Search Legislation

Commission Decision of 20 December 2007 concerning the technical specification of interoperability relating to ‘safety in railway tunnels’ in the trans-European conventional and high-speed rail system (notified under document number C(2007) 6450) (Text with EEA relevance) (2008/163/EC) (repealed)

 Help about what version

What Version

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

This version of this Decision was derived from EUR-Lex on IP completion day (31 December 2020 11:00 p.m.). It has not been amended by the UK since then. Find out more about legislation originating from the EU as published on legislation.gov.uk. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. Article 1.. . . . . . . . . ....

  3. Article 2.. . . . . . . . . ....

  4. Article 3.. . . . . . . . . ....

  5. Article 4.. . . . . . . . . ....

    1. ANNEX

      DIRECTIVE 2001/16/EC — INTEROPERABILITY OF THE TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM

      1. 1. INTRODUCTION

        1. 1.1. Technical scope

          1. 1.1.1. Tunnel safety as a part of general safety

          2. 1.1.2. Tunnel length

          3. 1.1.3. Fire safety categories of passenger rolling stock

          4. 1.1.3.1. Rolling stock for tunnels up to 5 km in length

          5. 1.1.3.2. Rolling stock for all tunnels

          6. 1.1.3.3 Rolling stock in tunnels with underground stations

          7. 1.1.4. Underground stations

          8. 1.1.5. Dangerous goods

          9. 1.1.6. Particular safety requirements in member states

          10. 1.1.7. Risk scope, risks that are not covered by this TSI...

        2. 1.2. Geographical scope

        3. 1.3. Content of this TSI

      2. 2. DEFINITION OF ASPECT/SCOPE

        1. 2.1. General

        2. 2.2. The risk scenarios

          1. 2.2.1. ‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic...

          2. 2.2.2. ‘Cold’ incidents: collision, derailment

          3. 2.2.3. Prolonged stop

          4. 2.2.4. Exclusions

        3. 2.3. The role of rescue services

      3. 3. ESSENTIAL REQUIREMENTS

        1. 3.1. Essential requirements as set out in Directive 2001/16/EC

        2. 3.2. Detailed essential requirements related to tunnel safety

      4. 4. CHARACTERISATION OF THE SUBSYSTEM

        1. 4.1. Introduction

        2. 4.2. Functional and technical specifications of the subsystems

          1. 4.2.1. Overview of the specifications

            1. Subsystem Infrastructure

            2. Subsystem Energy

            3. Subsystem control-command and signalling

            4. Subsystem rolling stock

            5. Operating Rules

            6. Maintenance Rules

            7. Professional Qualifications

            8. Health and Safety Conditions

          2. 4.2.2. Subsystem Infrastructure

          3. 4.2.2.1. Installation of switches and crossings

          4. 4.2.2.2. Prevent unauthorised access to emergency exits and equipment rooms

          5. 4.2.2.3. Fire protection requirements for structures

          6. 4.2.2.4. Fire safety requirements for building material

          7. 4.2.2.5. Fire detection

          8. 4.2.2.6. . . . . . . . . . ....

          9. 4.2.2.6.1. Definition of safe area

          10. 4.2.2.6.2. General

          11. 4.2.2.6.3. Lateral and/or vertical emergency exits to the surface.

          12. 4.2.2.6.4. Cross-passages to the other tube

          13. 4.2.2.6.5. Alternative technical solutions

          14. 4.2.2.7. Escape walkways

          15. 4.2.2.8. Emergency lighting on escape routes

          16. 4.2.2.9. Escape signage

          17. 4.2.2.10. Emergency communication

          18. 4.2.2.11. Access for rescue services

          19. 4.2.2.12. Rescue areas outside tunnels

          20. 4.2.2.13. Water supply

          21. 4.2.3. Subsystem Energy

          22. 4.2.3.1. Segmentation of overhead line or conductor rails

          23. 4.2.3.2. Overhead line or conductor rail earthing

          24. 4.2.3.3. Electricity supply

          25. 4.2.3.4. Requirements for electrical cables in tunnels

          26. 4.2.3.5. Reliability of electrical installations

          27. 4.2.4. Subsystem control-command and signalling

          28. 4.2.4.1. Hot axle box detectors

          29. 4.2.5. . . . . . . . . . ....

          30. 4.2.5.1. Material properties for rolling stock

          31. 4.2.5.2. Fire extinguishers for passenger rolling stock

          32. 4.2.5.3. . . . . . . . . . ....

          33. 4.2.5.3.1. Running capability

          34. 4.2.5.3.2. Driver's protection

          35. 4.2.5.3.3. Fire protection for trains with passengers and freight or road...

          36. 4.2.5.4. Fire barriers for passenger rolling stock

          37. 4.2.5.5. . . . . . . . . . ....

          38. 4.2.5.5.1. General objectives and required running capability for passenger trains

          39. 4.2.5.5.2. Requirements for brakes

          40. 4.2.5.5.3. Requirement for traction

          41. 4.2.5.6. On board fire detectors

          42. 4.2.5.7. Communication means on trains

          43. 4.2.5.8. Emergency brake override

          44. 4.2.5.9. Emergency lighting system in the train

          45. 4.2.5.10. Switching off of air conditioning in the train

          46. 4.2.5.11. . . . . . . . . . ....

          47. 4.2.5.11.1. Passengers’ emergency exits

          48. 4.2.5.11.2. Passenger access door

          49. 4.2.5.12. Rescue service's information and access

        3. 4.3. Functional and technical specifications of the interfaces

          1. 4.3.1. General

          2. 4.3.2. Interfaces with the Infrastructure subsystem

          3. 4.3.2.1. Escape walkways

          4. 4.3.2.2. Inspection of tunnel condition

          5. 4.3.3. Interfaces with the Energy subsystem

          6. 4.3.3.1. Sectioning of traction energy supply systems

          7. 4.3.4. Interfaces with the Control-Command-Signalling subsystem

          8. 4.3.5. Interfaces with the Traffic Management and Operation subsystem

          9. 4.3.5.1. Tunnel emergency plan and exercises

          10. 4.3.5.2. Route book

          11. 4.3.5.3. Provisions of on-train safety and emergency information to passengers

          12. 4.3.5.4. Tunnel specific competence of the train crew and other staff...

          13. 4.3.6. Interfaces with the rolling stock subsystem

          14. 4.3.6.1. Material properties for rolling stock

          15. 4.3.6.2. Other rolling stock specifications

          16. 4.3.7. Interfaces with the PRM subsystem

          17. 4.3.7.1. Escape walkways

        4. 4.4. Operating rules

          1. 4.4.1. Checking the condition of trains and appropriate actions

          2. 4.4.1.1. Before the train commences its service.

          3. 4.4.1.2. While the train is running

          4. 4.4.1.2.1. Safety-relevant equipment

          5. 4.4.1.2.2. Hot axle box incidents

          6. 4.4.2. Emergency rule

          7. 4.4.3. Tunnel emergency plan and exercises

          8. 4.4.3.1. Content

          9. 4.4.3.2. Identification

          10. 4.4.3.3. Exercises

          11. 4.4.4. Isolation and Earthing procedures

          12. 4.4.5. Route Book

          13. 4.4.6. Provision of on-train safety and emergency information to passengers

          14. 4.4.7. Co-ordination between tunnel control centres

        5. 4.5. Maintenance rules

          1. 4.5.1. Inspection of tunnel condition

          2. 4.5.2. . . . . . . . . . ....

          3. 4.5.2.1. Passenger rolling stock

          4. 4.5.2.2. Freight rolling stock

        6. 4.6. Professional qualifications

          1. 4.6.1. Tunnel specific competence of the train crew and other staff...

        7. 4.7. Health and safety conditions

          1. 4.7.1. Self-rescue device

        8. 4.8. Register of infrastructure and European register of authorised types of...

      5. 5. INTEROPERABILITY CONSTITUENTS

      6. 6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS...

        1. 6.1. Interoperability constituents

        2. 6.2. Subsystems

          1. 6.2.1. Conformity assessment (general)

          2. 6.2.2. Conformity assessment procedures (modules)

          3. 6.2.3. Existing solutions

          4. 6.2.4. Innovative solutions

          5. 6.2.5. Assessment of maintenance

          6. 6.2.6. Assessment of operational rules

          7. 6.2.7. . . . . . . . . . ....

          8. 6.2.7.1. Installation of switches and crossings

          9. 6.2.7.2. Prevent unauthorised access to emergency exits and equipment rooms

          10. 6.2.7.3. Fire protection requirements for structures

          11. 6.2.7.4. Facilities for self-rescue, rescue and evacuation in the event of...

          12. 6.2.7.5. Access and equipment for rescue services

          13. 6.2.7.6. Reliability of electrical installations

          14. 6.2.7.7. Hot axle box detectors

          15. 6.2.8. Additional requirements for assessment of specifications concerning the RU

          16. 6.2.8.1. Rescue service's information and access

          17. 6.2.8.2. Self-rescue device

      7. 7. IMPLEMENTATION

        1. 7.1. Application of this TSI to subsystems to be put into...

          1. 7.1.1. General

          2. 7.1.2. Newly built rolling stock constructed to an existing design

          3. 7.1.3. Existing rolling stock intended to run in new tunnels

        2. 7.2. Application of this TSI to subsystems already in service

          1. 7.2.1. Introduction

          2. 7.2.2. Upgrade and renewal measures for tunnels of more than 1 km,...

          3. 7.2.2.1. INS

          4. 7.2.2.2. ENE

          5. 7.2.3. Upgrade and renewal measures for the subsystems CCS, OPE, RST...

          6. 7.2.3.1. . . . . . . . . . ....

          7. 7.2.3.2. OPE:

          8. 7.2.3.3. RST (Passenger rolling stock)

          9. 7.2.4. Other existing tunnels

        3. 7.3. TSI revision

        4. 7.4. Exceptions for national, bilateral, multilateral or multinational agreements

          1. 7.4.1. Existing agreements

          2. 7.4.2. Future agreements or modification of existing agreements

        5. 7.5. Specific cases

          1. 7.5.1. Introduction

          2. 7.5.2. List of specific cases

      8. ANNEX A

        INFRASTRUCTURE REGISTER

      9. ANNEX B

        ROLLING STOCK REGISTER

        1. . . . . . . . . . ....

        2. . . . . . . . . . ....

      10. ANNEX C

        OPEN POINTS

        1. . . . . . . . . . ....

      11. ANNEX D

        THE RELATIONSHIP BETWEEN INCIDENT TYPES AND MEASURES

        1. . . . . . . . . . ....

        2. . . . . . . . . . ....

        3. . . . . . . . . . ....

        4. . . . . . . . . . ....

        5. . . . . . . . . . ....

        6. . . . . . . . . . ....

        7. . . . . . . . . . ....

        8. . . . . . . . . . ....

        9. . . . . . . . . . ....

        10. A Hot incident

        11. B Cold incident

        12. C Prolonged stop

      12. ANNEX E

        ASSESSMENT OF THE SUBSYSTEMS

        1. E.1 Scope

        2. E.2 Characteristics and modules

      13. ANNEX F

        MODULES FOR THE EC VERIFICATION OF SUBSYSTEMS

        1. F.1. List of the modules

        2. F.2. Modules for Interoperability Constituents

        3. F.3. Modules for the EC Verification of Subsystems

          1. F.3.1. Module SB: Type Examination

            1. 1. This module describes the EC verification procedure whereby a notified...

            2. 2. The contracting entity shall lodge an application for EC verification...

            3. 3. The applicant shall place at the disposal of the notified...

            4. 4. . . . . . . . . . ....

            5. 4.1. . . . . . . . . . ....

            6. 4.2. . . . . . . . . . ....

            7. 4.3. . . . . . . . . . ....

            8. 4.4. . . . . . . . . . ....

            9. 4.5. . . . . . . . . . ....

            10. 4.6. . . . . . . . . . ....

            11. 4.7. . . . . . . . . . ....

            12. 5. Where the type meets the provisions of the TSI, the...

            13. 6. . . . . . . . . . ....

            14. 7. . . . . . . . . . ....

            15. 8. . . . . . . . . . ....

            16. 9. . . . . . . . . . ....

          2. F.3.2. Module SD: Production Quality Management System

            1. 1. This module describes the EC verification procedure whereby a notified...

            2. 2. The notified body carries out the procedure, under the condition,...

            3. 3. For the subsystem that is subject of the EC verification...

            4. 4.1. The contracting entity shall lodge an application for EC verification...

            5. 4.3. The notified body shall fist examine the application concerning the...

            6. Quality management system

              1. 5.1. The contracting entity, if involved, and the main contractor, when...

              2. 5.2. For the contracting entity or the main contractor responsible for...

              3. 5.3. The notified body chosen by the contracting entity shall examine,...

              4. 5.4. The notified body referenced to in point 5.1. shall assess...

              5. 5.5. The contracting entity, if involved, and the main contractor shall...

              6. 6. . . . . . . . . . ....

              7. 6.1. . . . . . . . . . ....

              8. 6.2. The contracting entity, if involved, and the main contractor shall...

              9. 6.3. The notified body shall periodically carry out audits to make...

              10. 6.4. . . . . . . . . . ....

              11. 6.5. The notified body chosen by the contracting entity and responsible...

              12. 7. . . . . . . . . . ....

              13. 8. The contracting entity, if involved, and the main contractor shall,...

              14. 9. Where the subsystem meets the requirements of the TSI, the...

              15. 10. The notified body chosen by the contracting entity shall be...

              16. 11. Each notified body shall communicate to the other notified bodies...

              17. 12. The records accompanying the certificate of conformity shall be lodged...

          3. F.3.3. Module SF: Product Verification

            1. 1. This module describes the EC verification procedure whereby a notified...

            2. 2. The contracting entity shall lodge an application for EC verification...

            3. 3. Within that part of the procedure the contracting entity checks...

            4. 4. . . . . . . . . . ....

            5. 5. The application shall enable the design, manufacture, installation, maintenance and...

            6. 6. The notified body shall first examine the application concerning the...

            7. 7. . . . . . . . . . ....

            8. 7.1. . . . . . . . . . ....

            9. 7.2. . . . . . . . . . ....

            10. 8. The notified body shall agree with the contracting entity (and...

            11. 9. Where the subsystem meets the requirements of the TSI, the...

            12. 10. The notified body shall be responsible for compiling the technical...

            13. 11. The records accompanying the certificate of conformity shall be lodged...

          4. F.3.4. Module SG: Unit verification

            1. 1. This module describes the EC verification procedure whereby a notified...

            2. 2. The contracting entity shall lodge an application for EC verification...

            3. 3. The technical documentation shall enable the design, manufacture, installation and...

            4. 4. The notified body shall examine the application and the technical...

            5. 5. . . . . . . . . . ....

            6. 6. . . . . . . . . . ....

            7. 7. Where the subsystem meets the requirements of the TSI, the...

            8. 8. The notified body shall be responsible for compiling the technical...

            9. 9. The records accompanying the certificate of conformity shall be lodged...

          5. F.3.5. Module SH2: Full Quality Management System with Design Examination

            1. 1. This module describes the EC verification procedure whereby a notified...

            2. 2. The notified body shall carry out the procedure, including a...

            3. 3. For the subsystem that is subject of the EC verification...

            4. 4. . . . . . . . . . ....

            5. 4.1. . . . . . . . . . ....

            6. 4.2. The application shall enable the design, manufacture, assembly, installation, maintenance...

            7. 4.3. . . . . . . . . . ....

            8. 4.4. The notified body shall examine the application concerning the design...

            9. 4.5. . . . . . . . . . ....

            10. 5. . . . . . . . . . ....

            11. 5.1. The contracting entity, if involved, and the main contractor, when...

            12. 5.2. For the contracting entity or the main contractor responsible for...

            13. 5.3. The notified body chosen by the contracting entity shall examine,...

            14. 5.4. The notified body referenced in point 5.1. shall assess the...

            15. 5.5. The contracting entity, if involved, and the main contractor shall...

            16. 6. . . . . . . . . . ....

            17. 6.1. . . . . . . . . . ....

            18. 6.2. The contracting entity, if involved, and the main contractor shall...

            19. 6.3. The notified body shall periodically carry out audits to make...

            20. 6.4. . . . . . . . . . ....

            21. 6.5. The notified body chosen by the contracting entity and responsible...

            22. 7. . . . . . . . . . ....

            23. 8. The contracting entity, if involved, and the main contractor shall,...

            24. 9. Where the subsystem meets the requirements of the TSI, the...

            25. 10. The notified body chosen by the contracting entity shall be...

            26. 11. Each notified body shall communicate to the other notified bodies...

            27. 12. The records accompanying the certificate of conformity shall be lodged...

        4. F.4. Assessment of Maintenance Arrangements: Conformity Assessment Procedure

      14. ANNEX G

        GLOSSARY

Back to top

Options/Help

Print Options

You have chosen to open the Whole Decision

The Whole Decision you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources