Search Legislation

The Railways (Interoperability) Regulations 2006

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Railways (Interoperability) Regulations 2006. Those changes will be listed when you open the content using the Table of Contents below. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the affected provisions when you open the content using the Table of Contents below.

View outstanding changes

Changes and effects yet to be applied to :

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

  1. Introductory Text

  2. PART 1 Interpretation and Application

    1. 1.Citation and commencement

    2. 2.Interpretation

    3. 3.Application

  3. PART 2 Subsystems

    1. 4.Requirement for authorisation

    2. 5.Renewal or upgrading of subsystems

    3. 6.Exemption from need to conform with TSIs (derogations)

    4. 7.Essential requirements for project subsystems

    5. 8.Duties on a contracting entity

    6. 9.Project subsystems: verification assessment procedure

    7. 10.Project subsystems: verification declaration

    8. 11.Technical file and retention of documents

    9. 12.Duty on operator to ensure essential requirements are met

    10. 13.Fees payable to the Safety Authority

    11. 14.Fees payable to the Competent Authority

    12. 15.Transitional conventional TEN projects and renewal projects on the high-speed rail system

  4. PART 3 Interoperability Constituents

    1. 16.EC declaration of conformity or of suitability for use

    2. 17.Effect of conformity and suitability declarations

    3. 18.Assessment procedure for interoperability constituents

    4. 19.Prohibition on placing interoperability constituents on the market

    5. 20.Duties on operators

    6. 21.Position after placing on the market

    7. 22.Recognition of assessments of other Member States

    8. 23.Notification to the Commission of incorrect declaration

  5. PART 4 Notified Bodies

    1. 24.Notified bodies

    2. 25.Appointment of notified bodies by the Secretary of State

    3. 26.Requirement on notified bodies to carry out functions

    4. 27.Notified bodies: certificates of conformity etc.

    5. 28.Duties on notified bodies to consult

    6. 29.Fees of notified bodies

    7. 30.Fees of the Secretary of State

  6. PART 5 Registers

    1. 31.Registers of authorised infrastructure and authorised rolling stock

    2. 32.Publication and notification of registers

    3. 33.National vehicle register

  7. PART 6 Enforcement

    1. 34.Enforcement in Great Britain

    2. 35.Enforcement in Northern Ireland

    3. 36.Notices relating to interoperability constituents not meeting the essential requirements

    4. 37.Notice of improper drawing up of the EC declaration of conformity for an interoperability constituent

    5. 38.Defence of due diligence

    6. 39.Liability of persons other than the principal offender

  8. PART 7 Supplementary

    1. 40.Revocation, transitional provision and savings

  9. Signature

    1. SCHEDULE 1

      (This Schedule reproduces the provisions of Annex I to the High-Speed Directive)

      1. THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM

        1. 1.THE INFRASTRUCTURE

        2. 2.THE ROLLING STOCK

        3. 3.COMPATIBILITY OF THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM

    2. SCHEDULE 2

      (This Schedule reproduces the provisions of Annex I to the Conventional Directive)

      1. THE TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM

        1. 1.INFRASTRUCTURE

        2. 2.ROLLING STOCK

        3. 3.COMPATIBILITY OF THE TRANS-EUROPEAN CONVENTIONAL RAILWAY SYSTEM

        4. 4.EXTENSION OF THE SCOPE

        5. 1.Subcategories of lines and rolling stock In order to deliver...

        6. 2.Cost safeguards The cost-benefit analysis of the proposed measures will...

    3. SCHEDULE 3

      (This Schedule reproduces the provisions of Annex II to the High-Speed Directive)

      1. SUBSYSTEMS OF THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM

        1. SUBSYSTEMS

        2. 1.LIST OF SUBSYSTEMS

        3. 2.AREAS TO BE COVERED

    4. SCHEDULE 4

      (This Schedule reproduces Annex II to the Conventional Directive)

      1. SUBSYSTEMS OF THE TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM

        1. 1.LIST OF SUBSYSTEMS

        2. 2.DESCRIPTION OF THE SUBSYSTEMS

        3. 2.1.Infrastructure: The track points, engineering structures (bridges, tunnels, etc.), associated...

        4. 2.2.Energy: The electrification system, overhead lines and current collectors.

        5. 2.3.Control and command and signalling: All the equipment necessary to...

        6. 2.4.Traffic operation and management: The procedures and related equipment enabling...

        7. 2.5.Telematics applications: In accordance with Annex I, this subsystem comprises...

        8. 2.6.Rolling stock: Structure, command and control system for all train...

        9. 2.7.Maintenance: The procedures, associated equipment, logistics centres for maintenance work...

    5. SCHEDULE 5

      (This Schedule reproduces Annex III to the High-Speed Directive)

      1. ESSENTIAL REQUIREMENTS FOR THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM

        1. 1.ESSENTIAL REQUIREMENTS

        2. 1.1.Safety

        3. 1.1.1.The design, construction or assembly, maintenance and monitoring of safety-critical...

        4. 1.1.2.The parameters involved in the wheel/rail contact must meet the...

        5. 1.1.3.The components used must withstand any normal or exceptional stresses...

        6. 1.1.4.The design of fixed installations and rolling stock and the...

        7. 1.1.5.Any devices intended to be handled by users must be...

        8. 1.2.Reliability and availability The monitoring and maintenance of fixed or...

        9. 1.3.Health

        10. 1.3.1.Materials likely, by virtue of the way they are used,...

        11. 1.3.2.Those materials must be selected, deployed and used in such...

        12. 1.4.Environmental protection

        13. 1.4.1.The repercussions on the environment of the establishment and operation...

        14. 1.4.2.The materials used in the trains and infrastructures must prevent...

        15. 1.4.3.The rolling stock and energy-supply systems must be designed and...

        16. 1.5.Technical compatibility The technical characteristics of the infrastructures and fixed...

        17. 2.Requirements specific to each subsystem

        18. 2.1.Infrastructures

        19. 2.1.1.Safety Appropriate steps must be taken to prevent access to...

        20. 2.2.Energy

        21. 2.2.1.Safety Operation of the energy-supply systems must not impair the...

        22. 2.2.2.Environmental protection The functioning of the energy-supply systems must not...

        23. 2.2.3.Technical compatibility The electricity supply systems used throughout the trans-European...

        24. 2.3.Control and command and signalling

        25. 2.3.1.Safety The control and command and signalling installation and procedures...

        26. 2.3.2.Technical compatibility All new high-speed infrastructures and all new high-speed...

        27. 2.4.Rolling stock

        28. 2.4.1.Safety The rolling-stock structures and those of the links between...

        29. 2.4.2.Reliability and availability The design of the vital equipment and...

        30. 2.4.3.Technical compatibility The electrical equipment must be compatible with the...

        31. 2.4.4.Controls Trains must be equipped with a recording device. The...

        32. 2.5.Maintenance

        33. 2.5.1.Health The technical installations and the procedures used in the...

        34. 2.5.2.Environmental protection The technical installations and the procedures used in...

        35. 2.5.3.Technical compatibility The maintenance installations on high-speed trains must be...

        36. 2.6.Environment

        37. 2.6.1.Health Operation of the trans-European high-speed rail system must remain...

        38. 2.6.2.Environmental protection Operation of the trans-European high-speed rail system must...

        39. 2.7.Operation

        40. 2.7.1.Safety Alignment of the network operating rules and the qualifications...

        41. 2.7.2.Reliability and availability The operation and maintenance periods, the training...

        42. 2.7.3.Technical compatibility The alignment of the operating rules of the...

    6. SCHEDULE 6

      (This Schedule reproduces Annex III to the Conventional Directive)

      1. ESSENTIAL REQUIREMENTS FOR THE TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM

        1. 1.GENERAL REQUIREMENTS

        2. 1.1.Safety

        3. 1.1.1.The design, construction or assembly, maintenance and monitoring of safety-critical...

        4. 1.1.2.The parameters involved in the wheel/rail contact must meet the...

        5. 1.1.3.The components used must withstand any normal or exceptional stresses...

        6. 1.1.4.The design of fixed installations and rolling stock and the...

        7. 1.1.5.Any devices intended to be handled by users must be...

        8. 1.2.Reliability and availability The monitoring and maintenance of fixed or...

        9. 1.3.Health

        10. 1.3.1.Materials likely, by virtue of the way they are used,...

        11. 1.3.2.Those materials must be selected, deployed and used in such...

        12. 1.4.Environmental protection

        13. 1.4.1.The environmental impact of establishment and operation of the trans-European...

        14. 1.4.2.The materials used in the trains and infrastructure must prevent...

        15. 1.4.3.The rolling stock and energy-supply systems must be designed and...

        16. 1.4.4.Operation of the trans-European conventional rail system must respect existing...

        17. 1.4.5.Operation of the trans-European conventional rail system must not give...

        18. 1.5.Technical compatibility The technical characteristics of the infrastructure and fixed...

        19. 2.REQUIREMENTS SPECIFIC TO EACH SUBSYSTEM

        20. 2.1.Infrastructure

        21. 2.1.1.Safety Appropriate steps must be taken to prevent access to...

        22. 2.2.Energy

        23. 2.2.1.Safety Operation of the energy-supply systems must not impair the...

        24. 2.2.2.Environmental protection The functioning of the electrical or thermal energy-supply...

        25. 2.2.3.Technical compatibility The electricity/thermal energy supply systems used must: enable...

        26. 2.3.Control and command and signalling

        27. 2.3.1.Safety The control and command and signalling installations and procedures...

        28. 2.3.2.Technical Compatibility All new infrastructure and all new rolling stock...

        29. 2.4.Rolling stock

        30. 2.4.1.Safety The structure of the rolling stock and of the...

        31. 2.4.2.Reliability and availability The design of the vital equipment, of...

        32. 2.4.3.Technical compatibility The electrical equipment must be compatible with the...

        33. 2.4.4.Controls Trains must be equipped with a recording device. The...

        34. 2.5.Maintenance

        35. 2.5.1.Health and safety The technical installations and the procedures used...

        36. 2.5.2.Environmental protection The technical installations and the procedures used in...

        37. 2.5.3.Technical compatibility The maintenance installations for conventional rolling stock must...

        38. 2.6.Operation and traffic management

        39. 2.6.1.Safety Alignment of the network operating rules and the qualifications...

        40. 2.6.2.Reliability and availability The maintenance operations and periods, the training...

        41. 2.6.3.Technical compatibility Alignment of the network operating rules and the...

        42. 2.7.Telematics applications for freight and passengers

        43. 2.7.1.Technical compatibility The essential requirements for telematics applications guarantee a...

        44. 2.7.2.Reliability and availability The methods of use, management, updating and...

        45. 2.7.3.Health The interfaces between these systems and users must comply...

        46. 2.7.4.Safety Suitable levels of integrity and dependability must be provided...

    7. SCHEDULE 7

      (This Schedule substantially reproduces the provisions of Annex IV to the High-Speed Directive and to the Conventional Directive)

      1. CONFORMITY AND SUITABILITY FOR USE OF INTEROPERABILITY CONSTITUENTS

        1. 1.INTEROPERABILITY CONSTITUENTS

        2. 1.1.Multiple-use constituents These are constituents that are not specific to...

        3. 1.2.Multiple-use constituents having specific characteristics These are constituents which are...

        4. 1.3.Specific constituents These are constituents that are specific to railway...

        5. 2.SCOPE

        6. 3.CONTENTS OF THE `EC' DECLARATION

    8. SCHEDULE 8

      (This Schedule substantially reproduces the provisions of Annex V to the High-Speed Directive and to the Conventional Directive)

      1. DECLARATION OF VERIFICATION OF SUBSYSTEMS

    9. SCHEDULE 9

      (This Schedule substantially reproduces, with minor modifications, the provisions of Annex VI to the High-Speed Directive and to the Conventional Directive)

      1. VERIFICATION PROCEDURE FOR SUBSYSTEMS

        1. 1.INTRODUCTION

        2. 2.STAGES

        3. 3.CERTIFICATE

        4. 4.TECHNICAL FILE

        5. 5.MONITORING

        6. 5.1.The aim of EC monitoring is to ensure that the...

        7. 5.2.The notified body responsible for checking production must have permanent...

        8. 5.3.The notified body responsible for checking implementation must periodically carry...

        9. 5.4.In addition, the notified body may pay unexpected visits to...

        10. 6.SUBMISSION

        11. 7.PUBLICATION

        12. 8.LANGUAGE

    10. SCHEDULE 10

      (This Schedule substantially reproduces the provisions of Annex VII to the High-Speed Directive and to the Conventional Directive)

      1. MINIMUM CRITERIA WHICH MUST BE TAKEN INTO ACCOUNT BY THE MEMBER STATES WHEN NOTIFYING BODIES

        1. 1.The body, its Director and the staff responsible for carrying...

        2. 2.The body and the staff responsible for the checks must...

        3. 3.The body must employ staff and possess the means required...

        4. 4.The staff responsible for the checks must possess: proper technical...

        5. 5.The independence of the staff responsible for the checks must...

        6. 6.The body must take out civil liability insurance unless that...

        7. 7.The staff of the body are bound by professional secrecy...

    11. SCHEDULE 11

      HIGH-SPEED RAIL SYSTEM

  10. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources