Council Directive 96/61/EC (repealed)Show full title

Council Directive 96/61/EC of 24 September 1996 concerning integrated pollution prevention and control (repealed)

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes over time for: Council Directive 96/61/EC (repealed) (without Annexes)

 Help about opening options

Version Superseded: 18/02/2008

Status:

EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.

Article 1U.K.Purpose and scope

The purpose of this Directive is to achieve integrated prevention and control of pollution arising from the activities listed in Annex I. It lays down measures designed to prevent or, where that is not practicable, to reduce emissions in the air, water and land from the abovementioned activities, including measures concerning waste, in order to achieve a high level of protection of the environment taken as a whole, without prejudice to Directive 85/337/EEC and other relevant Community provisions.

Article 2U.K.Definitions

For the purposes of this Directive:

1.

‘substance’ shall mean any chemical element and its compounds, with the exception of radioactive substances within the meaning of Directive 80/836/Euratom(1) and genetically modified organisms within the meaning of Directive 90/219/EEC(2) and Directive 90/220/EEC(3);

2.

‘pollution’ shall mean the direct or indirect introduction as a result of human activity, of substances, vibrations, heat or noise into the air, water or land which may be harmful to human health or the quality of the environment, result in damage to material property, or impair or interfere with amenities and other legitimate uses of the environment;

3.

‘installation’ shall mean a stationary technical unit where one or more activities listed in Annex I are carried out, and any other directly associated activities which have a technical connection with the activities carried out on that site and which could have an effect on emissions and pollution;

4.

‘eixsting installation’ shall mean an installation in operation or, in accordance with legislation existing before the date on which this Directive is brought into effect, an installation authorized or in the view of the competent authority the subject of a full request for authorization, provided that that installation is put into operation no later than one year after the date on which this Directive is brought into effect;

5.

‘emission’ shall mean the direct or indirect release of substances, vibrations, heat or noise from individual or diffuse sources in the installation into the air, water or land;

6.

‘emission limit values’ shall mean the mass, expressed in terms of certain specific parameters, concentration and/or level of an emission, which may not be exceeded during one or more periods of time. Emission limit values may also be laid down for certain groups, families or categories of substances, in particular for those listed in Annex III.

The emission limit values for substances shall normally apply at the point where the emissions leave the installation, any dilution being disregarded when determining them. With regard to indirect releases into water, the effect of a water treatment plant may be taken into account when determining the emission limit values of the installation involved, provided that an equivalent level is guaranteed for the protection of the environment as a whole and provided this does not lead to higher levels of pollution in the environment, without prejudice to Directive 76/464/EEC or the Directives implementing it;

7.

‘environmental quality standard’ shall mean the set of requirements which must be fulfilled at a given time by a given environment or particular part thereof, as set out in Community legislation;

8.

‘competent authority’ shall mean the authority or authorities or bodies responsible under the legal provisions of the Member States for carrying out the obligations arising from this Directive;

9.

‘permit’ shall mean that part or the whole of a written decision (or several such decisions) granting authorization to operate all or part of an installation, subject to certain conditions which guarantee that the installation complies with the requirements of this Directive. A permit may cover one or more installations or parts of installations on the same site operated by the same operator;

10.
(a)

‘change in operation’ shall mean a change in the nature or functioning, or an extension, of the installation which may have consequences for the environment;

(b)

‘substantial change’ shall mean a change in operation which, in the opinion of the competent authority, may have significant negative effects on human beings or the environment[F1.]

[F2For the purposes of this definition, any change to or extension of an operation shall be deemed to be substantial if the change or extension in itself meets the thresholds, if any, set out in Annex I;]

11.

‘best available techniques’ shall mean the most effective and advanced stage in the development of activities and their methods of operation which indicate the practical suitability of particular techniques for providing in principle the basis for emission limit values designed to prevent and, where that is not practicable, generally to reduce emissions and the impact on the environment as a whole:

  • ‘techniques’ shall include both the technology used and the way in which the installation is designed, built, maintained, operated and decommissioned,

  • ‘available’ techniques shall mean those developed on a scale which allows implementation in the relevant industrial sector, under economically and technically viable conditions, taking into consideration the costs and advantages, whether or not the techniques are used or produced inside the Member State in question, as long as they are reasonably accessible to the operator,

  • ‘best’ shall mean most effective in achieving a high general level of protection of the environment as a whole.

In determining the best available techniques, special consideration should be given to the items listed in Annex IV;

12.

‘operator’ shall mean any natural or legal person who operates or controls the installation or, where this is provided for in national legislation, to whom decisive economic power over the technical functioning of the installation has been delegated[F1;]

13.

[F2 the public shall mean one or more natural or legal persons and, in accordance with national legislation or practice, their associations, organisations or groups;

14.

the public concerned shall mean the public affected or likely to be affected by, or having an interest in, the taking of a decision on the issuing or the updating of a permit or of permit conditions; for the purposes of this definition, non-governmental organisations promoting environmental protection and meeting any requirements under national law shall be deemed to have an interest.]

Article 3U.K.General principles governing the basic obligations of the operator

Member States shall take the necessary measures to provide that the competent authorities ensure that installations are operated in such a way that:

(a)

all the appropriate preventive measures are taken against pollution, in particular through application of the best available techniques;

(b)

no significant pollution is caused;

(c)

waste production is avoided in accordance with Council Directive 75/442/EEC of 15 July 1975 on waste(4); where waste is produced, it is recovered or, where that is technically and economically impossible, it is disposed of while avoiding or reducing any impact on the environment;

(d)

energy is used efficiently;

(e)

the necessary measures are taken to prevent accidents and limit their consequences;

(f)

the necessary measures are taken upon definitive cessation of activities to avoid any pollution risk and return the site of operation to a satisfactory state.

For the purposes of compliance with this Article, it shall be sufficient if Member States ensure that the competent authorities take account of the general principles set out in this Article when they determine the conditions of the permit.

Article 4U.K.Permits for new installations

Member States shall take the necessary measures to ensure that no new installation is operated without a permit issued in accordance with this Directive, without prejudice to the exceptions provided for in Council Directive 88/609/EEC of 24 November 1988 on the limitation of emissions of certain pollutants into the air from large combustion plants(5).

Article 5U.K.Requirements for the granting of permits for existing installations

1.Member States shall take the necessary measures to ensure that the competent authorities see to it, by means of permits in accordance with Articles 6 and 8 or, as appropriate, by reconsidering and, where necessary, by updating the conditions, that existing installations operate in accordance with the requirements of Articles 3, 7, 9, 10, 13, the first and second indents of 14, and 15 (2) not later than eight years after the date on which this Directive is brought into effect, without prejudice to specific Community legislation.

2.Member States shall take the necessary measures to apply the provisions of Articles 1, 2, 11, 12, 14, third indent, 15 (1), (3) and (4), 16, 17 and 18 (2) to existing installations as from the date on which this Directive is brought into effect.

Article 6U.K.Applications for permits

1.Member States shall take the necessary measures to ensure that an application to the competent authority for a permit includes a description of:

  • the installation and its activities,

  • the raw and auxiliary materials, other substances and the energy used in or generated by the installation,

  • the sources of emissions from the installation,

  • the conditions of the site of the installation,

  • the nature and quantities of foreseeable emissions from the installation into each medium as well as identification of significant effects of the emissions on the environment,

  • the proposed technology and other techniques for preventing or, where this not possible, reducing emissions from the installation,

  • where necessary, measures for the prevention and recovery of waste generated by the installation,

  • further measures planned to comply with the general principles of the basic obligations of the operator as provided for in Article 3,

  • measures planned to monitor emissions into the environment[F1,]

  • [F2the main alternatives, if any, studied by the applicant in outline.]

An application for a permit shall also include a non-technical summary of the details referred to in the above indents.

2.Where information supplied in accordance with the requirements provided for in Directive 85/337/EEC or a safety report prepared in accordance with Council Directive 82/501/EEC of 24 June 1982 on the major-accident hazards of certain industrial activities(6) or other information produced in response to other legislation fulfils any of the requirements of this Article, that information may be included in, or attached to, the application.

Article 7U.K.Integrated approach to issuing permits

Member States shall take the measures necessary to ensure that the conditions of, and procedure for the grant of, the permit are fully coordinated where more than one competent authority is involved, in order to guarantee an effective integrated approach by all authorities competent for this procedure.

Article 8U.K.Decisions

Without prejudice to other requirements laid down in national or Community legislation, the competent authority shall grant a permit containing conditions guaranteeing that the installation complies with the requirements of this Directive or, if it does not, shall refuse to grant the permit.

All permits granted and modified permits must include details of the arrangements made for air, water and land protection as referred to in this Directive.

Article 9U.K.Conditions of the permit

1.Member States shall ensure that the permit includes all measures necessary for compliance with the requirements of Articles 3 and 10 for the granting of permits in order to achieve a high level of protection for the environment as a whole by means of protection of the air, water and land.

2.In the case of a new installation or a substantial change where Article 4 of Directive 85/337/EEC applies, any relevant information obtained or conclusion arrived at pursuant to Articles 5, 6 and 7 of that Directive shall be taken into consideration for the purposes of granting the permit.

3.The permit shall include emission limit values for pollutants, in particular, those listed in in Annex III, likely to be emitted from the installation concerned in significant quantities, having regard to their nature and their potential to transfer pollution from one medium to another (water, air and land). If necessary, the permit shall include appropriate requirements ensuring protection of the soil and ground water and measures concerning the management of waste generated by the installation. Where appropriate, limit values may be supplemented or replaced by equivalent parameters or technical measures.

For installations under subheading 6.6 in Annex I, emission limit values laid down in accordance with this paragraph shall take into account practical considerations appropriate to these categories of installation.

[F3Where emissions of a greenhouse gas from an installation are specified in Annex I to Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC (7) in relation to an activity carried out in that installation, the permit shall not include an emission limit value for direct emissions of that gas unless it is necessary to ensure that no significant local pollution is caused.

For activities listed in Annex I to Directive 2003/87/EC, Member States may choose not to impose requirements relating to energy efficiency in respect of combustion units or other units emitting carbon dioxide on the site.

Where necessary, the competent authorities shall amend the permit as appropriate.

The three preceding subparagraphs shall not apply to installations temporarily excluded from the scheme for greenhouse gas emission allowance trading within the Community in accordance with Article 27 of Directive 2003/87/EC.]

4.Without prejudice to Article 10, the emission limit values and the equivalent parameters and technical measures referred to in paragraph 3 shall be based on the best available techniques, without prescribing the use of any technique or specific technology, but taking into account the technical characteristics of the installation concerned, its geographical location and the local environmental conditions. In all circumstances, the conditions of the permit shall contain provisions on the minimization of long-distance or transboundary pollution and ensure a high level of protection for the environment as a whole.

5.The permit shall contain suitable release monitoring requirements, specifying measurement methodology and frequency, evaluation procedure and an obligation to supply the competent authority with data required for checking compliance with the permit.

For installations under subheading 6.6 in Annex I, the measures referred to in this paragraph may take account of costs and benefits.

6.The permit shall contain measures relating to conditions other than normal operating conditions. Thus, where there is a risk that the environment may be affected, appropriate provision shall be made for start-up, leaks malfunctions, momentary stoppages and definitive cessation of operations.

The permit may also contain temporary derogations from the requirements of paragraph 4 if a rehabilitation plan approved by the competent authority ensures that these requirements will be met within six months and if the project leads to a reduction of pollution.

7.The permit may contain such other specific conditions for the purposes of this Directive as the Member State or competent authority may think fit.

8.Without prejudice to the obligation to implement a permit procedure pursuant to this Directive, Member States may prescribe certain requirements for certain categories of installations in general binding rules instead of including them in individual permit conditions, provided that an integrated approach and an equivalent high level of environmental protection as a whole are ensured.

Article 10U.K.Best available techniques and environmental quality standards

Where an environmental quality standard requires stricter conditions than those achievable by the use of the best available techniques, additional measures shall in particular be required in the permit, without prejudice to other measures which might be taken to comply with environmental quality standards.

Article 11U.K.Developments in best available techniques

Member States shall ensure that the competent authority follows or is informed of developments in best available techniques.

Article 12U.K.Changes by operators to installations

1.Member States shall take the necessary measures to ensure that the operator informs the competent authorities of any changes planned in the operation of the installation as referred to in Article 2 (10) (a). Where appropriate, the competent authorities shall update the permit or the conditions.

2.Member States shall take the necessary measures to ensure that no substantial change in the operation of the installation within the meaning of Article 2 (10) (b) planned by the operator is made without a permit issued in accordance with this Directive. The application for a permit and the decision by the competent authority must cover those parts of the installation and those aspects listed in Article 6 that may be affected by the change. The relevant provisions of Articles 3 and 6 to 10 and Article 15 (1), (2) and (4) shall apply mutatis mutandis.

Article 13U.K.Reconsideration and updating of permit conditions by the competent authority

1.Member States shall take the necessary measures to ensure that competent authorities periodically reconsider and, where necessary, update permit conditions.

2.The reconsideration shall be undertaken in any event where:

  • the pollution caused by the installation is of such significance that the existing emission limit values of the permit need to be revised or new such values need to be included in the permit,

  • substantial changes in the best available techniques make it possible to reduce emissions significantly without imposing excessive costs,

  • the operational safety of the process or activity requires other techniques to be used,

  • new provisions of Community or national legislation so dictate.

Article 14U.K.Compliance with permit conditions

Member States shall take the necessary measures to ensure that:

  • the conditions of the permit are complied with by the operator when operating the installation,

  • the operator regularly informs the competent authority of the results of the monitoring of releases and without delay of any incident or accident significantly affecting the environment,

  • operators of installations afford the representatives of the competent authority all necessary assistance to enable them to carry out any inspections within the installation, to take samples and to gather any information necessary for the performance of their duties for the purposes of this Directive.

Article 15U.K.Access to information and public participation in the permit procedure

[F11. Member States shall ensure that the public concerned are given early and effective opportunities to participate in the procedure for:

  • issuing a permit for new installations,

  • issuing a permit for any substantial change in the operation of an installation,

  • updating of a permit or permit conditions for an installation in accordance with Article 13, paragraph 2, first indent.

The procedure set out in Annex V shall apply for the purposes of such participation.]

2.The results of monitoring of releases as required under the permit conditions referred to in Article 9 and held by the competent authority must be made available to the public.

F43.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.Paragraphs 1, 2 and 3 shall apply subject to the restrictions laid down in Article 3 (2) and (3) of Directive 90/313/EEC.

[F25. When a decision has been taken, the competent authority shall inform the public in accordance with the appropriate procedures and shall make available to the public the following information:

(a) the content of the decision, including a copy of the permit and of any conditions and any subsequent updates; and

(b) having examined the concerns and opinions expressed by the public concerned, the reasons and considerations on which the decision is based, including information on the public participation process.]

[F2Article 15a U.K. Access to justice

Member States shall ensure that, in accordance with the relevant national legal system, members of the public concerned:

(a)

having a sufficient interest, or alternatively,

(b)

maintaining the impairment of a right, where administrative procedural law of a Member State requires this as a precondition;

have access to a review procedure before a court of law or another independent and impartial body established by law to challenge the substantive or procedural legality of decisions, acts or omissions subject to the public participation provisions of this Directive.

Member States shall determine at what stage the decisions, acts or omissions may be challenged.

What constitutes a sufficient interest and impairment of a right shall be determined by the Member States, consistently with the objective of giving the public concerned wide access to justice. To this end, the interest of any non-governmental organisation meeting the requirements referred to in Article 2(14) shall be deemed sufficient for the purpose of subparagraph (a) of this Article. Such organisations shall also be deemed to have rights capable of being impaired for the purpose of subparagraph (b) of this Article.

The provisions of this Article shall not exclude the possibility of a preliminary review procedure before an administrative authority and shall not affect the requirement of exhaustion of administrative review procedures prior to recourse to judicial review procedures, where such a requirement exists under national law.

Any such procedure shall be fair, equitable, timely and not prohibitively expensive.

In order to further the effectiveness of the provisions of this Article, Member States shall ensure that practical information is made available to the public on access to administrative and judicial review procedures.]

Article 16U.K.Exchange of information

1.With a view to exchanging information, Member States shall take the necessary measures to send the Commission every three years, and for the first time within 18 months of the date on which this Directive is brought into effect, the available representative data on the limit values laid down by specific category of activities in accordance with Annex I and, if appropriate, the best available techniques from which those values are derived in accordance with, in particular, Article 9. On subsequent occasions the data shall be supplemented in accordance with the procedures laid down in paragraph 3 of this Article.

2.The Commission shall organize an exchange of information between Member States and the industries concerned on best available techniques, associated monitoring, and developments in them. Every three years the Commission shall publish the results of the exchanges of information.

3.Reports on the implementation of this Directive and its effectiveness compared with other Community environmental instruments shall be established in accordance with the procedure laid down in Articles 5 and 6 of Directive 91/692/EEC. The first report shall cover the three years following the date on which this present Directive is brought into effect as referred to in Article 21. The Commission shall submit the report to the Council, accompanied by proposals if necessary.

4.Member States shall establish or designate the authority or authorities which are to be responsible for the exchange of information under paragraphs 1, 2 and 3 and shall inform the Commission accordingly.

Article 17U.K.Transboundary effects

[F11. Where a Member State is aware that the operation of an installation is likely to have significant negative effects on the environment of another Member State, or where a Member State likely to be significantly affected so requests, the Member State in whose territory the application for a permit pursuant to Article 4 or Article 12(2) was submitted shall forward to the other Member State any information required to be given or made available pursuant to Annex V at the same time as it makes it available to its own nationals. Such information shall serve as a basis for any consultations necessary in the framework of the bilateral relations between the two Member States on a reciprocal and equivalent basis.]

2.Within the framework of their bilateral relations, Member States shall see to it that in the cases referred to in paragraph 1 the applications are also made available for an appropriate period of time to the public of the Member State likely to be affected so that it will have the right to comment on them before the competent authority reaches its decision.

[F23. The results of any consultations pursuant to paragraphs 1 and 2 must be taken into consideration when the competent authority reaches a decision on the application.

4. The competent authority shall inform any Member State, which has been consulted pursuant to paragraph 1, of the decision reached on the application and shall forward to it the information referred to in Article 15(5). That Member State shall take the measures necessary to ensure that that information is made available in an appropriate manner to the public concerned in its own territory.]

Article 18U.K.Community emission limit values

1.Acting on a proposal from the Commission, the Council will set emission limit values, in accordance with the procedures laid down in the Treaty, for:

  • the categories of installations listed in Annex I except for the landfills covered by categories 5.1 and 5.4 of that Annex,

    and

  • the polluting substances referred to in Annex III,

for which the need for Community action has been identified, on the basis, in particular, of the exchange of information provided for in Article 16.

2.In the absence of Community emission limit values defined pursuant to this Directive, the relevant emission limit values contained in the Directives referred to in Annex II and in other Community legislation shall be applied as minimum emission limit values pursuant to this Directive for the installations listed in Annex I.

Without prejudice to the requirements of this Directive, the technical requirements applicable for the landfills covered by categories 5.1 and 5.4 of Annex I, shall be fixed by the Council, acting on a proposal by the Commission, in accordance with the procedures laid down in the Treaty.

[F5Article 19 U.K. Committee procedure

1. The Commission shall be assisted by a committee.

2. Where reference is made to this Article, Articles 5 and 7 of Decision 1999/468/EC (8) shall apply, having regard to the provisions of Article 8 thereof.

The period laid down in Article 5(6) of Decision 1999/468/EC shall be set at three months.

3. The Committee shall adopt its rules of procedure.]

Article 20U.K.Transitional provisions

1.The provisions of Directive 84/360/EEC, the provisions of Articles 3, 5, 6 (3) and 7 (2) of Directive 76/464/EEC and the relevant provisions concerning authorization systems in the Directives listed in Annex II shall apply, without prejudice to the exceptions provided for in Directive 88/609/EEC, to existing installations in respect of activities listed in Annex I until the measures required pursuant to Article 5 of this Directive have been taken by the competent authorities.

2.The relevant provisions concerning authorization systems in the Directives referred to in paragraph 1 shall not apply to installations which are new in respect of the activities listed in Annex I on the date on which this Directive is brought into effect.

3.Directive 84/360/EEC shall be repealed 11 years after the date of entry into force of this Directive.

As soon as the measures provided for in Article 4, 5 or 12 have been taken in respect of an installation, the exception provided for in Article 6 (3) of Directive 76/464/EEC shall no longer apply to installations covered by this Directive.

Acting on a proposal from the Commission, the Council shall, where necessary, amend the relevant provisions of the Directives referred to in Annex II in order to adapt them to the requirements of this Directive before the date of repeal of Directive 84/360/EEC, referred to in the first subparagraph.

Article 21U.K.Bringing into effect

1.Member States shall adopt the laws, regulations and administrative provisions necessary to comply with this Directive no later than three years after its entry into force. They shall forthwith inform the Commission thereof.

When Member States adopt these measures, they shall contain a reference to this Directive or shall be accompanied by such reference on the occasion of their official publication. The methods of making such reference shall be laid down by Member States.

2.Member States shall communicate to the Commission the texts of the main provisions of national law which they adopt in the field covered by this Directive.

Article 22U.K.

This Directive shall enter into force on the 20th day following its publication.

Article 23U.K.

This Directive is addressed to the Member States.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources