Search Legislation

Water Act 2003

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Section 75

 Help about opening options

Alternative versions:

Changes to legislation:

Water Act 2003, Section 75 is up to date with all changes known to be in force on or before 12 February 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

75Extension of enforcement authority’s reserve powersE+W

This section has no associated Explanatory Notes

(1)The Reservoirs Act 1975 is amended as follows.

(2)In section 8 (powers of enforcement authority in event of non-compliance with certain requirements), after subsection (3) there is inserted—

(3A)Where it appears to the enforcement authority that the report of an engineer acting under this section includes a recommendation as to measures to be taken in the interests of safety that has not been carried into effect as required by this section, the authority may by written notice served on the undertakers require them to carry the recommendation into effect within a time specified in the notice.

(3B)Where an enforcement authority propose to serve such a notice, the authority shall consult as to the time to be specified in the notice a civil engineer, being a qualified civil engineer for the purpose of inspecting and supervising the reservoir under this section.

(3)In section 15 (reserve powers), in subsection (2), after “section” there is inserted “ 8, ”.

(4)In section 17 (powers of entry), in subsection (1)(b), after “section”, in both places, there is inserted “ 8, ”.

Commencement Information

I1S. 75 in force at 1.4.2004 for E. by S.I. 2004/641, art. 3(t) (with Sch. 3 para. 7)

I2S. 75 in force at 1.4.2004 for W. by S.I. 2004/910, art. 2(1)(e)

Back to top

Options/Help

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?