Search Legislation

The Water Protection Zone (River Dee Catchment) (Procedural and Other Provisions) Regulations 1999

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

More Resources

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. 1.Citation and commencement

  3. 2.Interpretation

  4. 3.Application

  5. 4.Obtaining protection zone consent

  6. 5.Applications for protection zone consent

  7. 6.Procedure upon receipt of applications for protection zone consent

  8. 7.Consideration and determination of applications

  9. 8.Reference of applications to the Secretary of State

  10. 9.Applications for variation of protection zone consent conditions

  11. 10.Applications for the continuation of protection zone consent

  12. 11.Revocation of consents and alteration and imposition of conditions

  13. 12.Appeals

  14. 13.Consents register

  15. 14.Charges in connection with protection zone consent

  16. 15.Inquiries

  17. Signature

    1. SCHEDULE 1

      INFORMATION AND OTHER DOCUMENTATION REQUIRED IN RELATION TO APPLICATIONS FOR PROTECTION ZONE CONSENT

      1. 1.The following is required— (a) a site map;

      2. 2.The site map required by paragraph 1(a) shall be a...

      3. 3.The substance location plan required by paragraph 1(b) shall be...

      4. 4.The substance specification statement required by paragraph 1(c) shall contain...

      5. 5.The safety and emergency statement required by paragraph 1(d) shall...

      6. 6.The process specification statement required by paragraph 1(e) shall contain...

    2. SCHEDULE 2

      INFORMATION AND OTHER DOCUMENTATION REQUIRED IN RELATION TO APPLICATIONS FOR VARIATION OF PROTECTION ZONE CONSENT

      1. 1.(1) The following is required— (a) a copy of the...

      2. 2.The relevant consent referred to in sub-paragraph 1(1)(a) is the...

      3. 3.The safety and emergency statement required by sub-paragraph 1(1)(e) shall...

    3. SCHEDULE 3

      INFORMATION AND OTHER DOCUMENTATION REQUIRED IN RELATION TO APPLICATIONS FOR CONTINUATION OF PROTECTION ZONE CONSENT

      1. 1.The following is required— (a) a copy of the relevant...

      2. 2.The change of control plan required by paragraph 1(a) shall...

      3. 3.The relevant consent referred to in paragraph 1(a) is the...

      4. 4.The safety and emergency statement required by paragraph 1(d) shall...

  18. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources