG.

Consent to transfer benefit of Order

8.—(1) Subject to paragraphs (4) and (5), the undertaker may—

(a)transfer to another person (“the transferee”) any or all of the benefit of the provisions of this Order and such related statutory rights as may be agreed between the undertaker and the transferee; or

(b)grant to another person (“the lessee”) for a period agreed between the undertaker and the lessee any or all of the benefit of the provisions of this Order and such related statutory rights as may be so agreed.

(2) Where an agreement has been made in accordance with paragraph (1) references in this Order to the undertaker, except in paragraph (3), include references to the transferee or the lessee.

(3) The exercise by a person of any benefits or rights conferred in accordance with any transfer or grant under paragraph (1) is subject to the same restrictions, liabilities and obligations as would apply under this Order if those benefits or rights were exercised by the undertaker.

(4) The consent of the Secretary of State is required for a transfer or grant under this article, except where the transferee or lessee is—

(a)the holder of a licence under section 6 of the Electricity Act 1989(11);

(b)in relation only to a transfer or lease of Work nos. 4 or 5, the holder of a licence under section 7 of the Gas Act 1986(12);

(c)in relation to a transfer or lease of any works within a highway, a highway authority responsible for the highways within the Order limits; and

(d)in relation to a transfer or lease of any works within a street situated within the Port of Tilbury or Work no. 15, Port of Tilbury London Limited or any successor as the statutory harbour authority for the Port of Tilbury.

(5) Where the consent of the Secretary of State is not required under paragraph (4) the undertaker must notify the Secretary of State and the Port of Tilbury London Limited in writing before transferring or granting a benefit referred to in paragraph (1).

(6) The notification referred to in paragraph (5) must state—

(a)the name and contact details of the person to whom the benefit of the powers will be transferred or granted;

(b)subject to paragraph (7), the date on which the transfer will take effect;

(c)the powers to be transferred or granted;

(d)pursuant to paragraph (3), the restrictions, liabilities and obligations that will apply to the person exercising the powers transferred or granted; and

(e)where relevant, a plan showing the works or areas to which the transfer or grant relates.

(7) The date specified under paragraph (6)(b) must not be earlier than the expiry of 14 days from the date of the receipt of the notice.

(8) The notice given under paragraph (5) must be signed by the undertaker and the person to whom the benefit of the powers will be transferred or granted as specified in that notice.

Defence to proceedings in respect of statutory nuisance

9.—(1) Where proceedings are brought under section 82(1) (summary proceedings by persons aggrieved by statutory nuisances) of the Environmental Protection Act 1990(13) in relation to a nuisance falling within paragraph (g) of section 79(1) (statutory nuisances and inspections therefor) of that Act no order is to be made, and no fine may be imposed, under section 82(2) of that Act if the defendant shows that the nuisance—

(a)relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61 (prior consent for work on construction sites), of the Control of Pollution Act 1974(14);

(b)is a consequence of the construction or maintenance of the authorised development and cannot reasonably be avoided; or

(c)is a consequence of the use of the authorised development and cannot reasonably be avoided.

(2) Section 61(9) (prior consent for work on construction site) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.

Disapplication of legislation etc.

10.—(1) The following enactments do not apply in relation to the construction of any work or the carrying out of any operation for the purpose of, or in connection with, the construction of the authorised development or any maintenance of any part of the authorised development—

(a)the West Tilbury Commons, West Tilbury, Essex, Bye-Laws, made by the Conservators of West Tilbury Commons, under the powers of the Commons Regulation (West Tilbury) Provisional Order Confirmation Act 1893(15);

(b)the provisions of any byelaws made under, or having effect as if made under, paragraphs 5, 6 or 6A of Schedule 25 (byelaw making powers of the authority) to the Water Resources Act 1991(16);

(c)the provisions of any byelaws made under section 66 (powers to make byelaws) of the Land Drainage Act 1991(17);

(d)regulation 12 (requirement for environmental permit) of the Environmental Permitting (England and Wales) Regulations 2016(18) in respect of a flood risk activity (including works affecting sea defences) only;

(e)sections 23 and 30 of the Land Drainage Act 1991(19); and

(f)the provisions of the Neighbourhood Planning Act 2017(20) in so far as they relate to the temporary possession of land under articles 28 and 29 of this Order.

(2) The carrying out of any of the following works and operations—

(a)Work nos. 12(a), 12(e), and 15;

(b)any ancillary work listed in Schedule 1;

(c)the use of any street within the port or Work no. 12 for the passage of construction, maintenance or decommissioning vehicles utilised for the authorised development; and

(d)any activities carried out pursuant to the requirements set out in Schedule 2,

is not to be regarded as conflicting, or constituting non-compliance by Port of Tilbury London Limited, with the following requirements in Schedule 2 to the Port of Tilbury (Expansion) Order 2019—

(a)Requirement 4;

(b)Requirement 5;

(c)Requirement 11 (c), (d), (f) and (h); and

(d)Requirement 12.

PART 3STREETS

Street works

11.—(1) The undertaker may, for the purposes of the authorised development, enter on so much of any of the streets as are within the Order limits and may—

(a)break up or open the street, or any sewer, drain or tunnel under it;

(b)tunnel or bore under the street;

(c)place apparatus in the street;

(d)maintain apparatus in the street or change its position; and

(e)execute any works required for, or incidental to, any works referred to in sub-paragraphs (a) to (d).

(2) The authority given by paragraph (1) is a statutory right for the purposes of sections 48(3) (streets, street works and undertakers) and 51(1) (prohibition of unauthorised street works) of the 1991 Act.

(3) Subject to article 12 (application of the 1991 Act), the provisions of sections 54 to 106 of the 1991 Act apply to any street works carried out under paragraph (1).

Application of the 1991 Act

12.—(1) Works executed under this Order in relation to a highway which consists of or includes a carriageway are to be treated for the purposes of Part 3 (street works in England and Wales) of the 1991 Act as major highway works if—

(a)they are of a description mentioned in any of paragraphs (a), (c) to (e), (g) and (h) of section 86(3)(21) of that Act; or

(b)they are works which, had they been executed by the local highway authority, might have been carried out in exercise of the powers conferred by section 64(22) (dual carriageways and roundabouts) of the 1980 Act or section 184(23) (vehicle crossings over footways and verges) of that Act.

(2) In Part 3 of the 1991 Act references to the highway authority concerned are, in relation to works which are major highway works by virtue of paragraph (1), to be construed as references to the undertaker.

(3) The following provisions of the 1991 Act do not apply in relation to any works executed under the powers conferred by this Order—

(a)section 56(24) (power to give directions as to timing of street works);

(b)section 56A(25) (power to give directions as to placing of apparatus);

(c)section 58(26) (restriction on works following substantial road works);

(d)section 58A(27) (restriction on works following substantial street works); and

(e)schedule 3A(28) (restriction on works following substantial street works).

(4) The provisions of the 1991 Act mentioned in paragraph (5) (which, together with other provisions of that Act, apply in relation to the execution of street works) and any regulations made, or code of practice issued or approved, under those provisions apply (with the necessary modifications) in relation to any stopping up, alteration or diversion of a street of a temporary nature by the undertaker under the powers conferred by article 13 (temporary restriction of use of streets) whether or not the stopping up, alteration or diversion constitutes street works within the meaning of that Act.

(5) The provisions of the 1991 Act(29) referred to in paragraph (4) are—

(a)section 54 (advance notice of certain works), subject to paragraph (6);

(b)section 55 (notice of starting date of works), subject to paragraph (6);

(c)section 57 (notice of emergency works);

(d)section 59 (general duty of street authority to co-ordinate works);

(e)section 60 (general duty of undertakers to co-operate);

(f)section 68 (facilities to be afforded to street authority);

(g)section 69 (works likely to affect other apparatus in the street);

(h)section 75 (inspection fees);

(i)section 76 (liability for cost of temporary traffic regulation); and

(j)section 77 (liability for cost of use of alternative route),

and all such other provisions as apply for the purposes of the provisions mentioned above.

(6) Sections 54 and 55 of the 1991 Act as applied by paragraph (4) have effect as if references in section 57 of that Act to emergency works were a reference to a stopping up, alteration or diversion (as the case may be) required in a case of emergency.

Temporary restriction of use of streets

13.—(1) The undertaker, during and for the purposes of carrying out the authorised development, may alter, divert or restrict the use of any street and may for any reasonable time—

(a)divert the traffic from the street; and

(b)subject to paragraph (4), prevent all persons from passing along the street.

(2) Without limitation on the scope of paragraph (1), the undertaker may temporarily restrict or control the use of the streets set out in column 2 of Schedule 4 to the extent set out in column 3 of that Schedule.

(3) The undertaker may use any street temporarily stopped up or restricted under the powers conferred by this article, and which is within the Order limits, as a temporary working site.

(4) The undertaker must provide reasonable access for pedestrians going to or from premises abutting a street affected by the temporary alteration, diversion or restriction of a street under this article if there would otherwise be no such access.

(5) The undertaker must not temporarily alter, divert or restrict the use of any street for which it is not the street authority without the consent of the street authority, which may attach reasonable conditions to any consent but such consent must not be unreasonably withheld or delayed.

(6) Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 (determination of questions of disputed compensation) of the 1961 Act.

(7) Save for any application made to Highways England, if a street authority which receives an application for consent under paragraph (5) fails to notify the undertaker of its decision before the end of the period of 28 days beginning with the date on which the application was made, it is deemed to have granted consent.

Access to works

14.  The undertaker may, for the purposes of the authorised development, form and lay out means of access, or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development.

Traffic regulation

15.—(1) From such a date as the undertaker may determine, the application of the traffic regulation order listed in column 3 of Schedule 3 will be suspended until the completion of the authorised development.

(2) The undertaker must notify the chief officer of police and the traffic authority in whose area the road is situated of the commencement of suspension under paragraph 1 not less than 14 days before the date to be determined under paragraph (1), and 14 days prior to completion of the authorised development of the date of completion for the purposes of paragraph (1).

(3) Without limitation on the scope of paragraph (1), and subject to the provisions of this article, and the consent of the traffic authority in whose area the road concerned is situated, which consent must not be unreasonably withheld, the undertaker may, for the purposes of the authorised development revoke, amend or suspend in whole or in part any order not listed in Schedule 3 made, or having effect as if made, under the 1984 Act, either at all times or at times, on days or during such periods as may be specified by the undertaker.

(4) The power conferred by paragraph (3) may be exercised at any time prior to the expiry of 12 months from the commencement of operation of the authorised development but subject to paragraph (8) any prohibition, restriction or other provision made under this article may have effect both before and after the expiry of that period.

(5) The undertaker must consult the chief officer of police and the traffic authority in whose area the road is situated before complying with the provisions of paragraph (6).

(6) The undertaker must not exercise the powers conferred by this article unless it has—

(a)given not less than—

(i)12 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect permanently; or

(ii)4 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect temporarily,

to the chief officer of police and to the traffic authority in whose area the road is situated; and

(b)advertised its intention in such manner as the traffic authority may specify in writing within 28 days of its receipt of notice of the undertaker’s intention in the case of sub-paragraph (a)(i), or within 7 days of its receipt of notice of the undertaker’s intention in the case of sub-paragraph (a)(ii).

(7) Any prohibition, restriction or other provision made by the undertaker under this article—

(a)has effect as if duly made by, as the case may be—

(i)the traffic authority in whose area the road is situated, as a traffic regulation order under the 1984 Act; or

(ii)the local authority in whose area the road is situated, as an order under section 32 (power of local authorities to provide parking places) of the 1984 Act,

and the instrument by which it is effected may specify savings and exemptions to which the prohibition, restriction or other provision is subject; and

(b)is deemed to be a traffic order for the purposes of Schedule 7 (road traffic contraventions subject to civil enforcement) to the Traffic Management Act 2004(30).

(8) Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the undertaker from time to time by subsequent exercise of the powers conferred by this article within a period of 24 months from the opening of the authorised development.

(9) Before exercising the powers conferred by this article the undertaker must consult such persons as it considers necessary and appropriate and must take into consideration any representations made to it by any such person.

(10) Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.

(11) The powers conferred on the undertaker by this article with respect to any road have effect subject to any agreement entered into by the undertaker with any person with an interest in (or who undertakes activities in relation to) premises served by the road.

(12) Save for any application made to Highways England, if the traffic authority fails to notify the undertaker of its decision within 28 days of receiving an application for consent under paragraph (2) the traffic authority is deemed to have granted consent.

PART 4SUPPLEMENTAL POWERS

Discharge of water

16.—(1) Subject to paragraphs (3) and (4), the undertaker may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out, maintenance or use of the authorised development and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain.

(2) Any dispute arising from the making of connections to or the use of a public sewer or drain by the undertaker under paragraph (1) is to be determined as if it were a dispute under section 106 (right to communicate with public sewers) of the Water Industry Act 1991(31).

(3) The undertaker must not discharge any water into any watercourse, public sewer or drain except with the consent of the person to whom it belongs or the person or body otherwise having authority to give such consent; and such consent may be given subject to such terms and conditions as that person may reasonably impose but must not be unreasonably withheld.

(4) The undertaker must not make any opening into any public sewer or drain except—

(a)in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and

(b)where that person has been given the opportunity to supervise the making of the opening.

(5) The undertaker must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension.

(6) This article does not authorise a groundwater activity or a water discharge activity for which an environmental permit would be required under regulation 12 of the Environmental Permitting (England and Wales) Regulations 2016(32).

(7) In this article—

(a)“public sewer or drain” means a sewer or drain which belongs to Homes England, the Environment Agency, a harbour authority within the meaning of section 57(1) (interpretation) of the Harbours Act 1964(33), an internal drainage board, a joint planning board, a local authority, a sewerage undertaker or an urban development corporation; and

(b)other expressions, excluding watercourse, used both in this article and in the Water Resources Act 1991(34) have the same meaning as in that Act.

(8) If a person who receives an application for consent under paragraph (3) or approval under paragraph (4)(a) fails to notify the undertaker of a decision within 28 days of receiving an application, that person is deemed to have granted consent or given approval, as the case may be.

Authority to survey and investigate the land

17.—(1) The undertaker may for the purposes of this Order enter on any land shown within the Order limits and—

(a)survey or investigate the land;

(b)without prejudice to the generality of sub-paragraph (a), make trial holes in such positions on the land as the undertaker thinks fit to investigate the nature of the surface layer and subsoil and remove soil samples;

(c)without prejudice to the generality of sub-paragraph (a), carry out ecological or archaeological investigations on such land; and

(d)place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes.

(2) No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least fourteen days’ notice has been served on every owner and occupier of the land.

(3) Any person entering land under this article on behalf of the undertaker—

(a)must, if so required before or after entering the land, produce written evidence of their authority to do so; and

(b)may take with them such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes.

(4) No trial holes are to be made under this article—

(a)in land located within the highway boundary without the consent of the highway authority; or

(b)in a private street without the consent of the street authority.

(5) The undertaker must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the authority conferred by this article, such compensation to be determined, in case of dispute, under Part 1 (determination of questions of disputed compensation) of the 1961 Act.

Removal of human remains

18.—(1) Before the undertaker carries out any development or works which will or may disturb any human remains within the Order limits it must remove those human remains from within the Order limits, or cause them to be removed, in accordance with the following provisions of this article.

(2) Before any such remains are removed from within the Order limits the undertaker must give notice of the intended removal, describing the location of the identified remains and stating the general effect of the following provisions of this article, by—

(a)publishing a notice once in each of two successive weeks in a newspaper circulating in the area of the authorised project; and

(b)displaying a notice in a conspicuous place on or near to the boundary of the Order limits.

(3) As soon as reasonably practicable after the first publication of a notice under paragraph (2) the undertaker must send a copy of the notice to the relevant planning authority.

(4) At any time within 56 days after the first publication of a notice under paragraph (2) any person who is a personal representative or relative of any deceased person whose remains are interred in the specific land may give notice in writing to the undertaker of that person’s intention to undertake the removal of the remains.

(5) Where a person has given notice under paragraph (4), and the remains in question can be identified, that person may cause such remains to be—

(a)removed and re-interred in any burial ground or cemetery in which burials may legally take place; or

(b)removed to, and cremated in, any crematorium,

and that person must, as soon as reasonably practicable after such re-interment or cremation, provide to the undertaker a certificate for the purpose of enabling compliance with paragraph (10).

(6) If the undertaker is not satisfied that any person giving notice under paragraph (4) is the personal representative or relative as that person claims to be, or that the remains in question can be identified, the question is to be determined on the application of either party in summary manner by the county court, and the court may make an order specifying who is to remove the remains and as to the payment of the costs of the application.

(7) The undertaker must pay the reasonable expenses of removing and re-interring or cremating the remains of any deceased person under this article.

(8) If—

(a)within the period of 56 days referred to in paragraph (4) no notice under that paragraph has been given to the undertaker in respect of any remains in the Order limits; or

(b)such notice is given and no application is made under paragraph (6) within 56 days after the giving of the notice but the person who has given the notice fails to remove the remains within a further period of 56 days; or

(c)within 56 days after any order is made by the county court under paragraph (6) any person, other than the undertaker, specified in the order fails to remove the remains; or

(d)it is determined that the remains to which any such notice relates cannot be identified,

subject to paragraph (9), the undertaker must remove the remains and cause them to be re-interred in such burial ground, or cemetery in which burials may legally take place as the undertaker thinks suitable for the purpose and, so far as possible, remains from individual graves must be re-interred in individual containers which must be identifiable by a record prepared with reference to the original position of burial of the remains that they contain.

(9) If the undertaker is satisfied that any person giving notice under paragraph (4) is the personal representative or relative as that person claims to be and that the remains in question can be identified, but that person does not remove the remains, the undertaker must comply with any reasonable request that person may make in relation to the removal and re-interment or cremation of the remains.

(10) On the re-interment or cremation of any remains under this article—

(a)a certificate of re-interment or cremation must be sent by the undertaker to the Registrar General giving the date of re-interment or cremation and identifying the place from which the remains were removed and the place in which they were re-interred or cremated; and

(b)a copy of the certificate of re-interment or cremation and the record mentioned in paragraph (8) must be sent by the undertaker to the relevant planning authority mentioned in paragraph (3).

(11) The removal of the remains of any deceased person under this article must be carried out in accordance with any directions which may be given by the Secretary of State.

(12) Any jurisdiction or function conferred on the county court by this article may be exercised by the district judge of the court.

(13) Section 25 of the Burial Act 1857(35) (bodies not to be removed from burial grounds, save under faculty, without licence of Secretary of State) is not to apply to a removal carried out in accordance with this article.

PART 5POWERS OF ACQUISITION

Compulsory acquisition of land

19.—(1) The undertaker may acquire compulsorily so much of the Order land as is required for the authorised development or to facilitate it, or is incidental to it and may use any land so acquired for the purposes authorised by this Order or for any other purposes in connection with or ancillary to the authorised development.

(2) This article is subject to paragraph (3), article 21, article 22 (compulsory acquisition of rights), article 25 (acquisition of subsoil etc. only), article 28 (temporary use of land for carrying out the authorised development) and article 33 (special category land).

(3) The undertaker may only exercise the power conferred by paragraph (1) on land comprised in 1 of the 2 options for access forming part of Work no. 12 being—

(a)the area within Work no. 12(c) as shown on the works plans and comprising plots 01/19, 01/21, 01/22, 01/30, 01/31 and 01/32 and part of plot 01/20, as shown on the lands plans; or

(b)the area within Work no. 12(d) as shown on the works plans and comprising plots 01/27, 01/28, 01/29, 04/05, and 04/06 and part of plot 04/03 as shown on the lands plans; and

where the undertaker serves notice to treat under section 5 of the 1965 Act, or makes a declaration under section 4 of the 1981 Act over any of the land specified in either (a) or (b), it must at the same time serve on the owners of the land of the other option, a notice specifying that compulsory acquisition powers cannot be exercised over that land under this Order.

Statutory authority to override easements and other rights

20.—(1) The carrying out or use of the authorised development and the doing of anything else authorised by this Order is authorised for the purpose specified in section 158(2) of the 2008 Act (nuisance: statutory authority), notwithstanding that it involves—

(a)an interference with an interest or right to which this article applies; or

(b)a breach of restriction as to use of land arising by virtue of contract.

(2) The undertaker must pay compensation to any person whose land is injuriously affected by—

(a)an interference with an interest or right to which this article applies; or

(b)a breach of restriction as to use of land arising by virtue of contract,

authorised by virtue of this Order and the operation of section 158 of the 2008 Act.

(3) The interests and rights to which this article applies are any easement, liberty, privilege, right or advantage annexed to land and adversely affecting other land, including any natural right to support and include restrictions as to the use of land arising by virtue of a contract.

(4) Where an interest, right or restriction is overridden by paragraph (1), compensation—

(a)is payable under section 7 (measure of compensation in case of severance) or section 10 (further provision as to compensation for injurious affection) of the 1965 Act; and

(b)is to be assessed in the same manner and subject to the same rules as in the case of other compensation under those sections where—

(i)the compensation is to be estimated in connection with a purchase under that Act; or

(ii)the injury arises from the execution of works on or use of land acquired under that Act.

(5) Nothing in this article is to be construed as authorising any act or omission on the part of any person which is actionable at the suit of any person on any grounds other than such an interference or breach as is mentioned in paragraph (1) of this article.

Time limit for exercise of authority to acquire land compulsorily

21.—(1) After the end of the period 5 years beginning on the day on which this Order is made—

(a)no notice to treat may be served under Part 1 of the 1965 Act; and

(b)no declaration may be executed under section 4 of the 1981 Act (execution of declaration) as applied by article 24 (application of the 1981 Act).

(2) The authority conferred by article 28 (temporary use of the land for carrying out the authorised development) ceases at the end of the period referred to in paragraph (1), save that nothing in this paragraph is to prevent the undertaker remaining in possession of land after the end of that period, if the land was entered and possession was taken before the end of that period.

Compulsory acquisition of rights

22.—(1) Subject to paragraphs (2) and (3), the undertaker may acquire compulsorily such rights or impose such restrictive covenants over the Order land as may be required for any purpose for which that land may be acquired under article 19 (compulsory acquisition of land) by creating them as well as by acquiring rights already in existence.

(2) In the case of the Order land specified in column 1 of Schedule 5 (land of which temporary possession may be taken and in which only new rights etc. may be acquired) the undertaker’s powers of compulsory acquisition are limited to the acquisition of such wayleaves, easements or new rights in the land and the imposition of such restrictive covenants as are specified in column 2 of that Schedule.

(3) The undertaker may only exercise the power conferred by paragraph (1) on land comprised in 1 of the 2 options for access forming part of Work no. 12 being—

(a)the area within Work no. 12(c) as shown on the works plans and comprising plots 01/19, 01/21, 01/22, 01/30, 01/31 and 01/32 and part of plot 01/20, as shown on the land plans; or

(b)the area within Work no. 12(d) as shown on the works plans and comprising plots 01/27, 01/28, 01/29, 04/05, and 04/06 and part of plot 04/03 as shown on the land plans; and

where the undertaker serves notice to treat under section 5 of the 1965 Act or makes a declaration under section 4 of the 1981 Act over any of the land specified in either (a) or (b), it must at the same time serve on the owners of the land of the other option, a notice specifying that compulsory acquisition powers cannot be exercised over that land under this Order.

(4) Subject to section 8 of the 1965 Act (other provisions as to divided land), where the undertaker acquires a right over land under paragraph (1), the undertaker is not required to acquire a greater interest in that land.

(5) Schedule 7 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants) has effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article of a right over land by the creation a new right or the imposition of restrictive covenants.

Private rights

23.—(1) Subject to the provisions of this article, all private rights over land subject to compulsory acquisition under this Order are extinguished—

(a)as from the date of acquisition of the land by the undertaker, whether compulsorily or by agreement; or

(b)on the date of entry on the land by the undertaker under section 11(1) of the 1965 Act (power of entry),

whichever is the earliest.

(2) Subject to the provisions of this article, all private rights over land subject to the compulsory acquisition of rights under this Order are suspended and unenforceable or, where so notified by the undertaker, extinguished in so far as in either case their continuance would be inconsistent with the exercise of the right—

(a)as from the date of acquisition of the land by the undertaker, whether compulsorily or by agreement; or

(b)on the date of entry on the land by the undertaker under section 11(1) of the 1965 Act (power of entry) in pursuance of the right,

whichever is earliest.

(3) Subject to the provisions of this article, all private rights over land owned by the undertaker within the Order land are extinguished on commencement of any activity authorised by this Order which interferes with or breaches such rights.

(4) Subject to the provisions of this article, all private rights over land of which the undertaker takes temporary possession under this Order are suspended and unenforceable for as long as the undertaker remains in lawful possession of the land and so far as their continuance would be inconsistent with the exercise of the temporary possession of that land.

(5) Any person who suffers loss by the extinguishment or suspension of any private right under this Order is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

(6) This article does not apply in relation to any right or apparatus to which section 138 of the 2008 Act (extinguishment of rights, and removal of apparatus, of statutory undertaker etc.) or article 30 (statutory undertakers) applies.

(7) Paragraphs (1) to (4) have effect subject to—

(a)any notice given by the undertaker before—

(i)the completion of the acquisition of the land or the acquisition of rights over land;

(ii)the undertaker’s appropriation of it;

(iii)the undertaker’s entry onto it; or

(iv)the undertaker’s taking temporary possession of it;

that any or all of those paragraphs do not apply to any right specified in the notice; and

(b)any agreement made at any time between the undertaker and the person in or to whom the right in question is vested or belongs.

(8) If any such agreement as is referred to in paragraph (7)(b)—

(a)is made with a person in or to whom the right is vested or belongs; and

(b)is expressed to have effect also for the benefit of those deriving title from or under that person,

it is effective in respect of the persons so deriving title, whether the title was derived before or after the making of the agreement.

(9) This article is subject to article 22(4).

Application of the 1981 Act

24.—(1) The 1981 Act applies as if this Order were a compulsory purchase order.

(2) The 1981 Act, as applied, has effect with the following modifications.

(3) In section 1 (application of Act) for subsection (2) substitute—

(2) This section applies to any Minister, any local or other public authority or any other body or person authorised to acquire land by means of a compulsory purchase order..

(4) Omit section 5 (earliest date for execution of declaration).

(5) Omit section 5A (time limit for general vesting declaration).

(6) In section 5B(1) (extension of time limit during challenge)—

(a)for “section 23 of the Acquisition of Land Act 1981 (application to High Court in respect of compulsory purchase order)” substitute “section 118 of the Planning Act 2008 (legal challenges relating to applications for orders granting development consent)”; and

(b)for “the three year period mentioned in section 5A” substitute “the five year period mentioned in article 21 of the Thurrock Flexible Generation Plant Development Consent Order 2022”.

(7) In section 6 (notices after execution of declaration) for subsection (1)(b) substitute—

(b)on every other person who has given information to the acquiring authority with respect to any of that land further to the invitation published and served under section 134 of the Planning Act 2008,.

(8) In section 7 (constructive notice to treat) in subsection (1)(a) omit “(as modified by section 4 of the Acquisition of Land Act 1981)”.

(9) In Schedule A1 (counter-notice requiring purchase of land not in general vesting declaration), for paragraph 1(2) substitute—

But see article 25(3) (acquisition of subsoil only) of the Thurrock Flexible Generation Plant Development Consent Order 2022, which excludes the acquisition of subsoil from this Schedule..

(10) References to the 1965 Act in the 1981 Act are to be constructed as references to the 1965 Act as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act and as modified by article 26 (modification of Part 1 of the 1965 Act) to the compulsory acquisition of the land under this Order.

Acquisition of subsoil only

25.—(1) The undertaker may acquire compulsorily so much of, or such rights in, the subsoil of the land referred to in paragraph (1) of article 19 (compulsory acquisition of land) and paragraph (1) of article 22 (compulsory acquisition of rights) as may be required for any purpose for which that land may be acquired under that provision instead of acquiring the whole of the land.

(2) Where the undertaker acquires any part of, or rights in the subsoil of land under paragraph (1), the undertaker is not to be required to acquire an interest in any other part of the land.

(3) Paragraph (2) does not prevent Schedule 2A to the 1965 Act (as modified by article 22(5) and paragraph 8 of Schedule 7 as the case may be) from applying where the undertaker acquires any part of, or rights in a cellar, vault, arch or other construction forming part of a house, building or factory.

(4) The following do not apply in connection with the exercise of the power under paragraph (1) in relation to subsoil only—

(a)Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as modified by article 26 (modification of Part 1 of the 1965 Act);

(b)Schedule A1 (counter-notice requiring purchase of land not in general vesting declaration) to the 1981 Act; and

(c)section 153(4A) (blighted land: proposed acquisition of part interest; material detriment test) of the 1990 Act.

Modification of Part 1 of the 1965 Act

26.—(1) Part 1 of the 1965 Act, as applied to this Order by section 125 (application of compulsory acquisition provisions) of the 2008 Act, is modified as follows.

(2) In section 4A(1) (extension of time limit during challenge)—

(a)for “section 23 of the Acquisition of Land Act 1981 (application to High Court in respect of compulsory purchase order)” substitute “section 118 of the Planning Act 2008 (legal challenges relating to applications for orders granting development consent)”; and

(b)for “the three year period mentioned in section 4” substitute “the five year period mentioned in article 21 (time limit for exercise of authority to acquire land compulsorily) of the Thurrock Flexible Generation Plant Development Consent Order 2022”.

(3) In section 22(2) (interests omitted from purchase), for “section 4 of this Act” substitute “article 21 (time limit for exercise of authority to acquire land compulsorily) of the Thurrock Flexible Generation Plant Development Consent Order 2022”.

Rights under or over streets

27.—(1) The undertaker may enter upon and appropriate so much of the subsoil of, or air-space over, any street within the Order limits as may be required for the purposes of the authorised development and may use the subsoil or air-space for those purposes or any other purpose ancillary to the authorised development.

(2) Subject to paragraph (3), the undertaker may exercise any power conferred by paragraph (1) in relation to a street without being required to acquire any part of the street or any easement or right in the street.

(3) Paragraph (2) does not apply in relation to—

(a)any subway or underground building; or

(b)any cellar, vault, arch or other construction in, on or under a street which forms part of a building fronting onto the street or any easement or right in the street.

(4) Subject to paragraph (5), any person who is an owner or occupier of land in respect of which the power of appropriation conferred by paragraph (1) is exercised without the undertaker acquiring any part of that person’s interest in the land, and who suffers loss by the exercise of that power, is to be entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

(5) Compensation is not payable under paragraph (4) to any person who is an undertaker to whom section 85 of the 1991 Act (sharing cost of necessary measures) applies in respect of measures of which the allowable costs are to be borne in accordance with that section.

Temporary use of land for carrying out the authorised development

28.—(1) The undertaker may, in connection with the carrying out of the authorised development—

(a)enter on and take temporary possession of—

(i)the land specified in column (1) of Schedule 5 (land of which temporary possession may be taken and in which only rights etc. may be acquired) for the purposes of constructing the authorised development;

(ii)the land in column 1 of Schedule 6 (land of which only temporary possession may be taken) for the purpose specified in relation to that land in column (3) of that Schedule; and

(iii)any of the Order land in respect of which no notice of entry has been served under section 11 of the 1965 Act (powers of entry) and no declaration has been made under section 4 of the 1981 Act (execution of declaration), other than in connection with the acquisition of rights only;

(b)remove any buildings and vegetation from that land;

(c)construct temporary works (including the provision of means of access) and buildings on that land; and

(d)construct any works specified in relation to that land in column (2) of Schedule 5 or column (3) of Schedule 6, or any mitigation;

but may not use the power granted under this article to construct any new means of access within Work nos. 12(c) or 12(d) unless details of the design for the new road section to be constructed as part of that work have been approved under requirement 4 of Schedule 2 to this Order.

(2) Not less than fourteen days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.

(3) The undertaker may not, without the agreement of the owners of the land, remain in possession of any land under this article—

(a)in the case of land specified in paragraph (1)(a)(i) and (ii) after the end of the period of one year beginning with the date of completion of the works for which temporary possession of the land was taken; or

(b)in the case of land referred to in paragraph (1)(a)(iii) after the end of the period of one year beginning with the date of completion of the works for which temporary possession of the land was taken unless the undertaker has, before the end of that period, served notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act or has otherwise acquired the land subject to temporary possession.

(4) Unless the undertaker has served notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act or has otherwise acquired the land subject to temporary possession, the undertaker must, before giving up possession of land of which temporary possession has been taken under this article, remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but the undertaker is not to be required to replace a building removed under this article.

(5) The undertaker must pay compensation to the owners and occupiers of land which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of any power conferred by this article.

(6) Any dispute as to a person’s entitlement to compensation under paragraph (5), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.

(7) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (5).

(8) The undertaker may not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(ii).

(9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.

(10) Section 13 of the 1965 Act (refusal to give possession to acquiring authority) applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 of the 2008 Act (application of compulsory acquisition provisions).

(11) Nothing in this article prevents the taking of temporary possession of any land more than once.

Temporary use of land for maintaining the authorised development

29.—(1) Subject to paragraph (2), at any time during the maintenance period (as defined in paragraph 11) relating to any part of the authorised development, the undertaker may—

(a)enter on and take temporary possession of any land within the Order limits if such possession is reasonably required for the purpose of maintaining the authorised development; and

(b)construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.

(2) Paragraph (1) does not authorise the undertaker to take temporary possession of—

(a)any house or garden belonging to a house; or

(b)any building (other than a house) if it is for the time being occupied.

(3) Not less than twenty-eight days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.

(4) The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.

(5) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.

(6) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.

(7) Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of the compensation, is to be determined under Part 1 of the 1961 Act.

(8) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (6).

(9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.

(10) Section 13 of the 1965 Act (refusal to give possession to acquiring authority) applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.

(11) In this article “the maintenance period” means the period of 5 years beginning with the date on which the generating station forming Work no.1A first exports electricity to the national electricity transmission network.

Statutory undertakers

30.  Subject to article 22 and the provisions of Schedule 8 (protective provisions), the undertaker may—

(a)acquire compulsorily the land belonging to statutory undertakers shown on the land plans and described in the book of reference;

(b)extinguish or suspend the rights of, and remove or reposition the apparatus belonging to, statutory undertakers over or within the Order limits; and

(c)acquire compulsorily the new rights over land belonging to statutory undertaker shown on the land plans and described in the book of reference.

Apparatus and rights of statutory undertakers in stopped up streets

31.  Where a street is temporarily altered or diverted or its use is temporarily stopped up under article 13 (temporary restriction of use of streets) any statutory undertaker whose apparatus is under, in, on, along or across the street is to have the same powers and right in respect of that apparatus, subject to Schedule 8 (protective provisions), as if this Order had not been made.

Recovery of costs of new connections

32.—(1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 30 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

(2) Paragraph (1) does not apply in the case of the removal of public sewer but where such a sewer is removed under article 30 (statutory undertakers), any person who is—

(a)the owner or occupier of premises the drains of which communicated with that sewer; or

(b)the owner of a private sewer which communicated with that sewer,

is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

(3) This article does not have effect in relation to apparatus to which article 31 (apparatus and rights of statutory undertakers in stopped up streets) or Part 3 of the 1991 Act applies.

(4) In this article—

(a)“public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003(36); and

(b)“public utility undertaker” has the same meaning as in the 1980 Act.

Special category land

33.—(1) The special category land is not to vest in the undertaker by virtue of any power granted by this Order until the undertaker has acquired the replacement land and the relevant planning authority has certified that the replacement land has been satisfactorily laid out and been made available by the undertaker.

(2) On the requirements of paragraph (1) being satisfied the replacement land is to vest in the person(s) in whom the special category land was vested immediately before it was vested in the undertaker and is to be subject to the same rights trusts and incidents as attached to the special category land.

(3) As soon as reasonably practicable after paragraph (2) takes effect, the undertaker must apply under section 14 (statutory dispositions) of the Commons Act 2006(37) and paragraph 8 of Schedule 4 (applications pursuant to section 14: statutory dispositions) to the Commons Registration (England) Regulations 2014(38) to amend the relevant register of common land accordingly.

(4) In this article “rights, trusts and incidents” includes all such provisions contained in the Commons Regulation (West Tilbury) Provisional Order Confirmation Act 1893 or having effect under that Act and s193 of the Law of Property Act 1925.

Funding

34.—(1) The undertaker must not exercise the powers conferred by the provisions referred to in paragraph (2) in relation to any Order land unless it has first put in place either—

(a)a guarantee, and the amount of that guarantee has been approved by the Secretary of State in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2); or

(b)an alternative form of security, and the amount of that security for that purpose has been approved by the Secretary of State in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2).

(2) The provisions are—

(a)article 19 (compulsory acquisition of land);

(b)article 22 (compulsory acquisition of rights);

(c)article 23 (private rights);

(d)article 25 (acquisition of subsoil only);

(e)article 28 (temporary use of land for carrying out the authorised development);

(f)article 29 (temporary use of land for maintaining the authorised development); and

(g)article 30 (statutory undertakers).

(3) A guarantee or alternative form of security given in respect of any liability of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2) is to be treated as enforceable against the guarantor or person providing the alternative form of security by any person to whom such compensation is payable and must be in such a form as to be capable of enforcement by such a person.

(4) Nothing in this article requires a guarantee or alternative form of security to be in place for more than 15 years after the date on which the relevant power is exercised.

PART 6OPERATIONS

Felling or lopping of trees and removal of hedgerows

35.—(1) The undertaker may fell or lop any tree or shrub, or cut back its roots, within or overhanging land within the Order limits if it reasonably believes it to be necessary to do so to prevent the tree or shrub—

(a)from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or

(b)from constituting a danger to persons using the authorised development.

(2) In carrying out any activity authorised by paragraph (1), the undertaker must—

(a)do no unnecessary damage to any tree or shrub; and

(b)pay compensation to any person for any loss or damage arising from such activity.

(3) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined under Part 1 of the 1961 Act.

(4) The undertaker may, for the purposes of carrying out the authorised development but subject to paragraph (2), remove any hedgerow within the Order limits that is required to be removed.

(5) In this article “hedgerow” has the same meaning as in the Hedgerows Regulations 1997(39).

PART 7MISCELLANEOUS AND GENERAL

Protective provisions

36.  Schedule 8 (protective provisions) has effect.

Operational land for the purposes of the 1990 Act

37.  Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) (cases in which land is to be treated as not being operational land) of the 1990 Act.

Certification of plans, etc.

38.—(1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—

(a)the land plans and special category land plans (consisting of a key plan and sheets 1 to 5 inclusive) as approved by the Secretary of State under requirement 30;

(b)the works plans (document number A2.3);

(c)the illustrative cross section plans (document number A2.8);

(d)the illustrative landscape plan (document number A2.9);

(e)the conceptual drainage strategy (document number A7.3);

(f)the book of reference as approved by the Secretary of State under requirement 30;

(g)the environmental statement (document number A6.0);

(h)the design principles statement (document number A8.4);

(i)the outline code of construction practice (document number A8.6);

(j)the outline ecological management plan (document number A8.7);

(k)the outline construction traffic management plan (document number A8.8);

(l)the outline construction worker travel plan (document number A8.9);

(m)the outline written scheme of archaeological investigation (document number A8.11);

(n)the outline employment and skills strategy (document number A8.13); and

(o)any other plans or documents referred to in this Order as requiring certification,

for certification that they are true copies of the documents referred to in this Order.

(2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Service of notices

39.—(1) A notice or other document required or authorised to be served for the purposes of this Order may be served—

(a)by post;

(b)by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or

(c)with the consent of the recipient and subject to paragraphs (5) to (8) by electronic transmission.

(2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.

(3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978(40) as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—

(a)in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and

(b)in any other case, the last known address of that person at the time of service.

(4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—

(a)addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and

(b)either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.

(5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is to be taken to be fulfilled only where—

(a)the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;

(b)the notice or document is capable of being accessed by the recipient;

(c)the notice or document is legible in all material respects; and

(d)the notice or document is in a form sufficiently permanent to be used for subsequent reference.

(6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.

(7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).

(8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—

(a)that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and

(b)such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.

(9) This article does not exclude the employment of any method of service not expressly provided for by it.

(10) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.

No double recovery

40.  Compensation is not payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law, or under two or more different provisions of this Order.

Application of landlord and tenant law

41.—(1) This article applies to any agreement entered into by the undertaker under article 8 (consent to transfer of benefit of Order) so far as it relates to the terms on which any land is subject to a lease granted by or under that agreement.

(2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.

(3) No enactment or rule of law to which paragraph (2) applies is to apply in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—

(a)exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;

(b)confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or

(c)restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.

Arbitration

42.—(1) Except where otherwise expressly provided for in this Order and unless otherwise agreed in writing between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the Secretary of State.

(2) Any matter for which the consent or approval of the Secretary of State is required under any provision of this Order shall not be subject to arbitration.

Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy

Gareth Leigh

Head of Energy Infrastructure Planning

Department for Business, Energy and Industrial Strategy

16th February 2022

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill