Commission Implementing Regulation (EU) 2016/1240 of 18 May 2016 laying down rules for the application of Regulation (EU) No 1308/2013 of the European Parliament and of the Council with regard to public intervention and aid for private storage (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
Version Superseded: 01/07/2023
Point in time view as at 28/02/2023.
There are currently no known outstanding effects for the Commission Implementing Regulation (EU) 2016/1240, TITLE III.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
1.[F1Any tendering procedure (where tendering applies) or Regulations] fixing the amount of aid in advance may contain the following information:
(a)the products, or types of products, covered with their relevant CN codes, if applicable;
(b)in the case of aid fixed in advance, the amount of aid for storage per unit of measurement for the products covered;
(c)the unit of measurement of the quantities;
(d)if the tender or aid fixed in advance relates to products that have already been placed in storage;
(e)in the case of tenders, the period covered (‘tendering period’) and, if necessary, the different sub-periods during which tenders can be submitted, and in the case of aid fixed in advance the period for submitting an application;
(f)the period of storage;
(g)the global quantity, if applicable;
(h)the minimum quantity per tender or application;
(i)the amount of the security per unit of measurement in the case of tenders and, where applicable, for applications;
(j)the periods of placing into store and of removal from store;
(k)the specifications that have to appear on the packaging, if applicable.
[F21A.In relation to public intervention schemes in England, otherwise than in connection with exceptional market conditions which are the subject of a declaration under section 20 of the Agriculture Act 2020, or in relation to private storage aid schemes in England, paragraph 1 is to be read as if point (i) were omitted.]
F32.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.In the case of tenders, at least six days shall elapse between F4... opening the tendering procedure and the first date for the submission of tenders.
Textual Amendments
F1Words in Art. 39(1) substituted (31.12.2020) by The Agriculture (Legislative Functions) (EU Exit) (No. 2) Regulations 2019 (S.I. 2019/831), regs. 1(4)(a), 60(a) (as amended by S.I. 2020/1445, regs. 1(2)(a), 16(8)); 2020 c. 1, Sch. 5 para. 1(1)
F2Art. 39(1A) inserted (E.) (28.2.2023 at 9.10 a.m.) by The Market Measures Payment Schemes (Amendments, Revocation and Transitional Provision) (England) Regulations 2023 (S.I. 2023/124), regs. 1(2)(b), 9(9) (with reg. 10)
F3Art. 39(2) omitted (31.12.2020) by virtue of The Agriculture (Legislative Functions) (EU Exit) (No. 2) Regulations 2019 (S.I. 2019/831), regs. 1(4)(a), 60(b); 2020 c. 1, Sch. 5 para. 1(1)
F4Words in Art. 39(3) omitted (31.12.2020) by virtue of The Agriculture (Legislative Functions) (EU Exit) (No. 2) Regulations 2019 (S.I. 2019/831), regs. 1(4)(a), 60(c); 2020 c. 1, Sch. 5 para. 1(1)
A tender or application for aid for private storage shall be admissible if it complies with the requirements laid down in Article 2 and the following conditions are met:
it includes at least the following information:
a reference to the [F5published tendering procedure or Regulations] fixing the amount of aid for private storage in advance;
the storage period where so required in the [F5published tendering procedure or Regulations] fixing the amount of aid for private storage in advance;
the quantity of products covered by the tender or application;
where products are already stored, the name and address of each place of private storage, the location of the storage lots/batches/vats/silos with the corresponding quantities and, where appropriate, the number identifying the approved undertaking;
in the case of tenders, the expiry date for the sub-period of submission;
in the case of tenders, the amount of aid in euro proposed per unit of measurement rounded to no more than two decimal places, exclusive of VAT;
the operator has lodged the amount of the security referred to in the [F6published tendering procedure or Regulations] fixing the amount of aid for private storage in advance.
[F7This Article does not apply in relation to public intervention schemes in England, otherwise than in connection with exceptional market conditions which are the subject of a declaration under section 20 of the Agriculture Act 2020.
In relation to private storage aid schemes in England, this Article is to be read as if—
(a)in point (a)(vi), for “euro” there were substituted “sterling”;
(b)point (b) were omitted.]
Textual Amendments
F5Words in Art. 40(a)(i)(ii) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(23); 2020 c. 1, Sch. 5 para. 1(1)
F6Words in Art. 40(b) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(23); 2020 c. 1, Sch. 5 para. 1(1)
F7Words in Art. 40 inserted (E.) (28.2.2023 at 9.10 a.m.) by The Market Measures Payment Schemes (Amendments, Revocation and Transitional Provision) (England) Regulations 2023 (S.I. 2023/124), regs. 1(2)(b), 9(10) (with reg. 10)
1.The paying agency shall decide on the admissibility of tenders and applications on the basis of the conditions set out in Articles 2 and 40.
2.Where the paying agency decides that a tender or application is inadmissible, it shall inform the operator concerned within three working days of the receipt of the tender or application.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F8Art. 42 omitted (31.12.2020) by virtue of The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(24); 2020 c. 1, Sch. 5 para. 1(1)
1.On the basis of the [F9admissible tenders received within the time limits set down in the published tendering procedure], the [F10appropriate authority] shall decide F11...:
(a)not to fix a maximum amount of the aid; or
(b)to fix a maximum amount of the aid.
2.Where the tender is subject to a global quantity as referred to in Article 39(1)(g), and if the award of the total quantities for which that amount has been offered would lead to the global quantity being exceeded, the [F12appropriate authority] shall [F13fix] an allocation coefficient. The coefficient shall apply to the tenders which have been received at the level of the maximum amount of aid.
By way of derogation from Article 2(6), an operator to whom an allocation coefficient applies may withdraw his tender within 10 working days of the date of entry into force of the decision fixing the allocation coefficient.
3.Decisions on aid referred to in paragraphs 1 and 2 shall be published [F14by the appropriate authority].
Textual Amendments
F9Words in Art. 43(1) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(25)(a)(i) (as substituted by S.I. 2020/1445, regs. 1(2)(a), 15(3)(b)); 2020 c. 1, Sch. 5 para. 1(1)
F10Words in Art. 43(1) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(25)(b); 2020 c. 1, Sch. 5 para. 1(1)
F11Words in Art. 43(1) omitted (31.12.2020) by virtue of The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(25)(a)(ii) (as substituted by S.I. 2020/1445, regs. 1(2)(a), 15(3)(b)); 2020 c. 1, Sch. 5 para. 1(1)
F12Words in Art. 43(2) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(25)(b); 2020 c. 1, Sch. 5 para. 1(1)
F13Word in Art. 43(2) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(25)(c); 2020 c. 1, Sch. 5 para. 1(1)
F14Words in Art. 43(3) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(25)(d); 2020 c. 1, Sch. 5 para. 1(1)
1.Where no maximum amount of aid for private storage has been fixed, all tenders shall be rejected.
2.Where a maximum amount of aid has been fixed, the paying agency shall accept tenders which are equal to, or lower than that amount, without prejudice to Article 43(2). All the other tenders shall be rejected.
The paying agency shall only accept [F15tenders received within the time limits set down in the published tendering procedure.].
3.The paying agency shall take the decisions referred to in paragraphs 1 and 2 of this Article after the publication of the decision of the [F16appropriate authority] referred to in Article 43(1).
The paying agency shall notify operators of the outcome of their participation in the tendering procedure within three working days of the entry into force of that decision of the [F16appropriate authority].
Textual Amendments
F15Words in Art. 44(2) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(26)(a); 2020 c. 1, Sch. 5 para. 1(1)
F16Words in Art. 44(3) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(26)(b); 2020 c. 1, Sch. 5 para. 1(1)
1.For products already in storage, an admissible application shall be deemed to have been accepted on the eighth working day following the date of receipt of that application, provided that the [F17appropriate authority] does not adopt a decision in accordance with paragraph 3 in the interim.
2.For products that are not already stored, decisions on acceptance of an admissible application shall be notified by the paying agency to the operator on the eighth working day following the date of receipt of that application, provided that the [F17appropriate authority] does not adopt a decision in accordance with paragraph 3 in the interim.
3.Where an examination of the situation reveals that excessive use has been made of the aid for private storage scheme, or that there is a risk of excessive use or speculation, the [F17appropriate authority] mayF18... decide to:
(a)suspend the application of the scheme for not more than five working days; applications submitted during that period shall not be accepted;
(b)set a single percentage by which the quantities in the applications are reduced, subject to observance of the minimum contractual quantity where appropriate;
(c)reject applications made before the period of suspension the acceptance of which would have been decided during the period of suspension.
By way of derogation from Article 2(6), an operator to whom point (b) of the first subparagraph applies may withdraw his application within 10 working days of the date of entry into force of the decision setting the percentage reduction.
Textual Amendments
F17Words in Art. 45 substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(27)(a); 2020 c. 1, Sch. 5 para. 1(1)
F18Words in Art. 45(3) omitted (31.12.2020) by virtue of The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(27)(b); 2020 c. 1, Sch. 5 para. 1(1)
Modifications etc. (not altering text)
C1Art. 45 applied (with modifications) (E.) (16.11.2021) by The Private Storage Aid for Pigmeat (England) Regulations 2021 (S.I. 2021/1269), regs. 1(2), 7
Following receipt of the notification referred to in the second subparagraph of Article 44(3) or the notification of the decision referred to in Article 45(2), the operator shall notify the paying agency of the timeframe for the entry of products into storage, the name and address of each place of private storage and the corresponding quantities. The notification shall be provided to the paying agency at least five working days before the start of the placing lots into storage. The paying agency may decide to accept a shorter period than five working days.
1.Products shall be placed into storage within 28 days following the notification referred to in the second paragraph of Article 44(3) in the case of tenders, or the notification of the decision referred to in Article 45(2) in the case of applications.
2.For meat, placing in storage shall begin, for each individual lot of the quantity covered by the tender or application, on the day on which it comes under the control of the competent authority. That day shall be the day on which the net weight of the fresh or chilled product is determined:
(a)at the place of private storage, where the product is frozen on the premises;
(b)at the place of freezing, where the product is frozen in suitable facilities outside the place of private storage.
3.Placing into storage shall be considered completed on the day on which the last individual lot of the quantity covered by the tender or application is placed in storage.
1.The contractual storage period starts on the day following:
(a)the date of the notification referred to in Article 44(3), or the date of receipt of an admissible application without prejudice to Article 45(1), for products already placed in storage;
(b)the date that placing into storage is considered completed in accordance with Article 47(3) for products which are not yet stored.
2.The last day of the contractual storage period may be fixed in the [F19published tendering procedure or the Regulations] fixing the amount of aid for private storage in advance, as referred to in Article 39(1)(f).
By way of derogation from Article 3(4) of Council Regulation (EEC, Euratom) No 1182/71(1), when the last day of the contractual storage period falls on Saturday, Sunday or a public holiday, the contractual storage period shall end with the expiry of the last hour of that day.
Textual Amendments
F19Words in Art. 48(2) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(28); 2020 c. 1, Sch. 5 para. 1(1)
[F20Where products are stored or will be stored in the United Kingdom, contracts shall be concluded between the paying agency] and operators fulfilling the requirements laid down in Article 2 of Delegated Regulation (EU) 2016/1238 from whom a tender or application has been accepted.
Contracts shall be concluded for the quantity actually placed in storage (the ‘contractual quantity’), which shall not exceed the quantity referred to the second paragraph of Article 44(3) in the case of tenders, or the quantity in the application in respect of products already in store, or the notification of the decision referred to in Article 45(2) in the case of applications for products not yet in store.
Where the quantity actually placed in storage is less than 95 % of the quantity in the tender or application, or the quantity arising from the application of Article 45(3)(b), no contract shall be concluded.
Contracts shall not be concluded where the eligibility of the products is not confirmed.
Textual Amendments
F20Words in Art. 49 substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(29); 2020 c. 1, Sch. 5 para. 1(1)
The paying agency shall notify the successful operator of a contract considered as being concluded within five working days of the date of issue of the control report referred to in Article 61(1), subject to receiving all of the documents necessary for concluding the contract.
The date of conclusion of the contract shall be that on which the paying agency notifies the operator.
The contract shall be construed as including, where appropriate, the elements provided for in Article 52, as well as those provided for in:
Textual Amendments
F21Words in Art. 51(a) omitted (31.12.2020) by virtue of The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(30)(a); 2020 c. 1, Sch. 5 para. 1(1)
F22Word in Art. 51 omitted (31.12.2020) by virtue of The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(30)(b); 2020 c. 1, Sch. 5 para. 1(1)
1.Contracts shall cover at least the following obligations for the operator:
(a)to place and to keep the contractual quantity in storage, during the contractual storage period, at their own risk and expense under conditions ensuring the maintenance of the characteristics of the products referred to in Article 3 of Delegated Regulation (EU) 2016/1238, without:
substituting the stored products, except in the case of sugar in accordance with paragraph 3;
or transferring them to another place of private storage or, in the case of sugar, to another silo;
(b)to retain the weighing-in documents established at the time of entry into the place of private storage;
(c)to send the documents relating to the operations of placing in storage, including the location of the storage lots/batches/vats/silos with the corresponding quantities, to the paying agency not later than five working days after the date of placing into storage referred to in Article 47(3);
(d)to allow the paying agency to check at any time that all the obligations laid down in the contract are being adhered to;
(e)to make the products stored easily accessible and individually identifiable by storage lot/batch/vat/silo.
2.By way of derogation from point (a)(ii) of paragraph 1, the paying agency may authorise a relocation of the stored products under the following conditions:
for cheeses benefiting from a protected designation of origin (PDO) or from a protected geographical indication (PGI), where the operator submits a reasoned request;
for other products, in exceptional cases, where the operator submits a reasoned request.
[F232A.In relation to private storage aid schemes in England, paragraph 2 is to be read as if—
(a)point (i) were omitted;
(b)in point (ii), “for other products” were omitted.]
3.By way of derogation from point (e) of paragraph 1 of this Article, sugar subject to a contract may be stored in a silo designated by the operator with other sugar provided that the contractual quantity is kept in storage in the designated silo during the contractual period in accordance with Article 8(1) of Delegated Regulation (EU) 2016/1238.
4.The operator shall, on request, make available to the paying agency responsible for checking all documentation, for each contract, allowing in particular the following information on the products placed in storage to be verified:
(a)the number identifying the approved undertaking F24...;
(b)the origin and the date of production of the products, or for sugar the marketing year of production, and for meat the day of slaughtering;
(c)the date of placing into storage;
(d)the weight and, in the case of meat, the number of cuts packaged;
(e)the address of the place of private storage and the means allowing for ready identification of the product within the place of private storage or, for bulk sugar, the identification of the silo designated by the operator;
(f)the end date of the contractual storage period and the actual date of removal from contractual storage.
5.The operator or, where applicable, the storekeeper shall keep a register at the warehouse covering, by contract number:
(a)the identification of the products placed in storage by lot/batch/vat/silo;
(b)the dates of placing in and removal from storage;
(c)the quantity of products in storage by lot/batch/vat/silo;
(d)the location of the products by storage lot/batch/vat/silo within the store.
Textual Amendments
F23Art. 52(2A) inserted (E.) (28.2.2023 at 9.10 a.m.) by The Market Measures Payment Schemes (Amendments, Revocation and Transitional Provision) (England) Regulations 2023 (S.I. 2023/124), regs. 1(2)(b), 9(11) (with reg. 10)
F24Words in Art. 52(4)(a) omitted (31.12.2020) by virtue of The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(31); 2020 c. 1, Sch. 5 para. 1(1)
1.Removal from storage may start on the day following the last day of the contractual storage period or, as the case may be, from the date specified in the [F25published tendering procedure or the Regulations] fixing the amount of aid for private storage in advance.
2.Removal from storage shall be in whole storage lots unless the paying agency authorises removal in smaller quantities.
However, in the case of sealed products as referred to in Article 60, only a sealed quantity may be removed from store.
3.Where in the [F26published tendering procedure or the Regulations] fixing the amount of aid for private storage in advance, the contractual storage period is specified as being between a period of days, the operator shall notify the paying agency of the intention to begin removing products from storage, indicating the storage lots/batches/vats/silos involved, at least five working days before the start of removal operations.
The paying agency may decide to accept a shorter period than five working days.
Textual Amendments
F25Words in Art. 53(1) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(32); 2020 c. 1, Sch. 5 para. 1(1)
F26Words in Art. 53(3) substituted (31.12.2020) by The Market Measures Payment Schemes (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/823), regs. 1, 6(32); 2020 c. 1, Sch. 5 para. 1(1)
The operator shall lodge an application for payment within three months of the end of the contractual storage period.
Payment of the aid shall be made not later than 120 days following the date on which an application for payment is lodged provided that the obligations of the contract have been met.
However, if an administrative inquiry is under way, payment shall not be made until entitlement has been recognised.
Council Regulation (EEC, Euratom) No 1182/71 of 3 June 1971 determining the rules applicable to periods, dates and time limits (OJ L 124, 8.6.1971, p. 1).
The Whole Regulation you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include: