Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Article 37
Modifications etc. (not altering text)
1.—(1) The following provisions of this Part of this Schedule shall, unless otherwise agreed in writing between DLRL and Railtrack PLC, have effect.E+W
(2) In this Part of this Schedule—
“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
“the engineer” means an engineer appointed by Railtrack PLC for the purpose in question;
“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals and programmes;
“Railtrack” means Railtrack PLC and any associated company of Railtrack PLC which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 736 of the Companies Act 1985) the holding company of Railtrack PLC, a subsidiary of Railtrack PLC or another subsidiary of the holding company of Railtrack PLC;
“railway property” means any railway belonging to Railtrack PLC and any land, works, apparatus and equipment belonging to Railtrack directly related to any such railway and any easement or other property interest held by or for the benefit of Railtrack; and
“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.
2.—(1) DLRL shall not exercise the powers conferred by article 18 above or the powers conferred by section 11(3) of the 1965 Act in respect of any railway property unless the exercise of such powers is with the consent of Railtrack PLC.E+W
(2) DLRL shall not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Railtrack PLC.
(3) DLRL shall not exercise the powers conferred by sections 271 or 272 of the 1990 Act, as applied by Schedule 10 to this Order, in relation to any right of access of Railtrack to railway property but such right of access may be diverted with the consent of Railtrack PLC.
(4) DLRL shall not under the powers of this Order acquire or use or acquire new rights over any railway property except with the consent of Railtrack PLC.
(5) Where Railtrack PLC is asked to give its consent pursuant to sub-paragraph (1), (2), (3) or (4) above, such consent shall not be unreasonably withheld but may be given subject to reasonable conditions.
3.—(1) DLRL shall before commencing construction of any specified work supply to Railtrack PLC proper and sufficient plans of that work for the reasonable approval of the engineer and shall not commence such construction of the specified work until plans of that work have been approved in writing by the engineer or settled by arbitration.E+W
(2) The approval of the engineer under sub-paragraph (1) above shall not be unreasonably withheld, and if by the end of the period of 56 days beginning with the date on which such plans have been supplied to Railtrack PLC the engineer has not intimated his disapproval of those plans and the grounds of his disapproval he shall be deemed to have approved the plans as submitted.
(3) If by the end of the period of 56 days beginning with the date on which such plans have been supplied to Railtrack PLC, Railtrack PLC gives notice to DLRL that Railtrack PLC desires itself to construct any part of a specified work which in the opinion of the engineer will or may affect the stability of railway property or the safe operation of traffic on the railways of Railtrack PLC then, if DLRL desires such part of the specified work to be constructed, Railtrack PLC shall construct it (together with any adjoining part of the specified work which DLRL reasonably requires to be constructed in one operation with that work) with all reasonable dispatch on behalf of and to the reasonable satisfaction of DLRL in accordance with the plans approved or deemed to be approved or settled under this paragraph and under the supervision (where appropriate and if given) of DLRL.
(4) In the event of Railtrack PLC not constructing or completing any part of a specified work pursuant to sub-paragraph (3) above with all reasonable dispatch and to the reasonable satisfaction of DLRL in accordance with such programme as may be agreed with DLRL or settled by arbitration, Railtrack PLC shall pay compensation to DLRL for any loss which it may sustain as a result.
(5) When signifying his approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in his opinion should be carried out before the commencement of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of the railways of Railtrack PLC or the services of operators using the same (including any relocation of works, apparatus and equipment necessitated by a specified work), and such protective works as may be reasonably necessary for those purposes shall be constructed by Railtrack PLC or by DLRL, if Railtrack PLC so desires, with all reasonable dispatch and DLRL shall not commence the construction of the specified works until the engineer has notified DLRL that the protective works have been completed to his reasonable satisfaction.
4.—(1) Any specified work shall, when commenced, be constructed—E+W
(a)with all reasonable dispatch in accordance with the plans approved or deemed to have been approved or settled under paragraph 3 above;
(b)under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer;
(c)in such manner as to cause as little damage as is possible to railway property; and
(d)so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway of Railtrack PLC or the traffic thereon and the use by passengers of railway property,
and, if any damage to railway property or any such interference or obstruction is caused or takes place in consequence of the construction of a specified work, DLRL shall, notwithstanding any such approval, make good such damage and shall pay to Railtrack PLC all reasonable expenses to which Railtrack may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.
(2) Nothing in this paragraph shall impose any liability on DLRL with respect to any damage, costs, expenses or loss attributable to the negligence of Railtrack or its servants, contractors or agents.
5. DLRL shall—E+W
(a)at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and
(b)supply the engineer with all such information as he may reasonably require with regard to a specified work or the method of constructing it.
6. Railtrack PLC shall at all times afford reasonable facilities to DLRL and its agents for access to any works carried out by Railtrack PLC under this Schedule during their construction and shall supply DLRL with such information as it may reasonably require with regard to such works or the method of constructing them.E+W
7.—(1) If any alterations or additions, either permanent or temporary, to railway property are reasonably necessary during the construction of a specified work, or during a period of 12 months after the commencement of regular revenue-earning train operations using the new railways comprised in any specified work, in consequence of the construction of a specified work, and Railtrack PLC gives to DLRL reasonable notice of its intention specifying the alterations or additions to be carried out, DLRL shall pay to Railtrack PLC the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Railtrack in maintaining, working and, when necessary, renewing any such alterations or additions.E+W
(2) The engineer shall, in respect of the capitalised sums referred to in this paragraph and paragraph 8(a) below, provide such details of the formula by which those sums have been calculated as DLRL may reasonably require.
(3) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving shall be set off against any sum payable by DLRL to Railtrack PLC under this paragraph.
8. DLRL shall repay to Railtrack PLC all reasonable fees, costs, charges and expenses reasonably incurred by Railtrack—E+W
(a)in constructing any part of a specified work on behalf of DLRL as provided by paragraph 3(3) above or in constructing any protective works under the provisions of paragraph 3(5) above including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works; and
(b)in respect of the approval by the engineer of plans submitted by DLRL and the supervision by him of the construction of a specified work.
9.—(1) In this paragraph—E+W
“EMI” means, subject to sub-paragraph (2) below, electromagnetic interference with Railtrack’s apparatus generated by the operation of the authorised works (including the operation of trains using the new railways comprised in the works) where such interference is of a level which adversely affects the safe operation of Railtrack’s apparatus; and
“Railtrack’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised works) which are owned or used by Railtrack for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.
(2) This paragraph shall apply to EMI only to the extent that such EMI is not attributable to any change to Railtrack’s apparatus carried out after approval of plans under paragraph 3(1) above for the relevant part of the authorised works giving rise to EMI (unless DLRL has been given notice in writing before the approval of those plans of the intention to make such change).
(3) Subject to sub-paragraph (5) below, DLRL shall in the design and construction of the authorised works take all measures necessary to prevent EMI and shall establish with Railtrack (both parties acting reasonably) appropriate arrangements to verify their effectiveness.
(4) In order to facilitate DLRL’s compliance with sub-paragraph (3) above—
(a)DLRL shall consult with Railtrack PLC as early as reasonably practicable to identify all Railtrack’s apparatus which may be at risk of EMI, and thereafter shall continue to consult with Railtrack PLC (both before and after formal submission of plans under paragraph 3(1) above) to identify all potential causes of EMI and the measures required to eliminate them;
(b)Railtrack PLC shall make available to DLRL all information in Railtrack’s possession reasonably requested by DLRL in respect of Railtrack’s apparatus identified pursuant to paragraph (a) above; and
(c)Railtrack PLC shall allow DLRL reasonable facilities for the inspection of Railtrack’s apparatus identified pursuant to paragraph (a) above.
(5) In any case where it is established that EMI can only reasonably be prevented by modifications to Railtrack’s apparatus, Railtrack shall not withhold its consent unreasonably to modifications of Railtrack’s apparatus, but the means of prevention and the method of their execution shall be selected in Railtrack PLC’s reasonable discretion and in relation to such modifications paragraph 3(1) above shall have effect subject to this sub-paragraph.
(6) If at any time prior to the commencement of regular revenue-earning train operations on the new railways comprised in the authorised works and notwithstanding any measures adopted pursuant to sub-paragraph (3) above, the testing or commissioning of the authorised works causes EMI then DLRL shall immediately upon receipt of notification by Railtrack of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) DLRL’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5) above) to Railtrack’s apparatus.
(7) In the event of EMI having occurred—
(a)DLRL shall afford reasonable facilities to Railtrack PLC for access to DLRL’s apparatus in the investigation of such EMI;
(b)Railtrack shall afford reasonable facilities to DLRL for access to Railtrack’s apparatus in the investigation of such EMI; and
(c)Railtrack shall make available to DLRL any additional material information in its possession reasonably requested by DLRL in respect of Railtrack’s apparatus or such EMI.
(8) Where Railtrack PLC approves modifications to Railtrack’s apparatus pursuant to sub-paragraphs (5) or (6) above—
(a)Railtrack shall allow DLRL reasonable facilities for the inspection of the relevant part of Railtrack’s apparatus;
(b)any modifications to Railtrack’s apparatus approved pursuant to those sub-paragraphs shall be carried out and completed by DLRL in accordance with paragraph 4 above.
(9) To the extent that it would not otherwise do so, the indemnity in paragraph 13(1) below shall apply to the costs and expenses reasonably incurred or losses suffered by Railtrack through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Railtrack’s apparatus) or in consequence of any EMI to which sub-paragraph (6) above applies.
(10) For the purpose of paragraph 8(a) above any modifications to Railtrack’s apparatus under this paragraph shall be deemed to be protective works referred to in that paragraph.
(11) In relation to any dispute arising under this paragraph the reference in article 48 above to the Institution of Civil Engineers shall be read as a reference to the Institution of Electrical Engineers.
10. If at any time after the completion of a specified work, not being a work vested in Railtrack, Railtrack PLC gives notice to DLRL informing it that the state of maintenance of the specified work appears to be such as adversely affects the operation of railway property, DLRL shall, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.E+W
11. DLRL shall not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Railtrack PLC unless it shall have first consulted Railtrack PLC and it shall comply with Railtrack PLC’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.E+W
12. Any additional expenses which Railtrack may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work shall, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to DLRL, be repaid by DLRL to Railtrack PLC.E+W
13.—(1) DLRL shall pay to Railtrack PLC all reasonable costs, charges, damages and expenses not otherwise provided for in this Schedule which may be occasioned to or reasonably incurred by Railtrack—E+W
(a)by reason of the construction or maintenance of a specified work or the failure thereof; or
(b)by reason of any act or omission of DLRL or of any person in its employ or of its contractors or others whilst engaged upon a specified work;
and DLRL shall indemnify Railtrack from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission; and the fact that any act or thing may have been done by Railtrack on behalf of DLRL or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under his supervision shall not (if it was done without negligence on the part of Railtrack or of any person in its employ or of its contractors or agents) excuse DLRL from any liability under the provisions of this sub-paragraph.
(2) Railtrack PLC shall give DLRL reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand shall be made without the prior consent of DLRL.
(3) The sums payable by DLRL under sub-paragraph (1) above shall include a sum equivalent to the relevant costs.
(4) Subject to the terms of any agreement between Railtrack PLC and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Railtrack PLC shall promptly pay to each train operator the amount of any sums which Railtrack PLC receives under sub-paragraph (3) above which relates to the relevant costs of that train operator.
(5) The obligation under sub-paragraph (3) above to pay Railtrack PLC the relevant costs shall, in the event of default, be enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub-paragraph (4) above.
(6) In this paragraph—
F1...
“the relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Railtrack’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in sub-paragraph (1) above; and
“train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 of the Railways Act 1993 [F2or any person who holds a [F3railway undertaking licence] granted pursuant to the Railway (Licensing of Railway Undertakings) Regulations 2005 F4...]
Textual Amendments
F1Words in Sch. 11 para. 13(6) omitted (31.12.2020) by virtue of The Railway (Licensing of Railway Undertakings) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/700), regs. 1(2), 27(2); 2020 c. 1, Sch. 5 para. 1(1)
F2Words in Sch. 11 para. 13(6) added (28.11.2005) by The Railway (Licensing of Railway Undertakings) Regulations 2005 (S.I. 2005/3050), reg. 1(1), Sch. 1 para. 10(2)(b)
F3Words in Sch. 11 para. 13(6) substituted (31.12.2020) by The Railway (Licensing of Railway Undertakings) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/700), regs. 1(2), 27(3)(a); 2020 c. 1, Sch. 5 para. 1(1)
F4Words in Sch. 11 para. 13(6) omitted (31.12.2020) by virtue of The Railway (Licensing of Railway Undertakings) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/700), regs. 1(2), 27(3)(b); 2020 c. 1, Sch. 5 para. 1(1)
14. In the assessment of any sums payable to Railtrack under this Schedule there shall not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Railtrack if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by DLRL under this Schedule or increasing the sums so payable.E+W
15. DLRL and Railtrack PLC may enter into, and carry into effect, agreements for the transfer to DLRL of—E+W
(a)any railway property shown on the deposited plans and described in the book of reference;
(b)any lands, works or other property held in connection with any such railway property; and
(c)any rights and obligations (whether or not statutory) of Railtrack PLC relating to any railway property.
16.—(1) The following provisions of this Part of this Schedule shall, unless otherwise agreed in writing between DLRL and LUL, have effect for the protection of the Underground companies.E+W
(2) In this Part of this Schedule—
“construction” includes execution, demolition, placing, alteration, reconstruction and maintenance and “construct” and “constructed” have corresponding meanings;
“EMI” means, subject to paragraph 24(1) below, electromagnetic interference with the Underground companies’ works and apparatus generated by the operation of the authorised works (including the operation of trains using the new railways comprised in the works) where such interference is of a level which adversely affects the safe operation of the Underground companies’ works and apparatus;
“the engineer” means an engineer appointed by LUL for the purpose in question;
“LUL” means London Underground Limited;
“maintenance” means works of maintenance and repair that are material to the structures and safe operation of railway property;
“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals and programmes;
“PPP company” means a company undertaking to carry out or secure the carrying out of any or all of the work mentioned in section 210(3) of the Greater London Authority Act 1999 M1;
“PPP-related third party” means any person with whom arrangements of the type mentioned in section 215(2)(b) of the Greater London Authority Act 1999 are entered into;
“railway property” means any railway belonging to LUL, any works, apparatus and equipment of the Underground companies connected with any such railway and any land, premises, arch, cellar or vault belonging to or used by the Underground companies for the purposes of any such railway, works, apparatus or equipment;
“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property;
“subsidiary” has the same meaning as in section 736 of the Companies Act 1985 M2;
“the Underground companies” means LUL, any subsidiary of LUL, a PPP company, any subsidiary of a PPP company and any PPP-related third party; and
“the Underground companies’ works and apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised works) which are owned or used by the Underground companies for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.
17.—(1) DLRL shall not exercise the powers conferred by article 18 above or the powers conferred by section 11(3) of the 1965 Act in respect of any railway property unless the exercise of such powers is with the consent of LUL.E+W
(2) DLRL shall not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of LUL.
(3) The provisions of Schedule 10 to this Order shall not apply to any railway property to which this Part of this Schedule applies.
(4) Except with the consent of LUL, DLRL shall not under the powers of Part III of this Order—
(a)acquire or enter upon,
(b)take or use, whether temporarily or permanently,
(c)acquire any new right over, or
(d)acquire any existing right of the Underground companies relating to,
any railway property.
(5) Where LUL is asked to give its consent pursuant to sub-paragraph (1), (2), (3) or (4) above, such consent shall not be unreasonably withheld but may be given subject to reasonable conditions.
18.—(1) DLRL shall before commencing construction of any specified work supply to LUL proper and sufficient plans of that work for the reasonable approval of the engineer and shall not commence such construction of the specified work until plans of that work have been approved in writing by the engineer or settled by arbitration.E+W
(2) The approval of the engineer under sub-paragraph (1) above shall not be unreasonably withheld, and if by the end of the period of 56 days beginning with the date on which such plans have been supplied to LUL the engineer has not intimated his disapproval of those plans and the grounds of his disapproval he shall be deemed to have approved the plans as submitted.
(3) When signifying his approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in his reasonable opinion should be carried out before the commencement of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of any railway belonging to LUL or the services of operators using the same (including any relocation of works, apparatus and equipment necessitated by a specified work), and such protective works as may be reasonably necessary for those purposes shall be constructed by LUL or by DLRL, if LUL so desires, with all reasonable dispatch and DLRL shall not commence the construction of the specified works until the engineer has notified DLRL that the protective works have been completed to his reasonable satisfaction.
(4) The engineer shall inspect the protective works and notify DLRL that they have been completed to his reasonable satisfaction, or otherwise, as soon as reasonably practicable after they have been completed.
19.—(1) Any specified work and any protective work specified pursuant to paragraph 18(3) above shall, when commenced, be constructed—E+W
(a)with all reasonable dispatch in accordance with the plans approved or deemed to have been approved or settled under paragraph 18 above;
(b)under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer;
(c)in such manner as to cause as little damage as is possible to railway property; and
(d)so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway belonging to LUL or the traffic thereon and the use by passengers of railway property,
and, if any damage to railway property or any such interference or obstruction is caused or takes place in consequence of the construction of a specified work, DLRL shall, notwithstanding any such approval, make good such damage and shall pay to LUL all reasonable expenses to which LUL may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.
(2) Nothing in this paragraph shall impose any liability on DLRL with respect to any damage, cost, expense or loss attributable to the negligence of the Underground companies or their servants, contractors or agents and any liability of DLRL under this paragraph shall be reduced proportionately to the extent to which any damage, cost, expense or loss is attributable to the negligence of the Underground companies or their servants, contractors or agents.
20. DLRL shall—E+W
(a)at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and
(b)supply the engineer with all such information as he may reasonably require with regard to a specified work or the method of constructing it.
21. The Underground companies shall at all times afford reasonable facilities to DLRL and its agents for access to any works carried out by LUL under this Part of this Schedule during their construction and LUL shall supply DLRL with such information as it may reasonably require with regard to such works or the method of constructing them.E+W
22.—(1) If any alterations or additions, either permanent or temporary, to railway property are reasonably necessary during the construction of a specified work, or during a period of 12 months after the commencement of regular revenue-earning train operations using the new railways comprised in any specified work, in consequence of the construction of a specified work, and LUL gives to DLRL reasonable notice of its intention to carry out any such alterations or additions specifying the alterations or additions to be carried out, DLRL shall pay to LUL the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by the Underground companies in maintaining, working and, when necessary, renewing any such alterations or additions.E+W
(2) The engineer shall, in respect of the capitalised sums referred to in this paragraph and paragraph 23(a) below, provide such details of the formula by which those sums have been calculated as DLRL may reasonably require.
(3) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving shall be set off against any sum payable by DLRL to LUL under this paragraph.
23. DLRL shall repay to LUL all reasonable fees, costs, charges and expenses reasonably incurred by the Underground companies—E+W
(a)in constructing any protective works under the provisions of paragraph 18(3) above including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;
(b)in respect of the employment or procurement of the services of any inspectors, supervisory staff, signalmen, watchmen and other persons whom it shall be reasonably necessary to appoint for inspecting, monitoring, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work and to ensure the continued safe and economic operation of LUL’s railway undertaking or the services of operators using the same (including any relocation of works, apparatus and equipment necessitated by a specified work) and the comfort and safety of passengers;
(c)in respect of any special traffic working resulting from any speed restrictions which may, in the reasonable opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of a specified work, or from the substitution or diversion of services which may be reasonably necessary for the same reason;
(d)in respect of any additional temporary lighting of railway property in the vicinity of a specified work, being lighting made reasonably necessary by reason or in consequence of the construction or failure of a specified work; and
(e)in respect of the approval by the engineer of plans submitted by DLRL and the supervision by him of the construction of a specified work.
24.—(1) This paragraph shall apply to EMI only to the extent that such EMI is not attributable to any change to the Underground companies’ apparatus carried out after approval of plans under paragraph 18(1) above for the relevant part of the authorised works giving rise to EMI (unless DLRL has been given notice in writing before the approval of those plans of the intention to make such change).E+W
(2) Subject to sub-paragraph (4) below, DLRL shall in the design and construction of the authorised works take all measures necessary to prevent EMI and shall establish with LUL (both parties acting reasonably) appropriate arrangements to verify their effectiveness.
(3) In order to facilitate DLRL’s compliance with sub-paragraph (2) above—
(a)DLRL shall consult with LUL as early as reasonably practicable to identify all the Underground companies’ works and apparatus which may be at risk of EMI, and thereafter shall continue to consult with LUL (both before and after formal submission of plans under paragraph 18(1) above) to identify all potential causes of EMI and the measures required to eliminate them;
(b)the Underground companies shall make available to DLRL all information in their possession reasonably requested by DLRL in respect of the Underground companies’ works and apparatus identified pursuant to paragraph (a) above; and
(c)the Underground companies shall allow DLRL reasonable facilities for the inspection of the Underground companies’ works and apparatus identified pursuant to paragraph (a) above.
(4) In any case where it is established that EMI can only reasonably be prevented by modifications to the Underground companies’ works and apparatus, the Underground companies shall not withhold their consent unreasonably to modifications of the Underground companies’ works and apparatus, but the means of prevention and the method of their execution shall be selected in LUL’s reasonable discretion and in relation to such modifications paragraph 18(1) above shall have effect subject to this sub-paragraph.
(5) If at any time prior to the commencement of regular revenue-earning train operations on the new railways comprised in the authorised works and notwithstanding any measures adopted pursuant to sub-paragraph (2) above, the testing or commissioning of the authorised works causes EMI then DLRL shall immediately upon receipt of notification by LUL of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) DLRL’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (4) above) to the Underground companies’ works and apparatus.
(6) In the event of EMI having occurred—
(a)DLRL shall afford reasonable facilities to the Underground companies for access to DLRL’s apparatus in the investigation of such EMI;
(b)the Underground companies shall afford reasonable facilities to DLRL for access to the Underground companies’ works and apparatus in the investigation of such EMI; and
(c)the Underground companies shall make available to DLRL any additional material information in their possession reasonably requested by DLRL in respect of the Underground companies’ works and apparatus or such EMI.
(7) Where the Underground companies approve modifications to the Underground companies’ works and apparatus pursuant to sub-paragraphs (4) or (5) above—
(a)the Underground companies shall allow DLRL reasonable facilities for the inspection of the relevant part of the Underground companies’ works and apparatus;
(b)any modifications to the Underground companies’ works and apparatus approved pursuant to those sub-paragraphs shall be carried out and completed by DLRL in accordance with paragraph 19 above.
(8) To the extent that it would not otherwise do so, the indemnity in paragraph 26(1) below shall apply to the costs and expenses reasonably incurred or losses suffered by the Underground companies through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to the Underground companies’ works and apparatus) or in consequence of any EMI to which sub-paragraph (5) above applies.
(9) For the purpose of paragraph 23(a) above any modifications to the Underground companies’ works and apparatus under this paragraph shall be deemed to be protective works referred to in that paragraph.
(10) In relation to any dispute arising under this paragraph the reference in article 48 above to the Institution of Civil Engineers shall be read as a reference to the Institution of Electrical Engineers.
25. If at any time after the completion of a specified work, not being a work vested in the Underground companies, LUL gives notice to DLRL informing it that the state of maintenance of the specified work appears to be such as adversely affects the operation of railway property, DLRL shall, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.E+W
26.—(1) DLRL shall pay to LUL all reasonable costs, charges, damages and expenses not otherwise provided for in this Part of this Schedule which may be occasioned to or reasonably incurred by the Underground companies—E+W
(a)by reason of the construction of a specified work or the failure thereof; or
(b)by reason of any act or omission of DLRL or of any person in its employ or of its contractors or others whilst engaged upon a specified work,
and DLRL shall indemnify the Underground companies from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission; and the fact that any act or thing may have been done by the Underground companies on behalf of DLRL or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under his supervision shall not (if it was done without negligence on the part of the Underground companies or of any person in their employ or of their contractors or agents) excuse DLRL from any liability under the provisions of this sub-paragraph.
(2) The Underground companies shall give DLRL reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand shall be made without the prior consent of DLRL.
(3) Any liability of DLRL under this paragraph shall be reduced proportionately to the extent to which any cost, charge, damage, expense, claim, demand or loss is attributable to the negligence of the Underground companies or their servants, contractors or agents.
27. In the assessment of any sums payable to the Underground companies under this Part of this Schedule there shall not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by the Underground companies if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by DLRL under this Part of this Schedule or increasing the sums so payable.E+W
28. DLRL and the Underground companies may enter into, and carry into effect, agreements for the transfer to DLRL of—E+W
(a)any railway property shown on the deposited plans and described in the book of reference;
(b)any lands, works or other property held in connection with any such railway property; and
(c)any rights and obligations (whether or not statutory) of the Underground companies relating to any railway property.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: