- Latest available (Revised)
- Original (As made)
There are multiple versions of this provision on screen. These apply to different geographical extents.
The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.
Sometimes the text of a provision is changed, but the change(s) only apply to a particular geographical area. In some limited cases where this happens, the editorial team create a version for each different geographical area. Multiple versions are only created in this way where the change in question is a substitution so that there are different versions of the text for the different extents. Insertions and repeals of text do not give rise to such multiple versions.
There are currently no known outstanding effects for the The Recreational Craft Regulations 2017, Section 44.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
44.—(1) With regard to the design and construction of recreational craft, the following conformity assessment procedures set out in [F1Schedule 15] apply—
(a)for design categories A and B referred to in paragraph 1 of Part A of Schedule 1—
(i)for recreational craft of hull length from 2.5 metres to less than 12 metres, any of the following modules—
(aa)Module A1 (internal production control plus supervised product testing);
(bb)Module B [F2(type examination)] together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);
(cc)Module G (conformity based on unit verification);
(dd)Module H (conformity based on full quality assurance);
(ii)for recreational craft of hull length from 12 metres to less than 24 metres, any of the following modules—
(aa)Module B [F2(type examination)] together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(bb)Module G (conformity based on unit verification);
(cc)Module H (conformity based on full quality assurance);
(b)for design category C referred to in paragraph 1 of Part A of Schedule 1—
(i)for recreational craft of hull length from 2.5 metres to less than 12 metres where the [F3designated] standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are complied with, any of the following modules—
(aa)Module A (internal production control);
(bb)Module A1 (internal production control plus supervised product testing);
(cc)Module B ([F4type examination] together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(dd)Module G (conformity based on unit verification);
(ee)Module H (conformity based on full quality assurance);
(ii)for recreational craft of hull length from 2.5 metres to less than 12 metres where the [F3designated] standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are not complied with, any of the following modules—
(aa)Module A1 (internal production control plus supervised testing);
(bb)Module B ([F4type examination]) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;
(cc)Module G (conformity based on unit verification);
(dd)Module H (conformity based on full quality assurance);
(iii)for recreational craft of hull length from 12 metres to 24 metres, any of the following modules—
(aa)Module B ([F4type examination]) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;
(bb)Module G (conformity based on unit verification);
(cc)Module H (conformity based on full quality assurance);
(c)for design category D referred to in paragraph 1 of Part A of Schedule 1 for recreational craft of hull length of 2.5 metres to 24 metres, any of the following modules—
(i)Module A (internal production control);
(ii)Module A1 (internal production control plus supervised testing);
(iii)Module B ([F5type examination] together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);
(iv)Module G (conformity based on unit verification);
(v)Module H (conformity based on full quality assurance).
(2) With regard to the design and construction of personal watercraft, any of the following procedures set out in [F6Schedule 15] apply—
(a)Module A (internal production control);
(b)Module A1 (internal production control plus supervised testing);
(c)Module B ([F7type examination] together with Module C conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(d)Module G (conformity based on unit verification);
(e)Module H (conformity based on full quality assurance).
(3) With regard to the design and construction of components any of the following procedures set out in [F8Schedule 15] apply—
(a)Module B [F9(type examination)] together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(b)Module G (conformity based on unit verification);
(c)Module H (conformity based on full quality assurance).
Extent Information
E1This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Textual Amendments
F1Words in reg. 44(1) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(2)(a) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F2Words in reg. 44(1)(a) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(2)(b) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F3Word in reg. 44(1)(b) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(2)(c)(ii) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F4Words in reg. 44(1)(b) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(2)(c)(i) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F5Words in reg. 44(1)(c)(iii) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(2)(d) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F6Words in reg. 44(2) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(3) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F7Words in reg. 44(2)(c) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(4) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F8Words in reg. 44(3) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(3) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F9Words in reg. 44(3)(a) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 26(5) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Commencement Information
I1Reg. 44 in force at 3.8.2017, see reg. 1
44.—(1) With regard to the design and construction of recreational craft, the following conformity assessment procedures set out in Annex II to Decision 768/2008/EC apply—
(a)for design categories A and B referred to in paragraph 1 of Part A of Schedule 1—
(i)for recreational craft of hull length from 2.5 metres to less than 12 metres, any of the following modules—
(aa)Module A1 (internal production control plus supervised product testing);
(bb)Module B (EU-type examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);
(cc)Module G (conformity based on unit verification);
(dd)Module H (conformity based on full quality assurance);
(ii)for recreational craft of hull length from 12 metres to less than 24 metres, any of the following modules—
(aa)Module B (EU-type examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(bb)Module G (conformity based on unit verification);
(cc)Module H (conformity based on full quality assurance);
(b)for design category C referred to in paragraph 1 of Part A of Schedule 1—
(i)for recreational craft of hull length from 2.5 metres to less than 12 metres where the harmonised standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are complied with, any of the following modules—
(aa)Module A (internal production control);
(bb)Module A1 (internal production control plus supervised product testing);
(cc)Module B (EU type-examination together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(dd)Module G (conformity based on unit verification);
(ee)Module H (conformity based on full quality assurance);
(ii)for recreational craft of hull length from 2.5 metres to less than 12 metres where the harmonised standards relating to paragraphs 3.2 and 3.3 of Part A of Schedule 1 are not complied with, any of the following modules—
(aa)Module A1 (internal production control plus supervised testing);
(bb)Module B (EU type-examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;
(cc)Module G (conformity based on unit verification);
(dd)Module H (conformity based on full quality assurance);
(iii)for recreational craft of hull length from 12 metres to 24 metres, any of the following modules—
(aa)Module B (EU type-examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification;
(bb)Module G (conformity based on unit verification);
(cc)Module H (conformity based on full quality assurance);
(c)for design category D referred to in paragraph 1 of Part A of Schedule 1 for recreational craft of hull length of 2.5 metres to 24 metres, any of the following modules—
(i)Module A (internal production control);
(ii)Module A1 (internal production control plus supervised testing);
(iii)Module B (EU- type examination together with Module C (conformity to type based on internal production control)), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on product quality assurance) or Module F (conformity to type based on product verification);
(iv)Module G (conformity based on unit verification);
(v)Module H (conformity based on full quality assurance).
(2) With regard to the design and construction of personal watercraft, any of the following procedures set out in Annex II to Decision 768/2008/EC apply—
(a)Module A (internal production control);
(b)Module A1 (internal production control plus supervised testing);
(c)Module B (EU type-examination together with Module C conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(d)Module G (conformity based on unit verification);
(e)Module H (conformity based on full quality assurance).
(3) With regard to the design and construction of components any of the following procedures set out in Annex II to Decision 768/2008/EC apply—
(a)Module B (EU type-examination) together with Module C (conformity to type based on internal production control), Module D (conformity to type based on quality assurance of the production process), Module E (conformity to type based on quality product assurance) or Module F (conformity to type based on product verification);
(b)Module G (conformity based on unit verification);
(c)Module H (conformity based on full quality assurance).
Extent Information
E2This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only
Commencement Information
I2Reg. 44 in force at 3.8.2017, see reg. 1
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: