Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
2.—(1) In these Regulations—
“accelerated open procedure” means an open procedure in which the utility has exercised the power conferred by regulation 43(5) (open procedure) to fix a time limit for the receipt of tenders which is shorter than the minimum specified in regulation 43(3) (open procedure);
“ancillary purchasing activity” means activity consisting of the provision of support to a purchasing activity, in particular in any of the following forms—
technical infrastructure enabling a utility to award a contract or to conclude a framework agreement for works, supplies or services;
advice on the conduct or design of procurement;
preparation and management of procurement for and on behalf of the utility concerned;
“buyer profile” means a page on the internet set up by a utility containing one or more of the following: periodic indicative notices, information on on-going invitations to tender, prospective and concluded contracts, cancelled procedures and any useful general information such as a contact point, telephone number, facsimile number, postal address or e-mail address;
“body governed by public law” means a body that has legal personality, is established for the specific purpose of meeting needs in the general interest, not having an industrial or commercial character, and which—
is financed for the most part by the State, regional or local authorities, or by any other body governed by public law;
is subject to management supervision by any such authority or body; or
has an administrative, managerial or supervisory board more than half the members of which were appointed by any body referred to in sub-paragraph (a);
“call for competition” means a call for competition made in a manner permitted by regulation 42(5) (choice of procedures) or, where relevant, one of the notices referred to in regulation 89(1) (publication of notices) or a contest notice;
“candidate” means an economic operator that has sought an invitation or has been invited to take part in—
a restricted procedure;
a negotiated procedure with prior call for competition;
a negotiated procedure without prior call for competition;
a competitive dialogue procedure; or
an innovation partnership;
“central purchasing body” means a utility or contracting authority which provides one or more centralised purchasing activities whether or not including an ancillary purchasing activity;
“centralised purchasing activity” means activity conducted on a permanent basis in one of the following forms—
the acquisition of supplies or services intended for a utility;
the award of contracts or the conclusion of framework agreements for works, supplies or services intended for a utility;
“commenced”, in relation to procurement, except where otherwise provided, means—
where a contract notice has been [F1submitted to the UK e-notification service] in order to invite offers or requests to be selected to tender for or to negotiate, or be selected to participate in a dialogue in relation to a contract, in respect of a proposed contract, framework agreement or dynamic purchasing system;
where a periodic indicative notice has been [F1submitted to the UK e-notification service], in which case the contract award procedure that has commenced is the procedure for the award of any proposed contract the intention to award which was indicated in the notice, but only if the requirements in regulation 65(3)(a) or (b) (periodic indicative notices) are satisfied;
where the utility has dispatched any form of advertisement seeking offers or expressions of interest in the proposed contract, framework agreement or dynamic purchasing system;
in any case where there is no such advertising, where the utility has contacted any economic operator—
in order to seek expressions of interest or offers in respect of a proposed contract, framework agreement or dynamic purchasing system; or
in response to an unsolicited expression of interest or offer in respect of a proposed contract, framework agreement or dynamic purchasing system; or
where the utility has [F2submitted a notice to the UK e-notification service] in order to hold a design contest;
F3...
“common technical specification” means a technical specification in the field of information and communication technology laid down in accordance with Articles 13 and 14 of Regulation (EU) No 1025/2012 of the European Parliament and of the Council on European standardisation [F4as it has effect in EU law], amending Council Directives 89/686/EEC and 93/15/EEC and Directives 94/9/EC, 94/25/EC, 95/16/EC, 97/23/EC, 98/34/EC, 2004/22/EC, 2007/23/EC, 2009/23/EC and 2009/105/EC of the European Parliament and of the Council and repealing Council Decision 87/95/EEC and Decision No 1673/2006/EC of the European Parliament and of the Council(1) as amended from time to time;
“concession contract” means a “works concession” or “services concession” as defined in paragraph (1) of Article 5 of the Concession Contracts Directive and which includes the transfer of an operating risk as set out in that paragraph;
“Concession Contracts Directive” means Directive 2014/23/EU of the European Parliament and Council on the award of concession contracts(2);
“contest notice” means the notice referred to in regulation 92(1) (notices);
“contract”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), and except where otherwise provided, means any works, [F5supply or service] contract for pecuniary interest concluded in writing between one or more economic operators and one or more utilities;
“contract notice”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), means the notice referred to in regulation 67 (contract notices) or, where relevant, 89(1)(a) (publication of notices);
“contracting authority” means the State, a regional or local authority, a body governed by public law or an association formed by one or more such authorities or bodies;
[F6“covered by regulation 3(2)”, in relation to an activity, an element, a part of a contract or a procurement, means that regulation 3(2)—
applies to that activity, element, part or procurement, or
would do so if these Regulations applied,]
“CPV” means the Common Procurement Vocabulary as adopted by Regulation (EC) No. 2195/2002 of the European Parliament and of the Council on the Common Procurement Vocabulary(3) as amended from time to time and “CPV Code” shall be construed accordingly;
“Defence and Security Regulations” means the Defence and Security Public Contracts Regulations 2011(4);
“design contest”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), means those procedures which enable a utility to acquire, mainly in the fields of town and country planning, architecture, engineering or data processing, a plan or design selected by a jury after being put out to competition with or without the award of prizes;
“disabled”, in relation to a person, means a disabled person within the meaning of the Equality Act 2010(5) and, in relation to a worker, means a disabled person who is a worker;
“dynamic purchasing system”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), means the system referred to in regulation 50 (dynamic purchasing systems);
“economic operator”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), means a person or a utility, or a group of such persons or utilities or both, including any temporary associations of undertakings, which offers the execution of works or a work, the supply of products or the provision of services on the market;
[F7“eIDAS Regulation” means Regulation (EU) No 910/2014 of the European Parliament and of the Council on electronic identification and trust services for electronic transactions in the internal market;
“electronic document” has the meaning given in Article 3(35) of the eIDAS Regulation;]
“electronic means” means electronic equipment for the processing (including digital compression) and storage of data which is transmitted, conveyed and received by wire, radio, optical or other electromagnetic means;
[F8“electronic signature” has the meaning given in Article 3(10) of Regulation (EU) No 910/2014 of the eIDAS Regulation;]
F9...
“European standard” means a standard adopted by a European standardisation organisation and made available to the general public;
“European Technical Assessment” means the documented assessment of the performance of a construction product, in relation to its essential characteristics, in accordance with the relevant European Assessment Document as defined in point 12 of Article 2 of Regulation (EU) No 305/2011 of the European Parliament and of the Council laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC (6) as amended from time to time;
F10...
“financial year” except where the context otherwise requires, means the period of 12 months ending on the date in any year in respect of which the accounts of a utility are prepared;
“framework agreement”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), means an agreement between one or more utilities and one or more economic operators, the purpose of which is to establish the terms governing contracts to be awarded during a given period, in particular, terms with regard to price and, where appropriate, the quantity envisaged;
“GPA” means the Agreement on Government Procurement [F11signed at Marrakesh on 15th April 1994, as amended on or before [F1230 October 2023]] (7);
[F13“GPA party” means any country, state or separate customs territory that is—
listed in Schedule A1 (parties to the GPA); or
a member State of the EU;]
“innovation” means the implementation of a new or significantly improved product, service or process, including but not limited to production, building or construction processes, a new marketing method, or a new organisational method in business practices, workplace organisation or external relations including with the purpose of helping to solve societal challenges or to support F14... sustainable and inclusive growth;
“international standard” means a standard adopted by an international standardisation organisation and made available to the general public;
F15...
“label” means any document, certificate or attestation confirming that the works, products, services, processes or procedures in question meet certain requirements;
“label requirements” means the requirements to be met by the works, products, services, processes or procedures in question in order to obtain the label concerned;
“life cycle” means all stages which are consecutive or interlinked, or both, including research and development to be carried out, production, trading and its conditions, transport, use and maintenance, throughout the existence of the product or the works or the provision of the service, from raw material acquisition or generation of resources to disposal, clearance and end of service or utilisation;
“main contractor” means an economic operator to which a utility has awarded a contract or framework agreement;
“national standard” means a standard adopted by a national standardisation organisation and made available to the general public;
F16...
“periodic indicative notice”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), means the notice referred to in regulation 65 (periodic indicative notices) F17...;
“procurement” means the process leading to the award of a contract or framework agreement or establishment of a dynamic purchasing system for the acquisition of works, supplies or services from an economic operator;
“procurement document” means a document produced or referred to by the utility to describe or determine elements of the procurement or the procedure, including the contract notice, the periodic indicative notice or the notices on the existence of a qualification system where they are used as a means of calling for competition, the technical specifications, the descriptive document, proposed conditions of contract, formats for the presentation of documents by candidates and tenderers, information on generally applicable obligations and any additional documents;
“Public Contracts (Scotland) Regulations” means the Public Contracts (Scotland) Regulations 2015(8);
[F18“the Retained Treaties” means anything which is retained EU law by virtue of section 4 of the European Union (Withdrawal) Act 2018F19 because of the effect which the Treaty on European Union or TFEU had immediately before IP completion day in giving rise to any of the rights, powers, liabilities, obligations, restrictions, remedies and procedures mentioned in that section,]
[F20“qualified certificate for electronic signature” has the meaning given in Article 3(15) of the eIDAS Regulation;]
“selection criteria”, except in regulation 93 (rules on the organisation of design contests and the selection of participants and the jury), means selection criteria set out by the utility in accordance with regulations 76 (criteria for qualitative selection) or 78 (use of exclusion grounds and selection criteria provided for under the Public Contracts (Scotland) Regulations);
“service contract” means a contract which has as its object the provision of services other than those referred to in the definition of “works contract”;
[F21“SPD” means the standard procurement document referred to in regulation 60 of the Public Contracts (Scotland) Regulations,]
“standard” means a technical specification, adopted by a recognised standardisation body, for repeated or continuous application, with which compliance is not compulsory, and which is an international standard, a European standard or a national standard;
“supply contract” means a contract which has as its object the purchase, lease, rental or hire-purchase, with or without an option to buy, of products, whether or not the contract also includes, as an incidental matter, siting and installation operations;
“technical reference” means any deliverable produced by European standardisation bodies, other than European standards, according to procedures adapted to the development of market needs;
“technical specification” has the meaning given by regulation 58 (technical specifications);
“tenderer” means an economic operator that has submitted a tender;
“TFEU” means the Treaty on the Functioning of the European Union(9);
[F22“the UK e-notification service” has the meaning mentioned in regulation 69(5), and references (in whatever terms) to the submission of notices to that service are to be construed in accordance with the provisions applied (and adapted) by regulation 69(5),]
“Utilities Contracts Directive” means Directive 2014/25/EU of the European Parliament and of the Council on procurement entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (10);
“utility”, subject to regulation 111(6) (transitional provision and saving where procurement commenced before 18th April 2016), has the meaning given to it by regulation 4 (utilities);
“VAT” means value added tax charged in accordance with the Value Added Tax Act 1994(11);
“a work” means the outcome of building or civil engineering works taken as a whole which is sufficient in itself to fulfil an economic or technical function;
“works” means activities within the meaning of Schedule 1 (activities constituting works) and activities related to these;
“working day” means a day other than a Saturday, Sunday or bank holiday in Scotland within the meaning of the Banking and Financial Dealings Act 1971(12);
“works contract” means a contract which has as its object one of the following—
the execution, or both the design and execution, of works related to one of the activities specified in Schedule 1;
the execution, or both the design and execution, of a work;
the realisation by whatever means of a work corresponding to the requirements specified by the utility exercising decisive influence on the type or design of the work; and
“written” or “in writing” means any expression which can be read by a person, reproduced and subsequently communicated, including information transmitted and stored by electronic means.
F23(2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F23(3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(4) In these Regulations (except regulation 101(4) (enforcement of duties through the courts)), where these Regulations refer to a period of time—
(a)where the period follows an action taken, the day on which the action takes place is not counted in the calculation of the period;
(b)the period must include at least 2 working days; and
(c)where the last day of the period is not a working day, the period is extended to include the next working day.
Textual Amendments
F1Words in reg. 2(1) substituted (31.12.2020) by The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(i)(aa) (with sch. paras. 1-5)
F2Words in reg. 2(1) substituted (31.12.2020) by The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(i)(bb) (with sch. paras. 1-5)
F3Words in reg. 2(1) omitted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(ii) (with sch. paras. 1-5)
F4Words in reg. 2(1) inserted (31.12.2020) by The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(iii) (with sch. paras. 1-5)
F5Words in reg. 2(1) substituted (1.7.2019) by The Public Procurement etc. (Miscellaneous Amendments) (Scotland) Regulations 2019 (S.S.I. 2019/173), regs. 1(2), 2(2)
F6Words in reg. 2(1) inserted (31.12.2020) by The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(iv) (with sch. paras. 1-5)
F7Words in reg. 2(1) inserted (22.7.2016) by The Electronic Identification and Trust Services for Electronic Transactions Regulations 2016 (S.I. 2016/696), reg. 1, Sch. 3 para. 21(2)(a)
F8Words in reg. 2(1) inserted (22.7.2016) by The Electronic Identification and Trust Services for Electronic Transactions Regulations 2016 (S.I. 2016/696), reg. 1, Sch. 3 para. 21(2)(b)
F9Words in reg. 2(1) omitted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(v) (with sch. paras. 1-5)
F10Words in reg. 2(1) omitted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(vi) (with sch. paras. 1-5)
F11Words in reg. 2(1) substituted (11.6.2021) by The Public Procurement (Agreement on Government Procurement) (Amendment) Regulations 2021 (S.I. 2021/573), regs. 1(1), 6(2)(a)
F12Words in reg. 2(1) substituted (30.10.2023) by The Public Procurement (Agreement on Government Procurement) (Miscellaneous Amendments) (Scotland) Regulations 2023 (S.S.I. 2023/287), regs. 1(2), 3(2)
F13Words in reg. 2(1) inserted (11.6.2021) by The Public Procurement (Agreement on Government Procurement) (Amendment) Regulations 2021 (S.I. 2021/573), regs. 1(1), 6(2)(b)
F14Words in reg. 2(1) omitted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(viii) (with sch. paras. 1-5)
F15Words in reg. 2(1) omitted (30.5.2023) by virtue of The Public Procurement (Miscellaneous Amendments) (Scotland) Regulations 2023 (S.S.I. 2023/124), regs. 2, 5(2)(a) (with reg. 3)
F16Words in reg. 2(1) omitted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(ix) (with sch. paras. 1-5)
F17Words in reg. 2(1) omitted (30.5.2023) by virtue of The Public Procurement (Miscellaneous Amendments) (Scotland) Regulations 2023 (S.S.I. 2023/124), regs. 2, 5(2)(b) (with reg. 3)
F18Words in reg. 2(1) inserted (31.12.2020) by The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(x) (with sch. paras. 1-5)
F19 2018 c.16 (“the 2018 Act”). Section 4 of the 2018 Act was amended by section 25 of the European Union (Withdrawal Agreement Act 2020 (c.1).
F20Words in reg. 2(1) inserted (22.7.2016) by The Electronic Identification and Trust Services for Electronic Transactions Regulations 2016 (S.I. 2016/696), reg. 1, Sch. 3 para. 21(2)(c)
F21Words in reg. 2(1) inserted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(v) (with sch. paras. 1-5)
F22Words in reg. 2(1) inserted (31.12.2020) by The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(a)(xi) (with sch. paras. 1-5)
F23Reg. 2(2)(3) omitted (31.12.2020) by virtue of The Public Procurement etc. (EU Exit) (Scotland) (Amendment) Regulations 2020 (S.S.I. 2020/468), regs. 1(2), 6(2)(b) (with sch. paras. 1-5)
Commencement Information
OJ L 316, 14.11.2012, p.1.
OJ L 94, 28.3.2014, p.1.
OJ L 340, 16.12.2002, p.1.
S.I. 2011/1848, amended by S.S.I. 2012/88, S.S.I. 2012/89, S.I. 2015/102 and S.S.I. 2015/446.
OJ L 88, 4.4.2011, p.5, last amended by Commission Delegated Regulation (EU) No 574/2014 (OJ L 159, 28.5.2014, p.41).
All the substantive provisions of the Agreement were substituted by the Protocol which was approved, on behalf of the EU, by Council Decision 2014/115/EU (OJ L 68, 7.3.2014, p.1), to which the text of the Protocol is attached (at OJ L 68, 7.3.2014, p.2). In accordance with Article 3 of the Protocol, the Protocol has entered into force in the EU.
OJ C 326, 26.10.2012, p.47.
OJ L 94, 28.3.2014, p.243.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Policy Note sets out a brief statement of the purpose of a Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2012 onwards. Prior to this date these type of notes existed as ‘Executive Notes’ and accompanied Scottish Statutory Instruments from July 2005 until July 2012.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: