Regulation (EC) No 1228/2003 of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity (Text with EEA relevance) (repealed)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
Version Superseded: 01/07/2004
Point in time view as at 15/07/2003.
There are currently no known outstanding effects for the Regulation (EC) No 1228/2003 of the European Parliament and of the Council (repealed).
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
This Regulation aims at setting fair rules for cross-border exchanges in electricity, thus enhancing competition within the internal electricity market, taking into account the specificities of national and regional markets. This will involve the establishment of a compensation mechanism for cross border flows of electricity and the setting of harmonised principles on cross-border transmission charges and the allocation of available capacities of interconnections between national transmission systems.
1.For the purpose of this Regulation, the definitions contained in Article 2 of Directive 2003/54/EC of the European Parliament and of the Council of 26 June 2003 concerning common rules for the internal market in electricity and repealing Directive 96/92/EC(1) shall apply with the exception of the definition of ‘interconnector’ which shall be replaced by the following:
means a transmission line which crosses or spans a border between Member States and which connects the national transmission systems of the Member States;.
2.The following definitions shall also apply:
means the regulatory authorities referred to in Article 23(1) of Directive 2003/54/EC;
means a physical flow of electricity on a transmission network of a Member State that results from the impact of the activity of producers and/or consumers outside of that Member State on its transmission network. If transmission networks of two or more Member States form part, entirely or partly, of a single control block, for the purpose of the inter-transmission system operator (TSO) compensation mechanism referred to in Article 3 only, the control block as a whole shall be considered as forming part of the transmission network of one of the Member States concerned, in order to avoid flows within control blocks being considered as cross-border flows and giving rise to compensation payments under Article 3. The regulatory authorities of the Member States concerned may decide which of the Member States concerned shall be the one of which the control block as a whole shall be considered to form part of;
means a situation in which an interconnection linking national transmission networks, cannot accommodate all physical flows resulting from international trade requested by market participants, because of a lack of capacity of the interconnectors and/or the national transmission systems concerned;
of electricity means the dispatch of electricity in one Member State on the basis of an underlying contractual arrangement to the effect that the simultaneous corresponding take-up (‘declared import’) of electricity will take place in another Member State or a third country;
of electricity means a circumstance where a ‘declared export’ of electricity occurs and where the nominated path for the transaction involves a country in which neither the dispatch nor the simultaneous corresponding take-up of the electricity will take place;
of electricity means the take-up of electricity in a Member State or a third country simultaneously with the dispatch of electricity (‘declared export’) in another Member State;
means an interconnector not completed by the date of entry into force of this Regulation.
1.Transmission system operators shall receive compensation for costs incurred as a result of hosting cross-border flows of electricity on their networks.
2.The compensation referred to in paragraph 1 shall be paid by the operators of national transmission systems from which cross-border flows originate and the systems where those flows end.
3.Compensation payments shall be made on a regular basis with regard to a given period of time in the past. Ex-post adjustments of compensation paid shall be made where necessary to reflect costs actually incurred.
The first period of time for which compensation payments shall be made shall be determined in the guidelines referred to in Article 8.
4.Acting in accordance with the procedure referred to in Article 13(2), the Commission shall decide on the amounts of compensation payments payable.
5.The magnitude of cross-border flows hosted and the magnitude of cross-border flows designated as originating and/or ending in national transmission systems shall be determined on the basis of the physical flows of electricity actually measured in a given period of time.
6.The costs incurred as a result of hosting cross-border flows shall be established on the basis of the forward looking long-run average incremental costs, taking into account losses, investment in new infrastructure, and an appropriate proportion of the cost of existing infrastructure, as far as infrastructure is used for the transmission of cross-border flows, in particular taking into account the need to guarantee security of supply. When establishing the costs incurred, recognised standard-costing methodologies shall be used. Benefits that a network incurs as a result of hosting cross-border flows shall be taken into account to reduce the compensation received.
1.Charges applied by network-operators for access to networks shall be transparent, take into account the need for network security and reflect actual costs incurred insofar as they correspond to those of an efficient and structurally comparable network operator and applied in a non discriminatory manner. Those charges shall not be distance-related.
2.Producers and consumers (‘load’) may be charged for access to networks. The proportion of the total amount of the network charges borne by producers shall, subject to the need to provide appropriate and efficient locational signals, be lower than the proportion borne by consumers. Where appropriate, the level of the tariffs applied to producers and/or consumers shall provide locational signals at European level, and take into account the amount of network losses and congestion caused, and investment costs for infrastructure. This shall not prevent Member States from providing locational signals within their territory or from applying mechanisms to ensure that network access charges borne by consumers (‘load’) are uniform throughout their territory.
3.When setting the charges for network access the following shall be taken into account:
payments and receipts resulting from the inter-transmission system operator compensation mechanism;
actual payments made and received as well as payments expected for future periods of time, estimated on the basis of past periods.
4.Providing that appropriate and efficient locational signals are in place, in accordance with paragraph 2, charges for access to networks applied to producers and consumers shall be applied regardless of the countries of destination and, origin, respectively, of the electricity, as specified in the underlying commercial arrangement. This shall be without prejudice to charges on declared exports and declared imports resulting from congestion management referred to in Article 6.
5.There shall be no specific network charge on individual transactions for declared transits of electricity.
1.Transmission system operators shall put in place coordination and information exchange mechanisms to ensure the security of the networks in the context of congestion management.
2.The safety, operational and planning standards used by transmission system operators shall be made public. The information published shall include a general scheme for the calculation of the total transfer capacity and the transmission reliability margin based upon the electrical and physical features of the network. Such schemes shall be subject to the approval of the regulatory authorities.
3.Transmission system operators shall publish estimates of available transfer capacity for each day, indicating any available transfer capacity already reserved. These publications shall be made at specified intervals before the day of transport and shall include, in any case, week-ahead and month-ahead estimates, as well as a quantitative indication of the expected reliability of the available capacity.
1.Network congestion problems shall be addressed with non-discriminatory market based solutions which give efficient economic signals to the market participants and transmission system operators involved. Network congestion problems shall preferentially be solved with non transaction based methods, i.e. methods that do not involve a selection between the contracts of individual market participants.
2.Transaction curtailment procedures shall only be used in emergency situations where the transmission system operator must act in an expeditious manner and redispatching or countertrading is not possible. Any such procedure shall be applied in a non-discriminatory manner.
Except in cases of ‘force-majeure’, market participants who have been allocated capacity shall be compensated for any curtailment.
3.The maximum capacity of the interconnections and/or the transmission networks affecting cross-border flows shall be made available to market participants, complying with safety standards of secure network operation.
4.Market participants shall inform the transmission system operators concerned a reasonable time ahead of the relevant operational period whether they intend to use allocated capacity. Any allocated capacity that will not be used shall be reattributed to the market, in an open, transparent and non-discriminatory manner.
5.Transmission system operators shall, as far as technically possible, net the capacity requirements of any power flows in opposite direction over the congested interconnection line in order to use this line to its maximum capacity. Having full regard to network security, transactions that relieve the congestion shall never be denied.
6.Any revenues resulting from the allocation of interconnection shall be used for one or more of the following purposes:
(a)guaranteeing the actual availability of the allocated capacity;
(b)network investments maintaining or increasing interconnection capacities;
(c)as an income to be taken into account by regulatory authorities when approving the methodology for calculating network tariffs, and/or in assessing whether tariffs should be modified.
1.New direct current interconnectors may, upon request, be exempted from the provisions of Article 6(6) of this Regulation and Articles 20 and 23(2), (3) and (4) of Directive 2003/54/EC under the following conditions:
(a)the investment must enhance competition in electricity supply;
(b)the level of risk attached to the investment is such that the investment would not take place unless an exemption is granted;
(c)the interconnector must be owned by a natural or legal person which is separate at least in terms of its legal form from the system operators in whose systems that interconnector will be built;
(d)charges are levied on users of that interconnector;
(e)since the partial market opening referred to in Article 19 of Directive 96/92/EC, no part of the capital or operating costs of the interconnector has been recovered from any component of charges made for the use of transmission or distribution systems linked by the interconnector;
(f)the exemption is not to the detriment of competition or the effective functioning of the internal electricity market, or the efficient functioning of the regulated system to which the interconnector is linked.
2.Paragraph 1 shall apply also, in exceptional cases, to alternating current interconnectors provided that the costs and risks of the investment in question are particularly high when compared with the costs and risks normally incurred when connecting two neighbouring national transmission systems by an alternating current interconnector.
3.Paragraph 1 shall apply also to significant increases of capacity in existing interconnectors.
4.(a)The regulatory authority may, on a case by case basis, decide on the exemption referred to in paragraphs 1 and 2. However, Member States may provide that the regulatory authorities shall submit, for formal decision, to the relevant body in the Member State its opinion on the request for an exemption. This opinion shall be published together with the decision.
The exemption may cover all or part of the capacity of the new interconnector, or of the existing interconnector with significantly increased capacity.
In deciding to grant an exemption, consideration shall be given, on a case by case basis, to the need to impose conditions regarding the duration of the exemption and non discriminatory access to the interconnector.
When deciding on the conditions in (i) and (ii) account shall, in particular, be taken of the additional capacity to be built, the expected time horizon of the project and national circumstances.
(c)When granting an exemption the relevant authority may approve or fix the rules and/or mechanisms on the management and allocation of capacity.
(d)The exemption decision, including any conditions referred to in (b), shall be duly reasoned and published.
(e)Any exemption decision shall be taken after consultation with other Member States or regulatory authorities concerned.
5.The exemption decision shall be notified, without delay, by the competent authority to the Commission, together with all the information relevant to the decision. This information may be submitted to the Commission in aggregate form, enabling the Commission to reach a well-founded decision.
In particular, the information shall contain:
the detailed reasons on the basis of which the regulatory authority, or Member State, granted the exemption, including the financial information justifying the need for the exemption;
the analysis undertaken of the effect on competition and the effective functioning of the internal electricity market resulting from the grant of the exemption;
the reasons for the time period and the share of the total capacity of the interconnector in question for which the exemption is granted;
the result of the consultation with the Member States or regulatory authorities concerned;
Within two months after receiving a notification, the Commission may request that the regulatory authority or the Member State concerned amend or withdraw the decision to grant an exemption. The two months period may be extended by one additional month where additional information is sought by the Commission.
If the regulatory authority or Member State concerned does not comply with the request within a period of four weeks, a final decision shall be taken in accordance with the procedure referred to in Article 13(3).
The Commission shall preserve the confidentiality of commercially sensitive information.
1.Where appropriate, the Commission shall, acting in accordance with the procedure referred to in Article 13(2), adopt and amend guidelines on the issues listed under paragraph 2 and 3 and relating to the inter-transmission system operator compensation mechanism, in accordance with the principles set out in Articles 3 and 4. When adopting these guidelines for the first time the Commission shall ensure that they cover in a single draft measure at least the issues referred to in paragraph 2(a) and (d), and paragraph 3.
2.The guidelines shall specify:
(a)details of the procedure for determining which transmission system operators are liable to pay compensation for cross-border flows including as regards the split between the operators of national transmission systems from which cross-border flows originate and the systems where those flows end, in accordance with Article 3(2);
(b)details of the payment procedure to be followed, including the determination of the first period of time for which compensation is to be paid, in accordance with the second subparagraph of Article 3(3);
(c)details of methodologies for determining the cross-border flows hosted for which compensation is to be paid under Article 3, in terms of both quantity and type of flows, and the designation of the magnitudes of such flows as originating and/or ending in transmission systems of individual Member States, in accordance with Article 3(5);
(d)details of the methodology for determining the costs and benefits incurred as a result of hosting cross-border flows, in accordance with Article 3(6);
(e)details of the treatment in the context of the inter-TSO compensation mechanism of electricity flows originating or ending in countries outside the European Economic Area;
(f)the participation of national systems which are interconnected through direct current lines, in accordance with Article 3.
3.The guidelines shall also determine appropriate rules leading to a progressive harmonisation of the underlying principles for the setting of charges applied to producers and consumers (load) under national tariff systems, including the reflection of the inter-TSO compensation mechanism in national network charges and the provision of appropriate and efficient locational signals, in accordance with the principles set out in Article 4.
The guidelines shall make provision for appropriate and efficient harmonised locational signals at European level.
Any harmonisation in this respect shall not prevent Member States from applying mechanisms to ensure that network access charges borne by consumers (load) are comparable throughout their territory.
4.Where appropriate, the Commission shall, acting in accordance with the procedure referred to in Article 13(2), amend the guidelines on the management and allocation of available transfer capacity of interconnections between national systems set out in the Annex, in accordance with the principles set out in Articles 5 and 6, in particular so as to include detailed guidelines on all capacity allocation methodologies applied in practice and to ensure that congestion management mechanisms evolve in a manner compatible with the objectives of the internal market. Where appropriate, in the course of such amendments common rules on minimum safety and operational standards for the use and operation of the network, as referred to in Article 5(2) shall be set.
When adopting or amending guidelines, the Commission shall ensure that they provide the minimum degree of harmonisation required to achieve the aims of this Regulation and do not go beyond what is necessary for that purpose.
When adopting or amending guidelines, the Commission shall indicate what actions it has taken with respect to the conformity of rules in third countries, which form part of the European electricity system, with the guidelines in question.
The regulatory authorities, when carrying out their responsibilities, shall ensure compliance with this Regulation and the guidelines adopted pursuant to Article 8. Where appropriate to fulfil the aims of this Regulation they shall cooperate with each other and with the Commission.
1.Member States and the regulatory authorities shall, on request, provide to the Commission all information necessary for the purposes of Articles 3(4) and 8.
In particular, for the purposes of Article 3(4) and 3(6), regulatory authorities shall provide on a regular basis information on costs actually incurred by national transmission system operators, as well as data and all relevant information relating to the physical flows in transmission system operators' networks and the cost of the network.
The Commission shall fix a reasonable time limit within which the information is to be provided, taking into account the complexity of the information required and the urgency with which the information is needed.
2.If the Member State or the regulatory authority concerned does not provide this information within the given time-limit pursuant to paragraph 1, the Commission may request all information necessary for the purpose of Article 3(4) and 8 directly from the undertakings concerned.
When sending a request for information to an undertaking, the Commission shall at the same time forward a copy of the request to the regulatory authorities of the Member State in whose territory the seat of the undertaking is situated.
3.In its request for information, the Commission shall state the legal basis of the request, the time limit within which the information is to be provided, the purpose of the request, and also the penalties provided for in Article 12(2) for supplying incorrect, incomplete or misleading information. The Commission shall fix a reasonable time limit taking into account the complexity of the information required and the urgency with which the information is needed.
4.The owners of the undertakings or their representatives and, in the case of legal persons, the persons authorised to represent them by law or by their instrument of incorporation, shall supply the information requested. Lawyers duly authorised to act may supply the information on behalf of their clients, in which case the client shall remain fully responsible if the information supplied is incomplete, incorrect or misleading.
5.Where an undertaking does not provide the information requested within the time-limit fixed by the Commission or supplies incomplete information, the Commission may by decision require the information to be provided. The decision shall specify what information is required and fix an appropriate time-limit within which it is to be supplied. It shall indicate the penalties provided for in Article 12(2). It shall also indicate the right to have the decision reviewed by the Court of Justice of the European Communities.
The Commission shall at the same time send a copy of its decision to the regulatory authorities of the Member State within the territory of which the residence of the person or the seat of the undertaking is situated.
6.Information collected pursuant to this Regulation shall be used only for the purposes of Articles 3(4) and 8.
The Commission shall not disclose information acquired pursuant to this Regulation of the kind covered by the obligation of professional secrecy.
This Regulation shall be without prejudice to the rights of Member States to maintain or introduce measures that contain more detailed provisions than those set out in this Regulation and the guidelines referred to in Article 8.
1.Without prejudice to paragraph 2, the Member States shall lay down the rules on penalties applicable to infringements of the provisions of this Regulation and shall take all measures necessary to ensure that they are implemented. The penalties provided for must be effective, proportionate and dissuasive. The Member States shall notify those provisions to the Commission by 1 July 2004 at the latest and shall notify it without delay of any subsequent amendment affecting them.
2.The Commission may by decision impose on undertakings fines not exceeding 1 % of the total turnover in the preceding business year where, intentionally or negligently, they supply incorrect, incomplete or misleading information in response to a request made pursuant to Article 10(3) or fail to supply information within the time-limit fixed by a decision adopted pursuant to the first subparagraph of Article 10(5).
In setting the amount of a fine, regard shall be had to the gravity of the failure to comply with the requirements of the first subparagraph.
3.Penalties provided for pursuant to paragraph 1 and decisions taken pursuant to paragraph 2 shall not be of a criminal law nature.
1.The Commission shall be assisted by a Committee.
2.Where reference is made to this paragraph, Articles 5 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
The period laid down in Article 5(6) of Decision 1999/468/EC shall be set at three months.
3.Where reference is made to this paragraph, Articles 3 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof.
4.The Committee shall adopt its own rules of procedures.
The Commission shall monitor the implementation of this Regulation. It shall submit to the European Parliament and the Council no more than three years after the entry into force of this Regulation a report on the experience gained in its application. In particular the report shall examine to what extent the Regulation has been successful in ensuring non-discriminatory and cost-reflective network access conditions for cross border exchanges of electricity in order to contribute to customer choice in a well functioning internal market and to long-term security of supply, as well as to what extent effective locational signals are in place. If necessary, the report shall be accompanied by appropriate proposals and/or recommendations.
This Regulation shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
It shall apply from 1 July 2004.
This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 26 June 2003.
For the European Parliament
The President
P. Cox
For the Council
The President
A. Tsochatzopoulos
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: