Search Legislation

The Hornsea Three Offshore Wind Farm Order 2020

Changes to legislation:

There are currently no known outstanding effects for the The Hornsea Three Offshore Wind Farm Order 2020. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Information:

You searched for provisions that are applicable to England. The matching provisions are highlighted below. Where no highlighting is shown the matching result may be contained within a footnote.

  1. Introductory TextNext Match

  2. PART 1 PRELIMINARYPrevious MatchNext Match

    1. 1.Citation and commencementPrevious MatchNext Match

    2. 2.InterpretationPrevious MatchNext Match

  3. PART 2 PRINCIPAL POWERSPrevious MatchNext Match

    1. 3.Development consent etc. granted by the OrderPrevious MatchNext Match

    2. 4.Power to maintain the authorised projectPrevious MatchNext Match

    3. 5.Benefit of the OrderPrevious MatchNext Match

    4. 6.Application and modification of legislative provisionsPrevious MatchNext Match

    5. 7.Defence to proceedings in respect of statutory nuisancePrevious MatchNext Match

  4. PART 3 STREETSPrevious MatchNext Match

    1. 8.Street worksPrevious MatchNext Match

    2. 9.Application of the 1991 ActPrevious MatchNext Match

    3. 10.Temporary stopping up of streetsPrevious MatchNext Match

    4. 11.Temporary stopping up of public rights of wayPrevious MatchNext Match

    5. 12.Access to worksPrevious MatchNext Match

    6. 13.Agreements with street authoritiesPrevious MatchNext Match

    7. 14.Power to alter layout etc. of streetsPrevious MatchNext Match

  5. PART 4 SUPPLEMENTAL POWERSPrevious MatchNext Match

    1. 15.Discharge of waterPrevious MatchNext Match

    2. 16.Protective work to buildingsPrevious MatchNext Match

    3. 17.Authority to survey and investigate the land onshorePrevious MatchNext Match

  6. PART 5 POWERS OF ACQUISITIONPrevious MatchNext Match

    1. 18.Compulsory acquisition of landPrevious MatchNext Match

    2. 19.Time limit for exercise of authority to acquire land compulsorilyPrevious MatchNext Match

    3. 20.Compulsory acquisition of rightsPrevious MatchNext Match

    4. 21.Private RightsPrevious MatchNext Match

    5. 22.Application of the 1981 ActPrevious MatchNext Match

    6. 23.Acquisition of subsoil onlyPrevious MatchNext Match

    7. 24.Modification of Part 1 of the 1965 ActPrevious MatchNext Match

    8. 25.Rights under or over streetsPrevious MatchNext Match

    9. 26.Temporary use of land for carrying out the authorised projectPrevious MatchNext Match

    10. 27.Temporary use of land for maintaining the authorised projectPrevious MatchNext Match

    11. 28.Statutory undertakersPrevious MatchNext Match

    12. 29.Recovery of costs of new connectionsPrevious MatchNext Match

  7. PART 6 OPERATIONSPrevious MatchNext Match

    1. 30.Operation of generating stationPrevious MatchNext Match

    2. 31.Deemed marine licences under the 2009 ActPrevious MatchNext Match

  8. PART 7 MISCELLANEOUS AND GENERALPrevious MatchNext Match

    1. 32.Application of landlord and tenant lawPrevious MatchNext Match

    2. 33.Operational land for purposes of the 1990 ActPrevious MatchNext Match

    3. 34.Felling or lopping of trees and removal of hedgerowsPrevious MatchNext Match

    4. 35.Trees subject to tree preservation ordersPrevious MatchNext Match

    5. 36.Certification of plans and documents, etc.Previous MatchNext Match

    6. 37.ArbitrationPrevious MatchNext Match

    7. 38.Requirements, appeals, etc.Previous MatchNext Match

    8. 39.Abatement of works abandoned or decayedPrevious MatchNext Match

    9. 40.Saving provisions for Trinity HousePrevious MatchNext Match

    10. 41.Crown rightsPrevious MatchNext Match

    11. 42.Protective provisionsPrevious MatchNext Match

    12. 43.FundingPrevious MatchNext Match

    13. 44.Service of noticesPrevious MatchNext Match

    14. 45.Compensation provisionsPrevious MatchNext Match

  9. SignaturePrevious MatchNext Match

  10. SCHEDULES

    1. SCHEDULE 1Previous MatchNext Match

      AUTHORISED PROJECTPrevious MatchNext Match

      1. PART 1 AUTHORISED DEVELOPMENTPrevious MatchNext Match

        1. 1.A nationally significant infrastructure project as defined in sections 14...Previous MatchNext Match

        2. In the county of Norfolk, districts of North Norfolk, Broadland and South Norfolk

        3. In connection with such Work Nos. 1 to 5 and...

        4. and in connection with such Work Nos. 6 to 15...

        5. 2.The grid coordinates for that part of the authorised project...Previous MatchNext Match

      2. PART 2 ANCILLARY WORKSPrevious MatchNext Match

        1. 1.Works within the Order limits which have been subject to...Previous MatchNext Match

      3. PART 3 REQUIREMENTSPrevious MatchNext Match

        1. 1.Time limitsPrevious MatchNext Match

        2. 2.Detailed offshore design parametersPrevious MatchNext Match

        3. 3.(1) The total number of offshore electrical installations and offshore...Previous MatchNext Match

        4. 4.The total volume of scour protection for wind turbine generators,...Previous MatchNext Match

        5. 5.(1) The number of cable circuits shall not exceed six....Previous MatchNext Match

        6. 6.Phases of authorised developmentPrevious MatchNext Match

        7. 7.Detailed design approval onshorePrevious MatchNext Match

        8. 8.Provision of landscapingPrevious MatchNext Match

        9. 9.Implementation and maintenance of landscapingPrevious MatchNext Match

        10. 10.Ecological management planPrevious MatchNext Match

        11. 11.Highway accessesPrevious MatchNext Match

        12. 12.Fencing and other means of enclosurePrevious MatchNext Match

        13. 13.Surface and foul water drainagePrevious MatchNext Match

        14. 14.Contaminated land and groundwater schemePrevious MatchNext Match

        15. 15.Surface waterPrevious MatchNext Match

        16. 16.Onshore ArchaeologyPrevious MatchNext Match

        17. 17.Code of construction practicePrevious MatchNext Match

        18. 18.Construction traffic management planPrevious MatchNext Match

        19. 19.European protected species onshorePrevious MatchNext Match

        20. 20.Restoration of land used temporarily for constructionPrevious MatchNext Match

        21. 21.Control of noise during operational phasePrevious MatchNext Match

        22. 22.Local skills and employmentPrevious MatchNext Match

        23. 23.Onshore decommissioningPrevious MatchNext Match

        24. 24.Notification of generation of powerPrevious MatchNext Match

        25. 25.Requirement for written approvalPrevious MatchNext Match

        26. 26.Amendments to approved detailsPrevious MatchNext Match

    2. SCHEDULE 2Previous MatchNext Match

      STREETS SUBJECT TO STREET WORKSPrevious MatchNext Match

    3. SCHEDULE 3Previous MatchNext Match

      STREETS TO BE TEMPORARILY STOPPED UPPrevious MatchNext Match

    4. SCHEDULE 4Previous MatchNext Match

      PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UPPrevious MatchNext Match

    5. SCHEDULE 5Previous MatchNext Match

      ACCESS TO WORKSPrevious MatchNext Match

    6. SCHEDULE 6Previous MatchNext Match

      LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIREDPrevious MatchNext Match

    7. SCHEDULE 7Previous MatchNext Match

      MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTSPrevious MatchNext Match

      1. 1.The enactments for the time being in force with respect...Previous MatchNext Match

      2. 2.(1) Without limitation on the scope of paragraph 1, the...Previous MatchNext Match

      3. 3.(1) Without limitation on the scope of paragraph 1, the...Previous MatchNext Match

      4. 4.Application of Part 1 (compulsory purchase under Acquisition of Land Act of 1946) of the 1965 ActPrevious MatchNext Match

      5. 5.For section 7 (measure of compensation in case of severance)...Previous MatchNext Match

      6. 6.The following provisions of the 1965 Act (which state the...Previous MatchNext Match

      7. 7.Section 11 (powers of entry) of the 1965 Act is...Previous MatchNext Match

      8. 8.Section 20 (tenants at will, etc.) of the 1965 Act...Previous MatchNext Match

      9. 9.Section 22 (interests omitted from purchase) of the 1965 Act...Previous MatchNext Match

      10. 10.For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A...Previous MatchNext Match

    8. SCHEDULE 8Previous MatchNext Match

      LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENPrevious MatchNext Match

    9. SCHEDULE 9Previous MatchNext Match

      PROTECTIVE PROVISIONSPrevious MatchNext Match

      1. PART 1 PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERSPrevious MatchNext Match

        1. 1.ApplicationPrevious MatchNext Match

        2. 2.In this Part— “affected undertaker” means any licence holder within...Previous MatchNext Match

        3. 3.Precedence of the 1991 Act in respect of apparatus in the streetsPrevious MatchNext Match

        4. 4.No acquisition etc. except by agreementPrevious MatchNext Match

        5. 5.Removal of apparatusPrevious MatchNext Match

        6. 6.Facilities and rights for alternative apparatusPrevious MatchNext Match

        7. 7.Retained apparatusPrevious MatchNext Match

        8. 8.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        9. 9.Expenses and costsPrevious MatchNext Match

        10. 10.Nothing in this Part affects the provisions of any enactment...Previous MatchNext Match

      2. PART 2 FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS UNDERTAKERPrevious MatchNext Match

        1. 1.ApplicationPrevious MatchNext Match

        2. 2.InterpretationPrevious MatchNext Match

        3. 3.Except for paragraphs 4 (apparatus of National Grid in streets...Previous MatchNext Match

        4. 4.Apparatus of National Grid in streets subject to temporary stopping upPrevious MatchNext Match

        5. 5.Protective works to buildingsPrevious MatchNext Match

        6. 6.Acquisition of landPrevious MatchNext Match

        7. 7.Removal of apparatusPrevious MatchNext Match

        8. 8.Facilities and rights for alternative apparatusPrevious MatchNext Match

        9. 9.Retained apparatus: protection of National Grid as Gas UndertakerPrevious MatchNext Match

        10. 10.(1) Not less than 56 days before the commencement of...Previous MatchNext Match

        11. 11.ExpensesPrevious MatchNext Match

        12. 12.IndemnityPrevious MatchNext Match

        13. 13.Enactments and agreementsPrevious MatchNext Match

        14. 14.Co-operationPrevious MatchNext Match

        15. 15.AccessPrevious MatchNext Match

        16. 16.ArbitrationPrevious MatchNext Match

        17. 17.NoticesPrevious MatchNext Match

      3. PART 3 FOR THE PROTECTION OF CADENT GAS LIMITED AS GAS UNDERTAKERPrevious MatchNext Match

        1. 1.ApplicationPrevious MatchNext Match

        2. 2.InterpretationPrevious MatchNext Match

        3. 3.Except for paragraphs 4 (apparatus of Cadent Gas Limited in...Previous MatchNext Match

        4. 4.Apparatus of Cadent Gas Limited in streets subject to temporary stopping upPrevious MatchNext Match

        5. 5.Protective works to buildingsPrevious MatchNext Match

        6. 6.Acquisition of landPrevious MatchNext Match

        7. 7.Removal of apparatusPrevious MatchNext Match

        8. 8.Facilities and rights for alternative apparatusPrevious MatchNext Match

        9. 9.Retained apparatus: protection of Cadent Gas Limited as Gas UndertakerPrevious MatchNext Match

        10. 10.ExpensesPrevious MatchNext Match

        11. 11.IndemnityPrevious MatchNext Match

        12. 12.Enactments and agreementsPrevious MatchNext Match

        13. 13.Co-operationPrevious MatchNext Match

        14. 14.AccessPrevious MatchNext Match

        15. 15.ArbitrationPrevious MatchNext Match

        16. 16.NoticesPrevious MatchNext Match

      4. PART 4 PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKSPrevious MatchNext Match

        1. 1.(1) For the protection of any operator, the following provisions,...Previous MatchNext Match

        2. 2.In this Part— “the 2003 Act” means the Communications Act...Previous MatchNext Match

        3. 3.The exercise of the powers of article 28 (statutory undertakers)...Previous MatchNext Match

        4. 4.(1) Subject to sub-paragraphs (2) to (4), if as the...Previous MatchNext Match

        5. 5.This Part does not apply to— (a) any apparatus in...Previous MatchNext Match

        6. 6.Nothing in this Part affects the provisions of any enactment...Previous MatchNext Match

      5. PART 5 PROTECTION OF NETWORK RAIL INFRASTRUCTURE LIMITEDPrevious MatchNext Match

        1. 1.The following provisions of this Part of this Schedule have...Previous MatchNext Match

        2. 2.In this Part— “construction” includes execution, placing, alteration and reconstruction...Previous MatchNext Match

        3. 3.(1) Where under this Part Network Rail is required to...Previous MatchNext Match

        4. 4.(1) The undertaker must before commencing construction of any specified...Previous MatchNext Match

        5. 5.(1) Any specified work and any protective works to be...Previous MatchNext Match

        6. 6.The undertaker must— (a) at all times afford reasonable facilities...Previous MatchNext Match

        7. 7.Network Rail must at all times afford reasonable facilities to...Previous MatchNext Match

        8. 8.(1) If any permanent or temporary alterations or additions to...Previous MatchNext Match

        9. 9.The undertaker must pay to Network Rail all reasonable fees,...Previous MatchNext Match

        10. 10.(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...Previous MatchNext Match

        11. 11.If at any time after the completion of a specified...Previous MatchNext Match

        12. 12.The undertaker must not provide any illumination or illuminated sign...Previous MatchNext Match

        13. 13.Any additional expenses which Network Rail may reasonably incur in...Previous MatchNext Match

        14. 14.(1) The undertaker must— (a) pay to Network Rail all...Previous MatchNext Match

        15. 15.Network Rail must, on receipt of a request from the...Previous MatchNext Match

        16. 16.In the assessment of any sums payable to Network Rail...Previous MatchNext Match

        17. 17.The undertaker and Network Rail may, subject in the case...Previous MatchNext Match

        18. 18.Nothing in this Order, or in any enactment incorporated with...Previous MatchNext Match

        19. 19.The undertaker must give written notice to Network Rail if...Previous MatchNext Match

        20. 20.In relation to any dispute arising under this Part that...Previous MatchNext Match

        21. 21.The undertaker must no later than 28 days from the...Previous MatchNext Match

      6. PART 6 FOR THE PROTECTION OF ANGLIAN WATER SERVICES LIMITEDPrevious MatchNext Match

        1. 1.For the protection of Anglian Water, the following provisions of...Previous MatchNext Match

        2. 2.In this Part— “alternative apparatus” means alternative apparatus adequate to...Previous MatchNext Match

        3. 3.This Part does not apply to apparatus to the extent...Previous MatchNext Match

        4. 4.The undertaker must not interfere with, build over or near...Previous MatchNext Match

        5. 5.The alteration, extension, removal or re-location of any apparatus shall...Previous MatchNext Match

        6. 6.In the situation, where in exercise of the powers conferred...Previous MatchNext Match

        7. 7.Regardless of any provision in this Order or anything shown...Previous MatchNext Match

        8. 8.If the undertaker is unable to create the new rights...Previous MatchNext Match

        9. 9.If in consequence of the exercise of the powers conferred...Previous MatchNext Match

        10. 10.If in consequence of the exercise of the powers conferred...Previous MatchNext Match

        11. 11.If for any reason or in consequence of the construction...Previous MatchNext Match

        12. 12.Nothing in paragraph 11 above imposes any liability on the...Previous MatchNext Match

        13. 13.Anglian Water must give the undertaker reasonable notice of any...Previous MatchNext Match

        14. 14.Anglian Water must use its reasonable endeavours to mitigate in...Previous MatchNext Match

        15. 15.Any difference or dispute arising between the undertaker and Anglian...Previous MatchNext Match

      7. PART 7 FOR THE PROTECTION OF THE ENVIRONMENT AGENCY AND DRAINAGE AUTHORITIESPrevious MatchNext Match

        1. 1.The provisions of this Part have effect for the protection...Previous MatchNext Match

        2. 2.In this Part— “construction” includes execution, placing, altering, replacing, relaying...Previous MatchNext Match

        3. 3.(1) Before beginning to construct any specified work, the undertaker...Previous MatchNext Match

        4. 4.Without limiting paragraph 3, the requirements which the drainage authority...Previous MatchNext Match

        5. 5.(1) Subject to sub-paragraph (2), any specified work, and all...Previous MatchNext Match

        6. 6.(1) Subject to sub-paragraph (5) the undertaker must from the...Previous MatchNext Match

        7. 7.If by reason of the construction of any specified work...Previous MatchNext Match

        8. 8.The undertaker must indemnify the drainage authority in respect of...Previous MatchNext Match

        9. 9.(1) Without limiting the other provisions of this Part, the...Previous MatchNext Match

        10. 10.The fact that any work or thing has been executed...Previous MatchNext Match

        11. 11.Any dispute between the undertaker and the drainage authority under...Previous MatchNext Match

      8. PART 8 FOR THE PROTECTION OF NORFOLK VANGUARDPrevious MatchNext Match

        1. 1.The provisions of this Part apply for the protection of...Previous MatchNext Match

        2. 2.In this Part— “apparatus” means the cables, structures or other...Previous MatchNext Match

        3. 3.The consent of Vanguard under this Part is not required...Previous MatchNext Match

        4. 4.Where conditions are included in any consent granted by Vanguard...Previous MatchNext Match

        5. 5.The undertaker must not under the powers of this Order—...Previous MatchNext Match

        6. 6.(1) The undertaker must not under the powers of this...Previous MatchNext Match

        7. 7.(1) The undertaker must give to Vanguard not less than...Previous MatchNext Match

        8. 8.The undertaker must at all reasonable times during construction of...Previous MatchNext Match

        9. 9.(1) After the purpose of any temporary works has been...Previous MatchNext Match

        10. 10.If in consequence of the exercise of the powers conferred...Previous MatchNext Match

        11. 11.The undertaker must not exercise the powers conferred by this...Previous MatchNext Match

        12. 12.To ensure its compliance with this Part, the undertaker must...Previous MatchNext Match

        13. 13.The undertaker and Vanguard must each act in good faith...Previous MatchNext Match

        14. 14.The undertaker must pay to Vanguard the reasonable expenses incurred...Previous MatchNext Match

        15. 15.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        16. 16.Any dispute arising between the undertaker and Vanguard under this...Previous MatchNext Match

      9. PART 9 FOR THE PROTECTION OF NORFOLK BOREASPrevious MatchNext Match

        1. 1.The provisions of this Part apply for the protection of...Previous MatchNext Match

        2. 2.In this Part— “apparatus” means the cables, structures or other...Previous MatchNext Match

        3. 3.The consent of Boreas under this Part is not required...Previous MatchNext Match

        4. 4.Where conditions are included in any consent granted by Boreas...Previous MatchNext Match

        5. 5.The undertaker must not under the powers of this Order—...Previous MatchNext Match

        6. 6.(1) The undertaker must not under the powers of this...Previous MatchNext Match

        7. 7.(1) The undertaker must give to Boreas not less than...Previous MatchNext Match

        8. 8.The undertaker must at all reasonable times during construction of...Previous MatchNext Match

        9. 9.(1) After the purpose of any temporary works has been...Previous MatchNext Match

        10. 10.If in consequence of the exercise of the powers conferred...Previous MatchNext Match

        11. 11.The undertaker must not exercise the powers conferred by this...Previous MatchNext Match

        12. 12.To ensure its compliance with this Part, the undertaker must...Previous MatchNext Match

        13. 13.The undertaker and Boreas must each act in good faith...Previous MatchNext Match

        14. 14.The undertaker must pay to Boreas the reasonable expenses incurred...Previous MatchNext Match

        15. 15.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        16. 16.Any dispute arising between the undertaker and Boreas under this...Previous MatchNext Match

    10. SCHEDULE 10Previous MatchNext Match

      1. PART 1 REMOVAL OF HEDGEROWSPrevious MatchNext Match

      2. PART 2 REMOVAL OF IMPORTANT HEDGEROWSPrevious MatchNext Match

    11. SCHEDULE 11Previous MatchNext Match

      DEEMED MARINE LICENCE UNDER THE 2009 ACT—GENERATION ASSETSPrevious MatchNext Match

      1. PART 1 LICENSED MARINE ACTIVITIESPrevious MatchNext Match

        1. 1.(1) In this licence— “the 2004 Act” means the Energy...Previous MatchNext Match

        2. 2.Details of licensed marine activitiesPrevious MatchNext Match

        3. 3.Such activities are authorised in relation to the construction, maintenance...Previous MatchNext Match

        4. 4.The substances or articles authorised for deposit at sea are—...Previous MatchNext Match

        5. 5.The grid coordinates for that part of the authorised development...Previous MatchNext Match

        6. 6.This licence remains in force until the authorised project has...Previous MatchNext Match

        7. 7.The provisions of sections 72 (variation, suspension, revocation and transfer)...Previous MatchNext Match

        8. 8.With respect to any condition which requires the licensed activities...Previous MatchNext Match

        9. 9.Any amendments to or variations from the approved plans, protocols...Previous MatchNext Match

      2. PART 2 CONDITIONSPrevious MatchNext Match

        1. 1.Design parametersPrevious MatchNext Match

        2. 2.(1) The total number of offshore accommodation platforms forming part...Previous MatchNext Match

        3. 3.(1) The total length of the cables in Work No.1(c)...Previous MatchNext Match

        4. 4.Phases of authorised developmentPrevious MatchNext Match

        5. 5.Maintenance of the authorised developmentPrevious MatchNext Match

        6. 6.Extension of time periodsPrevious MatchNext Match

        7. 7.Notifications and inspectionsPrevious MatchNext Match

        8. 8.Aids to navigationPrevious MatchNext Match

        9. 9.(1) The undertaker must colour all structures yellow (colour code...Previous MatchNext Match

        10. 10.Aviation safetyPrevious MatchNext Match

        11. 11.Chemicals, drilling and debrisPrevious MatchNext Match

        12. 12.Force majeurePrevious MatchNext Match

        13. 13.Pre-construction plans and documentationPrevious MatchNext Match

        14. 14.(1) Each programme, statement, plan, protocol or scheme required to...Previous MatchNext Match

        15. 15.Offshore safety managementPrevious MatchNext Match

        16. 16.Reporting of engaged agents, contractors and vesselsPrevious MatchNext Match

        17. 17.Pre-construction monitoring and surveysPrevious MatchNext Match

        18. 18.Construction monitoringPrevious MatchNext Match

        19. 19.Post-construction monitoringPrevious MatchNext Match

        20. 20.Timing of monitoring reportPrevious MatchNext Match

        21. 21.Updating of cable monitoring planPrevious MatchNext Match

        22. 22.Reporting of impact pile drivingPrevious MatchNext Match

        23. 23.Reporting of cable protectionPrevious MatchNext Match

        24. 24.Decommissioning of cable protection within marine protected areasPrevious MatchNext Match

    12. SCHEDULE 12Previous MatchNext Match

      DEEMED MARINE LICENCE UNDER THE 2009 ACT – TRANSMISSION ASSETSPrevious MatchNext Match

      1. PART 1 LICENSED MARINE ACTIVITIESPrevious MatchNext Match

        1. 1.(1) In this licence— “the 2004 Act” means the Energy...Previous MatchNext Match

        2. 2.Details of licensed marine activitiesPrevious MatchNext Match

        3. 3.Such activities are authorised in relation to the construction, maintenance...Previous MatchNext Match

        4. 4.The substances or articles authorised for deposit at sea are—...Previous MatchNext Match

        5. 5.The grid coordinates for that part of the authorised development...Previous MatchNext Match

        6. 6.This licence remains in force until the authorised project has...Previous MatchNext Match

        7. 7.The provisions of section 72 (variation, suspension, revocation and transfer)...Previous MatchNext Match

        8. 8.With respect to any condition which requires the licensed activities...Previous MatchNext Match

        9. 9.Any amendments to or variations from the approved plans, protocols...Previous MatchNext Match

      2. PART 2 CONDITIONSPrevious MatchNext Match

        1. 1.Design parametersPrevious MatchNext Match

        2. 2.(1) The dimensions of any offshore type 1 substations forming...Previous MatchNext Match

        3. 3.(1) The total length of the cables and the volume...Previous MatchNext Match

        4. 4.(1) The total length of the cables in Work No.2(c)...Previous MatchNext Match

        5. 5.Phases of authorised developmentPrevious MatchNext Match

        6. 6.Maintenance of the authorised developmentPrevious MatchNext Match

        7. 7.Extension of time periodsPrevious MatchNext Match

        8. 8.Notifications and inspectionsPrevious MatchNext Match

        9. 9.Aids to navigationPrevious MatchNext Match

        10. 10.The undertaker must colour all structures yellow (colour code RAL...Previous MatchNext Match

        11. 11.Aviation safetyPrevious MatchNext Match

        12. 12.Chemicals, drilling and debrisPrevious MatchNext Match

        13. 13.Force majeurePrevious MatchNext Match

        14. 14.Pre-construction plans and documentationPrevious MatchNext Match

        15. 15.(1) Each programme, statement, plan, protocol or scheme required to...Previous MatchNext Match

        16. 16.Offshore safety managementPrevious MatchNext Match

        17. 17.Reporting of engaged agents, contractors and vesselsPrevious MatchNext Match

        18. 18.Pre-construction monitoring and surveysPrevious MatchNext Match

        19. 19.Construction monitoringPrevious MatchNext Match

        20. 20.Post-construction monitoringPrevious MatchNext Match

        21. 21.Timing of monitoring reportPrevious MatchNext Match

        22. 22.Reporting of impact pile drivingPrevious MatchNext Match

        23. 23.Reporting of cable protectionPrevious MatchNext Match

        24. 24.Decommissioning of cable protection within marine protected areasPrevious MatchNext Match

    13. SCHEDULE 13Previous MatchNext Match

      ARBITRATION RULESPrevious MatchNext Match

      1. 1.Primary objectivePrevious MatchNext Match

      2. 2.Time periodsPrevious MatchNext Match

      3. 3.TimetablePrevious MatchNext Match

      4. 4.ProcedurePrevious MatchNext Match

      5. 5.Arbitrator's powersPrevious MatchNext Match

      6. 6.CostsPrevious MatchNext Match

      7. 7.ConfidentialityPrevious MatchNext Match

    14. SCHEDULE 14Previous MatchNext Match

      COMPENSATION MEASURESPrevious MatchNext Match

      1. PART 1 KITTIWAKE COMPENSATION MEASURESPrevious MatchNext Match

        1. 1.In this Schedule: “the FFC” means the site designated as...Previous MatchNext Match

        2. 2.The authorised development may not be commenced until a plan...Previous MatchNext Match

        3. 3.The KIMP must be submitted to the Secretary of State...Previous MatchNext Match

        4. 4.The undertaker must implement the measures as set out in...Previous MatchNext Match

        5. 5.The undertaker shall notify the Secretary of State of completion...Previous MatchNext Match

        6. 6.Once the measures have been implemented the undertaker shall provide...Previous MatchNext Match

        7. 7.The artificial nest structures must not be decommissioned without written...Previous MatchNext Match

        8. 8.The KIMP approved under this Schedule includes any amendments that...Previous MatchNext Match

      2. PART 2 BENTHIC COMPENSATION MEASURESPrevious MatchNext Match

        1. 9.Benthic compensation measuresPrevious MatchNext Match

        2. 10.The authorised development may not be commenced until a plan...Previous MatchNext Match

        3. 11.The Steering Group must be consulted on i) the proposed...Previous MatchNext Match

        4. 12.A SIP for each of the NNSSR and the WNNC...Previous MatchNext Match

        5. 13.Each SIP must accord with the principles set out in...Previous MatchNext Match

        6. 14.No cable installation works in Work No. 2(c) and (d),...Previous MatchNext Match

        7. 15.No cable installation work in Work No, 2(c) and (d),...Previous MatchNext Match

        8. 16.The measures in the SIPs must be carried out in...Previous MatchNext Match

        9. 17.No later than four months prior to each deployment of...Previous MatchNext Match

        10. 18.A SIP approved under this Schedule, includes any amendments that...Previous MatchNext Match

  11. Explanatory NotePrevious Match

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources