- Latest available (Revised)
- Original (As enacted)
Highways Act 1980, Section 108 is up to date with all changes known to be in force on or before 22 December 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Act (including any effects on those provisions):
(1)An order made under this subsection may authorise a highway authority to divert such part of any navigable watercourse as may be specified in the order if, in the opinion of the authority, the diversion of that part is necessary or desirable in connection with—
(a)the construction, improvement or alteration of a highway;
(b)the provision of a new means of access to any premises from a highway; or
(c)the provision of a maintenance compound or, if that authority are a special road authority, of a service area.
[F1(1A)Subsection (1) is subject to section 33(4) of the Planning Act 2008 (exclusion of powers to make or confirm orders in relation to highways for which development consent required).]
(2)An order under subsection (1) above shall—
(a)if the authority proposing to divert the watercourse is the Minister, be made by him; and
(b)if that authority are a [F2any other ] highway authority, be made by that authority and confirmed by the Minister.
(3)Parts I and III of Schedule 1 to this Act have effect as to the making of any order under subsection (1) above, and Schedule 2 to this Act has effect as to the validity and date of operation of any such order.
(4)An order or scheme which provides for the construction of a bridge over or a tunnel under any navigable waters may authorise the highway authority by whom the bridge or tunnel is to be constructed to divert such part of any navigable watercourse as may be specified in the order or scheme if, in the opinion of that authority, the diversion of that part is necessary or desirable for purposes connected with the bridge or tunnel, or its construction.
(5)An order under section 14 or 18 above may authorise the highway authority by whom the order is made to divert such part of any navigable watercourse as may be specified in the order if, in the opinion of that authority, the diversion of that part is necessary or desirable in connection with—
(a)the construction or improvement of the trunk road, special road or classified road, as the case may be, to which the order relates;
(b)the construction or alteration of any other highway to which the order relates;
(c)the provision in pursuance of the order of a new means of access to any premises; or
(d)the provision of a maintenance compound in connection with the trunk road, special road or classified road, as the case may be, to which the order relates or, in the case of an order under section 18, the provision of a service area.
(6)Where by virtue of an order under subsection (1) above or an order or scheme falling within subsection (4) or (5) above a highway authority are authorised to divert any part of a navigable watercourse they may also divert any towing path or other way adjacent to that part.
Textual Amendments
F1S. 108(1A) inserted (1.3.2010) by Planning Act 2008 (c. 29), ss. 36, 241, Sch. 2 para. 27 (with s. 226); S.I. 2010/101, art. 2 (with art. 6)
F2Words in s. 108(2)(b) substituted (5.3.2015) by Infrastructure Act 2015 (c. 7), s. 57(1), Sch. 1 para. 35; S.I. 2015/481, reg. 2(a)
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: