- Latest available (Revised)
- Point in Time (31/01/2020)
- Original (As adopted by EU)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
Point in time view as at 31/01/2020.
There are outstanding changes not yet made to Commission Decision of 14 January 2011 on the procedure for attesting the conformity of construction products pursuant to Article 20(2) of Council Directive 89/106/EEC as regards sealants for non-structural use in joints in buildings and pedestrian walkways (notified under document C(2011) 62) (Text with EEA relevance) (2011/19/EU). Any changes that have already been made to the legislation appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Council Directive 89/106/EEC of 21 December 1988 on the approximation of laws, regulations and administrative provisions of the Member States relating to construction products(1), and in particular Article 13(4) thereof,
After consulting the Standing Committee on Construction,
Whereas:
(1) The Commission is required to select, in accordance with Article 13(3) of Directive 89/106/EEC, one of two procedures for attesting the conformity of a product. That Article prescribes that the Commission should choose the least onerous possible procedure consistent with safety. It is therefore necessary to decide whether, for a given product or family of products, the existence of a factory production control system under the responsibility of the manufacturer is a necessary and sufficient condition for an attestation of conformity, or whether, for reasons related to compliance with the criteria set out in Article 13(4) of that Directive, the intervention of an approved body is required.
(2) Article 13(4) requires that the procedure thus determined shall be indicated in the mandates and in the technical specifications. It is therefore desirable to identify the products or family of products referred to in the technical specifications.
(3) The two procedures provided for in Article 13(3) of Directive 89/106/EEC are described in detail in Annex III to that Directive. It is therefore necessary to specify clearly the methods by which the two procedures shall be implemented, by reference to Annex III, for each product or family of products, since Annex III gives preference to certain systems.
(4) The procedure referred to in Article 13(3)(a) corresponds to the systems set out in the first possibility, without continuous surveillance, and the second and third possibilities of point (ii) of Section 2 of Annex III. The procedure referred to in Article 13(3)(b) corresponds to the systems set out in point (i) of Section 2 of Annex III, and in the first possibility, with continuous surveillance, of point (ii) of Section 2 of Annex III,
HAS ADOPTED THIS DECISION:
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: