Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
7.—(1) Where the operator of a regular service or regular scheduled service which operates throughout the year wishes to introduce an additional ship or high speed craft onto that service for a period of less than one year, that operator shall give the Secretary of State at least one month’s notice of the proposed operation of the ship or craft.
(2) Where:
(a)a ro-ro passenger ship or high speed craft is being introduced onto a regular service or regular scheduled service which operates throughout the year following unforeseen circumstances and in order to ensure continuity of service, and
[F1(b)that ship or craft has been inspected in accordance with the Merchant Shipping (Inspections of Ro-Ro Passenger Ships and High-Speed Passenger Craft) Regulations 2023,]
regulation 4 or 5 of these Regulations (as the case may be) and paragraph (1) above shall not apply to that ship or craft.
(3) The operator of a regular service or regular scheduled service which operates seasonally for a period not exceeding six months in an annual period shall give the Secretary of State three month’s notice of the proposed operation of the service.
(4) Where a regular service or regular scheduled service which operates seasonally for a period not exceeding six months in an annual period operates under conditions of lower significant wave height than those established for year round operation in Merchant Shipping Notice 1790, the significant wave height value applicable for this shorter time period may be used for determining the height of water on the deck when applying the stability requirements contained in regulation 4.
Textual Amendments
F1Reg. 7(2)(b) substituted (5.10.2023) by The Merchant Shipping (Inspections of Ro-Ro Passenger Ships and High-Speed Passenger Craft) Regulations 2023 (S.I. 2023/984), reg. 1(1), Sch. 5 para. 3 (with reg. 3)
Commencement Information
I1Reg. 7 in force at 29.11.2004, see reg. 1
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: