Search Legislation

European Parliament and Council Directive 94/63/ECShow full title

European Parliament and Council Directive 94/63/EC of 20 December 1994 on the control of volatile organic compound (VOC) emissions resulting from the storage of petrol and its distribution from terminals to service stations

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As adopted by EU)
 Help about advanced features

Advanced Features

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Status:

EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.

ANNEX IVU.K.SPECIFICATIONS FOR BOTTOM-LOADING, VAPOUR COLLECTION AND OVERFILL PROTECTION OF EUROPEAN ROAD TANKERS

1.CouplingsU.K.

1.1.The liquid coupler on the loading arm must be a female coupler which must mate with a 4-inch API (101,6 mm) male adapter located on the vehicle as defined by:U.K.

  • API Recommended Practice 1004

    Seventh Edition, November 1988.

Bottom loading and vapour recovery for MC-306 tank motor vehicles (Section 2.1.1.1 — Type of adapter used for bottom loading)

1.2.The vapour-collection coupler on the loading-gantry vapour-collection hose must be a cam-and-groove female coupler which must mate with a 4-inch (101,6 mm) cam-and-groove male adapter located on the vehicle as defined by:U.K.

  • API Recommended Practice 1004

    Seventh Edition November 1988.

Bottom loading and vapour recovery for MC-306 tank motor vehicles (Section 4.1.1.2 — Vapour-recovery adapter)

2.Loading conditionsU.K.

2.1.The normal liquid-loading rate must be 2 300 litres per minute (maximum 2 500 litres per minute) per loading arm.U.K.

2.2.When the terminal is operating at peak demand, its loading gantry vapour collection system, including the vapour-recovery unit, is allowed to generate a maximum counterpressure of 55 millibar on the vehicle side of the vapour-collection adapter.U.K.

2.3.All approved bottom-loading vehicles will carry an identification plate which specified the maximum permitted number of loading arms which may be operated simultaneously whilst ensuring that no vapours are released via the compartment P and V valves, when the maximum plant back pressure is 55 millibar as specified in 2.2.U.K.

3.Connection of vehicle earth/overfill detectionU.K.

The loading gantry must be equipped with an overfill-detection control unit which, when connected to the vehicle, must provide a fail-safe permission signal to enable loading, providing no compartment-overfill sensors detect a high level.

3.1.The vehicle must be connected to the control unit on the gantry via a 10-pin industry-standard electrical connector. The male connector must be mounted on the vehicle and the female connector must be attached to a flying lead connected to the gantry-mounted control unit.U.K.

3.2.The high-level detectors on the vehicle must be either 2-wire thermistor sensors, 2-wire optical sensors, 5-wire optical sensors or a compatible equivalent, provided the system is fail-safe. (NB: thermistors must have a negative temperature coefficient.)U.K.

3.3.The gantry control unit must be suitable for both 2-wire and 5-wire vehicle systems.U.K.

3.4.The vehicle must be bonded to the gantry via the common return wire of the overfill sensors, which must be connected to pin 10 on the male connector via the vehicle chassis. Pin 10 on the female connector must be connected to the control-unit enclosure which must be connected to the gantry earth.U.K.

3.5.All approved bottom-loading vehicles must carry an identification plate (see 2.3) which specifies the type of overfill-detection sensors installed (i. e. 2-wire or 5-wire).U.K.

4.Location of the connectionsU.K.

4.1.The design of the liquid-loading and vapour collection facilities on the loading gantry must be based on the following vehicle-connection envelope.U.K.

4.1.1.The height of the centre line of the liquid adapters must be: maximum 1,4 metres (unladen); minimum 0,5 metre (laden), the preferred height being 0,7 to 1,0 metres).U.K.
4.1.2.The horizontal spacing of the adapters must be not less than 0,25 metres (preferred minimum spacing is 0,3 metres).U.K.
4.1.3.All liquid adapters must be located within an envelope not exceeding 2,5 metres in length.U.K.
4.1.4.The vapour-collection adapter should be located preferably to the right of the liquid adapters and at a height not exceeding 1,5 metres (unladen) and not less than 0,5 metres (laden).U.K.

4.2.The earth/overfill connector must be located to the right of the liquid and vapour-collection adapters and at a height not exceeding 1,5 metres (unladen) and not less than 0,5 metre (laden).U.K.

4.3.The above connections must be located on one side of the vehicle only.U.K.

5.Safety interlocksU.K.

5.1.Earth/Overfill detectionU.K.

Loading must not be permitted unless a permissive signal is provided by the combined earth/overfill control unit.

In the event of an overfill condition or a loss of vehicle earth, the control unit on the gantry must close the gantry-loading control valve.

5.2.Vapour-collection detectionU.K.

Loading must not be permitted unless the vapour-collection hose has been connected to the vehicle and there is a free passage for the displaced vapours to flow from the vehicle into the plant vapour-collection system.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources