Search Legislation

Commission Implementing Regulation (EU) 2019/947Show full title

Commission Implementing Regulation (EU) 2019/947 of 24 May 2019 on the rules and procedures for the operation of unmanned aircraft (Text with EEA relevance)

 Help about what version

What Version

 Help about advanced features

Advanced Features

More Resources

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

This item of legislation originated from the EU

Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).

Changes to legislation:

There are currently no known outstanding effects for the Commission Implementing Regulation (EU) 2019/947, Article 11. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 11U.K.Rules for conducting an operational risk assessment

1.An operational risk assessment shall:

(a)describe the characteristics of the UAS operation;

(b)propose adequate operational safety objectives;

(c)identify the risks of the operation on the ground and in the air considering all of the below:

i.

the extent to which third parties or property on the ground could be endangered by the activity;

ii.

the complexity, performance and operational characteristics of the unmanned aircraft involved;

iii.

the purpose of the flight, the type of UAS, the probability of collision with other aircraft and class of airspace used;

iv.

the type, scale, and complexity of the UAS operation or activity, including, where relevant, the size and type of the traffic handled by the responsible organisation or person;

v.

the extent to which the persons affected by the risks involved in the UAS operation are able to assess and exercise control over those risks.

(d)identify a range of possible risk mitigating measures;

(e)determine the necessary level of robustness of the selected mitigating measures in such a way that the operation can be conducted safely.

2.The description of the UAS operation shall include at least the following:

(a)the nature of the activities performed;

(b)the operational environment and geographical area for the intended operation, in particular overflown population, orography, types of airspace, airspace volume where the operation will take place and which airspace volume is kept as necessary risk buffers, including the operational requirements for geographical zones;

(c)the complexity of the operation, in particular which planning and execution, personnel competencies, experience and composition, required technical means are planned to conduct the operation;

(d)the technical features of the UAS, including its performance in view of the conditions of the planned operation and, where applicable, its registration number;

(e)the competence of the personnel for conducting the operation including their composition, role, responsibilities, training and recent experience.

3.The assessment shall propose a target level of safety, which shall be equivalent to the safety level in manned aviation, in view of the specific characteristics of UAS operation.

4.The identification of the risks shall include the determination of all of the below:

(a)the unmitigated ground risk of the operation taking into account the type of operation and the conditions under which the operation takes place, including at least the following criteria:

i.

VLOS or BVLOS;

ii.

population density of the overflown areas;

iii.

flying over an assembly of people;

iv.

the dimension characteristics of the unmanned aircraft;

(b)the unmitigated air risk of the operation taking into account all of the below:

i.

the exact airspace volume where the operation will take place, extended by a volume of airspace necessary for contingency procedures;

ii.

the class of the airspace;

iii.

the impact on other air traffic and air traffic management (ATM) and in particular:

  • the altitude of the operation;

  • controlled versus uncontrolled airspace;

  • aerodrome versus non-aerodrome environment;

  • airspace over urban versus rural environment;

  • separation from other traffic.

5.The identification of the possible mitigation measures necessary to meet the proposed target level of safety shall consider the following possibilities:

(a)containment measures for people on the ground;

(b)strategic operational limitations to the UAS operation, in particular:

i.

restricting the geographical volumes where the operation takes place;

ii.

restricting the duration or schedule of the time slot in which the operation takes place;

(c)strategic mitigation by F1... flight rules or F1... airspace structure and services;

(d)capability to cope with possible adverse operating conditions;

(e)organisation factors such as operational and maintenance procedures elaborated by the UAS operator and maintenance procedures compliant with the manufacturer's user manual;

(f)the level of competency and expertise of the personnel involved in the safety of the flight;

(g)the risk of human error in the application of the operational procedures;

(h)the design features and performance of the UAS in particular:

i.

the availability of means to mitigate risks of collision;

ii.

the availability of systems limiting the energy at impact or the frangibility of the unmanned aircraft;

iii.

the design of the UAS to recognised standards and the fail-safe design.

6.The robustness of the proposed mitigating measures shall be assessed in order to determine whether they are commensurate with the safety objectives and risks of the intended operation, particularly to make sure that every stage of the operation is safe.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources