The Riverside Energy Park Order 2020

Changes to legislation:

There are currently no known outstanding effects for the The Riverside Energy Park Order 2020. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Information:

You searched for provisions that are applicable to England. The matching provisions are highlighted below. Where no highlighting is shown the matching result may be contained within a footnote.

  1. Introductory TextNext Match

  2. PART 1 PRELIMINARYPrevious MatchNext Match

    1. 1.Citation and commencementPrevious MatchNext Match

    2. 2.InterpretationPrevious MatchNext Match

  3. PART 2 WORK PROVISIONSPrevious MatchNext Match

    1. Principal powersPrevious MatchNext Match

      1. 3.Development consent granted by the OrderPrevious MatchNext Match

      2. 4.Maintenance of authorised developmentPrevious MatchNext Match

      3. 5.Operation of the authorised developmentPrevious MatchNext Match

      4. 6.Disapplication of legislative provisions and modifications to section 36 consent and RRRF planning permissionPrevious MatchNext Match

      5. 7.Port of London Act 1968Previous MatchNext Match

      6. 8.Benefit of this OrderPrevious MatchNext Match

      7. 9.Consent to transfer benefit of the OrderPrevious MatchNext Match

      8. 10.Guarantees in respect of payment of compensationPrevious MatchNext Match

    2. StreetsPrevious MatchNext Match

      1. 11.Street worksPrevious MatchNext Match

      2. 12.Power to alter layout, etc., of streetsPrevious MatchNext Match

      3. 13.Temporary prohibition or restriction of use of streets and public rights of wayPrevious MatchNext Match

      4. 14.Permanent stopping up of streetsPrevious MatchNext Match

      5. 15.Access to worksPrevious MatchNext Match

      6. 16.Agreements with street authoritiesPrevious MatchNext Match

      7. 17.Traffic regulation measuresPrevious MatchNext Match

    3. Supplementary powersPrevious MatchNext Match

      1. 18.Discharge of waterPrevious MatchNext Match

      2. 19.Authority to survey and investigate the landPrevious MatchNext Match

      3. 20.Protective work to buildingsPrevious MatchNext Match

      4. 21.Felling or lopping of treesPrevious MatchNext Match

  4. PART 3 POWERS OF ACQUISITION AND POSSESSION OF LANDPrevious MatchNext Match

    1. Powers of acquisitionPrevious MatchNext Match

      1. 22.Compulsory acquisition of landPrevious MatchNext Match

      2. 23.Time limit for exercise of authority to acquire land compulsorilyPrevious MatchNext Match

      3. 24.Compulsory acquisition of rightsPrevious MatchNext Match

      4. 25.Acquisition of subsoil onlyPrevious MatchNext Match

      5. 26.Private rightsPrevious MatchNext Match

      6. 27.Power to override easements and other rightsPrevious MatchNext Match

      7. 28.Application of the 1981 ActPrevious MatchNext Match

      8. 29.Modification of Part 1 of the 1965 ActPrevious MatchNext Match

      9. 30.Rights under or over streetsPrevious MatchNext Match

    2. Temporary possession of landPrevious MatchNext Match

      1. 31.Temporary use of land for carrying out the authorised developmentPrevious MatchNext Match

      2. 32.Temporary use of land for maintaining the authorised developmentPrevious MatchNext Match

    3. SupplementaryPrevious MatchNext Match

      1. 33.Statutory undertakersPrevious MatchNext Match

      2. 34.Apparatus and rights of statutory undertakers in stopped up streetsPrevious MatchNext Match

      3. 35.Recovery of costs of new connectionsPrevious MatchNext Match

  5. PART 4 MISCELLANEOUS AND GENERALPrevious MatchNext Match

    1. 36.Application of landlord and tenant lawPrevious MatchNext Match

    2. 37.Operational land for the purposes of the 1990 ActPrevious MatchNext Match

    3. 38.Defence to proceedings in respect of statutory nuisancePrevious MatchNext Match

    4. 39.Protective provisionsPrevious MatchNext Match

    5. 40.Certification of plans etc.Previous MatchNext Match

    6. 41.Service of noticesPrevious MatchNext Match

    7. 42.Procedures in relation to certain approvals etc.Previous MatchNext Match

    8. 43.No double recoveryPrevious MatchNext Match

  6. SignaturePrevious MatchNext Match

  7. SCHEDULES

    1. SCHEDULE 1Previous MatchNext Match

      AUTHORISED DEVELOPMENTPrevious MatchNext Match

      1. A nationally significant infrastructure project as defined in section 14(1)(a)...

      2. In the London Borough of Bexley

      3. Work No. 1 — Works to construct an integrated energy...

      4. Work No. 2 — Works to construct—

      5. Work No. 3 — Works to construct and install combined...

      6. Work No.4 — Works to construct an electrical substation including...

      7. Work No. 5 — Works to construct or install supporting...

      8. Work No. 6 — Works to construct and install supporting...

      9. Work No. 7 — Works to construct and install from...

      10. Work No. 8 — Works to construct temporary construction compounds...

      11. In the London Borough of Bexley and the Borough of...

      12. Work No. 9 — Works to construct and install an...

      13. In the Borough of Dartford

      14. Work No. 10 — Works to connect the electrical connection...

      15. In connection with and in addition to Work Nos. 1,...

    2. SCHEDULE 2Previous MatchNext Match

      REQUIREMENTSPrevious MatchNext Match

      1. 1.Time limitsPrevious MatchNext Match

      2. 2.Detailed design approvalPrevious MatchNext Match

      3. 3.Parameters of authorised developmentPrevious MatchNext Match

      4. 4.Pre–commencement biodiversity mitigation strategyPrevious MatchNext Match

      5. 5.Biodiversity and landscape mitigation strategyPrevious MatchNext Match

      6. 6.Replacement planting for Work No. 9Previous MatchNext Match

      7. 7.ArchaeologyPrevious MatchNext Match

      8. 8.Highway accessPrevious MatchNext Match

      9. 9.Surface and foul water drainagePrevious MatchNext Match

      10. 10.Ground conditions and ground stabilityPrevious MatchNext Match

      11. 11.Code of construction practicePrevious MatchNext Match

      12. 12.Construction HoursPrevious MatchNext Match

      13. 13.Construction traffic management plan(s)Previous MatchNext Match

      14. 14.Heavy commercial vehicle movements delivering wastePrevious MatchNext Match

      15. 15.Emission limits – Work No. 1BPrevious MatchNext Match

      16. 16.Waste hierarchy schemePrevious MatchNext Match

      17. 17.Operational worker travel planPrevious MatchNext Match

      18. 18.Operational lighting strategyPrevious MatchNext Match

      19. 19.Control of operational noisePrevious MatchNext Match

      20. 20.River wallPrevious MatchNext Match

      21. 21.Community benefitsPrevious MatchNext Match

      22. 22.Notice of start of commissioning and notice of date of final commissioningPrevious MatchNext Match

      23. 23.Phasing of construction and commissioning of Work No. 1Previous MatchNext Match

      24. 24.Combined heat and powerPrevious MatchNext Match

      25. 25.Use of compost material and gas from Work No. 1BPrevious MatchNext Match

      26. 26.DecommissioningPrevious MatchNext Match

      27. 27.Amendments to approved detailsPrevious MatchNext Match

      28. 28.Flood Risk Activity Permit AreaPrevious MatchNext Match

      29. 29.Finished Floor LevelsPrevious MatchNext Match

      30. 30.Metropolitan Open LandPrevious MatchNext Match

      31. 31.Delivery and Servicing PlanPrevious MatchNext Match

      32. 32.Tonnage capPrevious MatchNext Match

      33. 33.Notification from the undertakerPrevious MatchNext Match

    3. SCHEDULE 3Previous MatchNext Match

      STREETS SUBJECT TO STREET WORKSPrevious MatchNext Match

    4. SCHEDULE 4Previous MatchNext Match

      STREETS SUBJECT TO PERMANENT AND TEMPORARY ALTERATION OF LAYOUTPrevious MatchNext Match

      1. PART 1 PERMANENT ALTERATION OF LAYOUTPrevious MatchNext Match

      2. PART 2 TEMPORARY ALTERATION OF LAYOUTPrevious MatchNext Match

    5. SCHEDULE 5Previous MatchNext Match

      TEMPORARY PROHIBITION OR RESTRICTION OF THE USE OF STREETS OR PUBLIC RIGHTS OF WAYPrevious MatchNext Match

    6. SCHEDULE 6Previous MatchNext Match

      PERMANENT STOPPING UP OF STREETSPrevious MatchNext Match

    7. SCHEDULE 7Previous MatchNext Match

      LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIREDPrevious MatchNext Match

      1. 1.InterpretationPrevious MatchNext Match

    8. SCHEDULE 8Previous MatchNext Match

      MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTSPrevious MatchNext Match

      1. 1.Compensation enactmentsPrevious MatchNext Match

      2. 2.(1) Without limitation on the scope of paragraph 1, the...Previous MatchNext Match

      3. 3.(1) Without limitation on the scope of paragraph 1, the...Previous MatchNext Match

      4. 4.Application of Part 1 of the 1965 ActPrevious MatchNext Match

      5. 5.(1) The modifications referred to in paragraph 4(a) are as...Previous MatchNext Match

    9. SCHEDULE 9Previous MatchNext Match

      LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENPrevious MatchNext Match

    10. SCHEDULE 10Previous MatchNext Match

      PROTECTIVE PROVISIONSPrevious MatchNext Match

      1. PART 1 FOR THE PROTECTION OF RRRLPrevious MatchNext Match

        1. 1.For the protection of RRRL as referred to in this...Previous MatchNext Match

        2. 2.In this part of this Schedule “access road” means that...Previous MatchNext Match

        3. 3.Upon the permanent stopping up of the access road pursuant...Previous MatchNext Match

        4. 4.The undertaker must not install pipes for the offtake of...Previous MatchNext Match

        5. 5.Regardless of the temporary prohibition or restriction of use of...Previous MatchNext Match

        6. 6.Regardless of any provision in this Order or anything shown...Previous MatchNext Match

        7. 7.(1) If, in the exercise of the powers conferred by...Previous MatchNext Match

        8. 8.(1) Where, in accordance with the provisions of this part...Previous MatchNext Match

        9. 9.(1) Not less than 28 days before starting the execution...Previous MatchNext Match

        10. 10.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        11. 11.Nothing in this part of this Schedule affects the provisions...Previous MatchNext Match

        12. 12.Where in consequence of the proposed construction or maintenance of...Previous MatchNext Match

        13. 13.If in consequence of any agreement reached or the powers...Previous MatchNext Match

        14. 14.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        15. 15.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

      2. PART 2 FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERSPrevious MatchNext Match

        1. 16.The provisions of this Part have effect for the protection...Previous MatchNext Match

        2. 17.In this Part of this Schedule— “alternative apparatus” means alternative...Previous MatchNext Match

        3. 18.This Part of this Schedule does not apply to apparatus...Previous MatchNext Match

        4. 19.Regardless of the temporary prohibition or restriction of use of...Previous MatchNext Match

        5. 20.Regardless of any provision in this Order or anything shown...Previous MatchNext Match

        6. 21.(1) If, in the exercise of the powers conferred by...Previous MatchNext Match

        7. 22.(1) Where, in accordance with the provisions of this Part...Previous MatchNext Match

        8. 23.(1) Not less than 28 days before starting the execution...Previous MatchNext Match

        9. 24.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        10. 25.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        11. 26.Nothing in this Part of this Schedule affects the provisions...Previous MatchNext Match

      3. PART 3 FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKSPrevious MatchNext Match

        1. 27.(1) For the protection of any operator, the following provisions...Previous MatchNext Match

        2. 28.The exercise of the powers of article 33 (statutory undertakers)...Previous MatchNext Match

        3. 29.(1) Subject to sub-paragraphs (2) to (4), if as the...Previous MatchNext Match

        4. 30.This Part of this Schedule does not apply to— Previous MatchNext Match

        5. 31.Nothing in this Part of this Schedule affects the provisions...Previous MatchNext Match

      4. PART 4 FOR THE PROTECTION OF THE ENVIRONMENT AGENCYPrevious MatchNext Match

        1. 32.(1) The following provisions shall apply for the protection of...Previous MatchNext Match

        2. 33.The provisions within this Part shall not apply where a...Previous MatchNext Match

        3. 34.(1) Before beginning to construct any specified work, the undertaker...Previous MatchNext Match

        4. 35.Without limiting paragraph 34, the requirements which the Agency may...Previous MatchNext Match

        5. 36.No buildings will be erected within the area defined by...Previous MatchNext Match

        6. 37.(1) Subject to sub-paragraph (2), any specified work, and all...Previous MatchNext Match

        7. 38.(1) Subject to sub–paragraph (6), the undertaker must from the...Previous MatchNext Match

        8. 39.Subject to paragraph 41, if by reason of the construction...Previous MatchNext Match

        9. 40.If by reason of construction of the specified work the...Previous MatchNext Match

        10. 41.The undertaker must indemnify the Agency in respect of all...Previous MatchNext Match

        11. 42.(1) The undertaker is responsible for and must indemnify the...Previous MatchNext Match

        12. 43.Any dispute arising between the undertaker and the Agency under...Previous MatchNext Match

      5. PART 5 FOR THE PROTECTION OF RAILWAY INTERESTSPrevious MatchNext Match

        1. 44.The following provisions of this Part of this Schedule have...Previous MatchNext Match

        2. 45.In this Part of this Schedule— “construction” includes execution, placing,...Previous MatchNext Match

        3. 46.(1) Where under this Part of this Schedule Network Rail...Previous MatchNext Match

        4. 47.(1) The undertaker must not exercise the powers conferred by—...Previous MatchNext Match

        5. 48.(1) The undertaker must before commencing construction of any specified...Previous MatchNext Match

        6. 49.(1) Any specified work and any protective works to be...Previous MatchNext Match

        7. 50.The undertaker must— (a) at all times afford reasonable facilities...Previous MatchNext Match

        8. 51.Network Rail must at all times afford reasonable facilities to...Previous MatchNext Match

        9. 52.(1) If any permanent or temporary alterations or additions to...Previous MatchNext Match

        10. 53.The undertaker must repay to Network Rail all reasonable fees,...Previous MatchNext Match

        11. 54.(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...Previous MatchNext Match

        12. 55.If at any time after the completion of a specified...Previous MatchNext Match

        13. 56.The undertaker must not provide any illumination or illuminated sign...Previous MatchNext Match

        14. 57.Any additional expenses which Network Rail may reasonably incur in...Previous MatchNext Match

        15. 58.(1) The undertaker must pay to Network Rail all reasonable...Previous MatchNext Match

        16. 59.Network Rail must, on receipt of a request from the...Previous MatchNext Match

        17. 60.In the assessment of any sums payable to Network Rail...Previous MatchNext Match

        18. 61.The undertaker and Network Rail may, subject in the case...Previous MatchNext Match

        19. 62.Nothing in this Order, or in any enactment incorporated with...Previous MatchNext Match

        20. 63.The undertaker must give written notice to Network Rail if...Previous MatchNext Match

        21. 64.The undertaker must no later than 28 days from the...Previous MatchNext Match

        22. 65.In relation to any dispute arising under this Part of...Previous MatchNext Match

      6. PART 6 FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY UNDERTAKERPrevious MatchNext Match

        1. 66.For the protection of National Grid referred to in this...Previous MatchNext Match

        2. 67.InterpretationPrevious MatchNext Match

        3. 68.On Street ApparatusPrevious MatchNext Match

        4. 69.Apparatus of National Grid in stopped up streetsPrevious MatchNext Match

        5. 70.Protective works to buildingsPrevious MatchNext Match

        6. 71.Acquisition of landPrevious MatchNext Match

        7. 72.Removal of apparatusPrevious MatchNext Match

        8. 73.Facilities and rights for alternative apparatusPrevious MatchNext Match

        9. 74.Retained apparatusPrevious MatchNext Match

        10. 75.ExpensesPrevious MatchNext Match

        11. 76.IndemnityPrevious MatchNext Match

        12. 77.Enactments and agreementsPrevious MatchNext Match

        13. 78.Co–operationPrevious MatchNext Match

        14. 79.AccessPrevious MatchNext Match

        15. 80.ArbitrationPrevious MatchNext Match

        16. 81.NoticesPrevious MatchNext Match

      7. PART 7 FOR THE PROTECTION OF UK POWER NETWORKS LIMITED, LONDON POWER NETWORKS PLC AND SOUTH EAST POWER NETWORKS PLCPrevious MatchNext Match

        1. 82.For the protection of the utility undertakers referred to in...Previous MatchNext Match

        2. 83.In this Part of this Schedule— “alternative apparatus” means alternative...Previous MatchNext Match

        3. 84.This Part of this Schedule does not apply to apparatus...Previous MatchNext Match

        4. 85.Regardless of the temporary prohibition or restriction of use of...Previous MatchNext Match

        5. 86.Regardless of any provision in this Order or anything shown...Previous MatchNext Match

        6. 87.(1) If, in the exercise of the powers conferred by...Previous MatchNext Match

        7. 88.(1) Where, in accordance with the provisions of this Part...Previous MatchNext Match

        8. 89.(1) Not less than 28 days before starting the execution...Previous MatchNext Match

        9. 90.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        10. 91.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        11. 92.Where in consequence of the proposed construction of any of...Previous MatchNext Match

        12. 93.Nothing in this Part of this Schedule affects the provisions...Previous MatchNext Match

      8. PART 8 FOR THE PROTECTION OF THAMES WATER UTILITIES LIMITEDPrevious MatchNext Match

        1. 94.ApplicationPrevious MatchNext Match

        2. 95.InterpretationPrevious MatchNext Match

        3. 96.ApparatusPrevious MatchNext Match

        4. 97.The alteration, extension, removal or relocation of any apparatus must...Previous MatchNext Match

        5. 98.In the situation where in exercise of the powers under...Previous MatchNext Match

        6. 99.Regardless of any provision in this Order or anything shown...Previous MatchNext Match

        7. 100.If in consequence of the exercise of the powers under...Previous MatchNext Match

        8. 101.If in consequence of the exercise of the powers under...Previous MatchNext Match

        9. 102.If for any reason or in consequence of the construction...Previous MatchNext Match

        10. 103.ConsultationPrevious MatchNext Match

      9. PART 9 FOR THE PROTECTION OF SOUTHERN GAS NETWORKS PLC AS GAS UNDERTAKERPrevious MatchNext Match

        1. 104.ApplicationPrevious MatchNext Match

        2. 105.InterpretationPrevious MatchNext Match

        3. 106.On Street ApparatusPrevious MatchNext Match

        4. 107.Apparatus of SGN in stopped up streetsPrevious MatchNext Match

        5. 108.Protective works to buildingsPrevious MatchNext Match

        6. 109.Acquisition of landPrevious MatchNext Match

        7. 110.Removal of apparatusPrevious MatchNext Match

        8. 111.Facilities and rights for alternative apparatusPrevious MatchNext Match

        9. 112.Retained apparatus: protection of SGNPrevious MatchNext Match

        10. 113.ExpensesPrevious MatchNext Match

        11. 114.IndemnityPrevious MatchNext Match

        12. 115.Enactments and agreementsPrevious MatchNext Match

        13. 116.Co-operationPrevious MatchNext Match

        14. 117.AccessPrevious MatchNext Match

        15. 118.ArbitrationPrevious MatchNext Match

        16. 119.NoticesPrevious MatchNext Match

    11. SCHEDULE 11Previous MatchNext Match

      DOCUMENTS AND PLANS TO BE CERTIFIEDPrevious MatchNext Match

    12. SCHEDULE 12Previous MatchNext Match

      PROCEDURE IN RELATION TO CERTAIN APPROVALS ETC.Previous MatchNext Match

      1. 1.InterpretationPrevious MatchNext Match

      2. 2.Applications made under requirementsPrevious MatchNext Match

      3. 3.Further information and consultationPrevious MatchNext Match

      4. 4.AppealsPrevious MatchNext Match

      5. 5.Application to protective provisionsPrevious MatchNext Match

    13. SCHEDULE 13Previous MatchNext Match

      MODIFICATIONS TO THE SECTION 36 CONSENT AND RRRF PLANNING PERMISSIONPrevious MatchNext Match

      1. PART 1 SECTION 36 CONSENTPrevious MatchNext Match

        1. 1.Delete the words “associated open storage areas for ash container...Previous MatchNext Match

        2. 2.Delete “and” at the end of paragraph 3(1)(i). Previous MatchNext Match

        3. 3.For the words “25 September 2014.” at the end of...Previous MatchNext Match

        4. 4.After paragraph 3(1)(ii) insert new paragraph 3(1)(iii) as follows, “...Previous MatchNext Match

      2. PART 2 RRRF PLANNING PERMISSIONPrevious MatchNext Match

        1. 5.After RRRF condition 1(iii), insert new condition 1(iv) as follows,...Previous MatchNext Match

        2. 6.In RRRF condition 7, insert the words “ (except for...Previous MatchNext Match

        3. 7.For RRRF condition 23, substitute new condition 23 as follows...Previous MatchNext Match

  8. Explanatory NotePrevious Match

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources