62. A 3.6 km length of new road to be constructed and classified as part of the A66 trunk road all-purpose dual carriageway (such length also including existing highway to be improved) commencing from a point 550 metres to the west of the Clint Lane Overbridge and following the existing A66 alignment for a distance of 3.6 km in a generally easterly direction to a point 363 metres east of the access to Hulands Quarry, identified by a red line on the classification of roads plan for scheme 07.
63. A 525 metre length of new slip road to be classified as part of the A66 trunk road, commencing from its diverge point on the new A66 eastbound carriageway, in a north-easterly direction to its junction with the improved A67, 35 metres north of the A66, identified by a red line on the classification of roads plan for scheme 07.
64. A 450 metre length of new slip road to be classified as part of the A66 trunk road, commencing from its junction with the improved A67, 88 metres north of the new A66, and continuing in a south-easterly direction to its merge point on the centre of the eastbound carriageway of the new A66 trunk road, identified by a red line on the classification of roads plan for scheme 07.
65. A 604 metre length of new slip road to be classified as part of the A66 trunk road, commencing from its diverge point on the new A66 westbound carriageway in a westerly direction to its junction with the unnamed unclassified side road (from the A67 into Bowes), 42 metres south-east of the junction with the A67, identified by a red line on the classification of roads plan for scheme 07.
66. A 368 metre length of new slip road to be classified as part of the A66 trunk road, commencing from the existing alignment of the A67, 72 metres south-east of its junction with the unnamed unclassified side road (from the A67 into Bowes), and continuing in a generally westerly direction to its merge point on the westbound carriageway of the new A66 trunk road, identified by a red line on the classification of roads plan for scheme 07.
67. A 339 metre length of existing road to be widened and classified as part of the A67, commencing 72 metres south-east of its junction with the unnamed unclassified side road (from the A67 into Bowes), and continuing in a generally north-easterly direction, identified by a green line on the classification of roads plan for scheme 07.
68. A 733 metre length of new unclassified road to be constructed, commencing 160 metres to the west of the existing junction of “The Street” with the A66 and continuing in an easterly direction for approximately 420 metres, then turning and continuing in a generally northerly direction and crossing the A66 via the East Bowes Accommodation Overbridge. The new unclassified road then curves eastwards and southwards before terminating at the new private means of access to Low Broats Farm and High Broats Farm, on the eastern side of the existing Low Broats Farm property, identified by a black line on the classification of roads plan for scheme 07.
69. A 115 metre length of new unclassified road to be constructed, comprising the new Clint Lane Overbridge (replacing the existing Clint Lane Overbridge), passing over the new A66 and linking Clint Lane with The Street, identified by a black line on the classification of roads plan for scheme 07.
70. A 126 metre length of existing unclassified road to be improved, commencing from its junction with the realigned A67 and continuing in a generally southerly direction towards The Street, identified by a black line on the classification of roads plan for scheme 07.
71. A length of approximately 45 metres of the existing A66 trunk road as shown on sheet 1 of the de-trunking plan for scheme 07 and being the existing junction of “The Street” with the westbound carriageway of the A66, to the east of Stone Bridge Farm.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: